[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980722":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980722,709,1,"单选题","在进行土石坝渗流计算时所包括的内容有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","流速、流量",false,{"key":16,"text":17,"correct":14},"B","渗透变形、坝基扬压力、流量",{"key":19,"text":20,"correct":21},"C","渗流压力、流速、流量",true,{"key":23,"text":24,"correct":14},"D","渗流断面、渗流压力","根据《碾压式土石坝设计规范》（SL 274—2001）第8. 1. 1条，渗流计算应包括： ①确定坝体浸润线及其下游出逸点位置，绘制坝体及坝基内的等势线分布图或流网图； ②确定坝体与坝基的渗流量；③确定坝坡出逸段与下游坝基表面的出逸比降，以及不同土层之间的渗透比降；④确定库水位降落时上游坝坡内的浸润线位置或孔隙压力； ⑤确定坝肩的等势线、渗流量和渗透比降。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]