[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980437":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980437,709,1,"单选题","为了消除在永久荷载使用期的变形，现采用砂井堆载预压法处理地基，下述哪一种设计方案比较有效？（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预压荷载等于80%永久荷载，加密砂井间距",false,{"key":16,"text":17,"correct":14},"B","等荷预压，延长预压时间",{"key":19,"text":20,"correct":21},"C","超载预压",true,{"key":23,"text":24,"correct":14},"D","真空预压","在永久荷载使用期内，由于上部传来的荷载很大，所以采用超载预压法来处理地基较为有效。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]