[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980648":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980648,709,1,"单选题","某建筑桩基施工工法为：桩管到达预定标高后，灌满混凝土，先振动，再拔管，每次拔管高度0.5 ~ 1.0m，然后再沉管，约0.3 ~ 0.5m，并不断添加填料，直至成桩，该工法称为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","夯压法",false,{"key":16,"text":17,"correct":14},"B","复打法",{"key":19,"text":20,"correct":21},"C","反插法",true,{"key":23,"text":24,"correct":14},"D","键击法","根据《建筑桩基技术规范》94—2008)第6. 5.9条，反插法施工应符合下列规 定：①桩管灌满混凝土之后，先振动再拔管，每次拔管高度0.5~L0m,反插深度0.3 ~ 0.5m；在拔管过程中，应分段添加混凝土，保持管内混凝土面始终不低于地表面或高于地下水位1.0~1. 5m以上，拔管速度应小于0.5m\u002Fmin;②在距桩尖处的1、. 5m范围内，宜多次反插以扩大桩的端部断面；③穿过淤泥夹层时，应当放慢拔管速度，并减少拔管高度和反插深度，在流动性淤泥中不宜使用反插法；④振动、振动冲击沉管灌注桩复打时，工艺要求同锤击沉管灌注桩要求。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]