[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980825":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},980825,709,1,"单选题","铁路通过多年冻土带，下列情况适用采用破坏多年冻土的设计原则的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","连续多年冻土带",false,{"key":16,"text":17,"correct":14},"B","不连续多年冻土带",{"key":19,"text":20,"correct":14},"C","地面保温条件好的岛状多年冻土带",{"key":22,"text":23,"correct":24},"D","地面保温条件差的岛状多年冻土带",true,"根据《铁路特殊路基设计规范》（TB 10035 — 2002）第7. 1. 8条，在连续多年冻土带、不连续多年冻土带和保温条件好的岛状多年冻土带，应按保护多年冻土的原则设计。在人为活动频繁、地面保温条件差的岛状多年冻土带应按破坏多年冻土的原则设计。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]