[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980841":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980841,709,1,"单选题","下列（ ）选项的组合所提的内容能全面而准确地表达合同文本中规定可以采用的工程勘察计取的收费方式。 I.按国家规定的现行《工程勘察设计收费标准》（2002年修订本） II.按发包人规定的最低价 III.按预算包干 IV.按中标价加签证 V.按勘察人自订的收费标准 VI.按实际完成的工作量估算",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","I、II、IV、V",false,{"key":16,"text":17,"correct":14},"B","I、II、IV、VI",{"key":19,"text":20,"correct":21},"C","I、III、IV、VI",true,{"key":23,"text":24,"correct":14},"D","III、IV、V、VI","发包人规定的最低价与勘察人自订的收费标准均不是合同文本中规定可以采用的工程勘察计取的收费方式。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]