[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980833":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},980833,709,1,"单选题","滑坡监测不包括( ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","滑坡体的位移",false,{"key":16,"text":17,"correct":14},"B","滑面位置及错动",{"key":19,"text":20,"correct":14},"C","滑坡裂缝的发生和发展",{"key":22,"text":23,"correct":24},"D","滑坡体质量",true,"根据《岩土工程勘察规范》（GB 50021-2001）(2009年版)第13. 3.4条，滑坡监测应包括：①滑坡体的位移；②滑面位置及错动；③滑坡裂缝的发生和发展；④滑坡体内外地下水位、流向、泉水流量和滑带孔隙压力；⑤支挡结构及其他工程设施的位移、变形、裂缝的发生和发展。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]