[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980809":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980809,709,1,"单选题","关于黄土地基预浸水处理，下列说法不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","该法可消除地面6m以下土层的全部湿陷性",true,{"key":16,"text":17,"correct":18},"B","该法适用于自重湿陷量计算值不小于500mm的所有自重湿陷性场地",false,{"key":20,"text":21,"correct":18},"C","浸水坑边缘至既有建筑物的距离不宜小于50m",{"key":23,"text":24,"correct":18},"D","浸水结束后，应重新评定地基土的湿陷性","根据《湿陷性黄土地区建筑规范》(GB 50025 — 2004)第6. 5. 2条，预浸水法可用于处理湿陷性土层厚度大于10m，自重湿陷量不小于50cm的场地。预浸水处理地基的施工，应符合下列规定：①浸水基坑边缘至已有建筑物的距离不宜小于50m，并应防止由于浸水影响附近建筑物和场地边坡的稳定性；②浸水坑的边长不得小于湿陷性土层的厚度。当浸水坑的面积较大时，可分段进行浸水；③浸水坑内水水头高度不宜小于30cm,连续浸水时间以湿陷变形稳定为准，其稳定标准为最后5天的平均湿陷量小于 1mm\u002Fd。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]