[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980804":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980804,709,1,"单选题","湿陷性黄土详细勘察阶段，取土勘探点不得少于全部勘探点的（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1\u002F4",false,{"key":16,"text":17,"correct":14},"B","1\u002F2",{"key":19,"text":20,"correct":21},"C","2\u002F3",true,{"key":23,"text":24,"correct":14},"D","3\u002F4","根据《湿陷性黄土地区建筑规范》(GB 50025—2004)第4. 2. 3条第2款和第4. 2. 4 条第4款，初步勘察阶段，取土勘探点数量不得少于全部勘探点的1\u002F2；详细勘察阶段，勘探点不得少于全部勘探点的2\u002F3。若勘探点的间距较大或其数量不多时，全部勘探点可作为取土勘探点。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]