[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980299":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980299,709,1,"单选题","当地基土为饱和软黏土且荷载施加速率较快时，三轴试验宜采用（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","固结不排水剪切试验",false,{"key":16,"text":17,"correct":14},"B","不固结不排水剪切试验",{"key":19,"text":20,"correct":21},"C","自重压力预固结条件下的不固结不排水剪切试验",true,{"key":23,"text":24,"correct":14},"D","固结排水剪切试验","对饱和黏性土，当加荷速率较快时宜采用不固结不排水（UU）剪切试验；而且饱和软土还应在自重压力下预固结条件下进行试验。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]