[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},980453,709,1,"单选题","对相邻桩搭接要求严格的工程，应在成桩（ ）天后进行质量检验。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","15",true,{"key":20,"text":21,"correct":14},"C","28",{"key":23,"text":24,"correct":14},"D","90","根据《建筑地基处理技术规范》（JGJ 79—2002）第11.4.4条及第11.4.5条，水泥土搅拌桩载荷试验必须在桩身强度满足试验荷载条件时，并宜在成桩28d后进行。 检验数量为桩总数的0.5% ~1%，且每项单体工程不应少于3点。对相邻桩搭接要求严格的工程，应在成桩15d后，选取数根桩进行开挖，检查搭接情况。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]