[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980720":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},980720,709,1,"单选题","水利水电工程勘察阶段分为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","初步设计、详细设计",false,{"key":16,"text":17,"correct":18},"B","规划、项目建议书、可行性研究、初步设计、招标设计、施工详图设计",true,{"key":20,"text":21,"correct":14},"C","初步设计、详细设计、施工设计",{"key":23,"text":24,"correct":14},"D","可行性研究、初步设计、施工设计","根据《水利水电工程地质勘察规范》（GB 50487—2008）第1.0. 3条，水利水电工程地质勘察易分为规划、项目建议书、可行性研究、初步设计、招标设计和施工详图设计等六阶段。项目建议书阶段的勘察工作应基本满足可行性研究阶段的深度要求。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]