[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980523":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980523,709,1,"单选题","下列（ ）不是设计地震动参数。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地震活动周期",true,{"key":16,"text":17,"correct":18},"B","地震加速度时程曲线",false,{"key":20,"text":21,"correct":18},"C","加速度反应谱",{"key":23,"text":24,"correct":18},"D","峰值加速度","《建筑抗震设计规范》(GB 50011—2010)第2. 1. 5条规定，设计地震动参数是指抗震设计用的地震加速度（速度、位移）时程曲线、加速度反应谱和峰值加速度。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]