[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980291":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},980291,709,1,"单选题","工程计算中是通过（ ）获取土的变形模量。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","直接剪切试验",false,{"key":16,"text":17,"correct":14},"B","三轴压缩试验",{"key":19,"text":20,"correct":14},"C","固结试验",{"key":22,"text":23,"correct":24},"D","平板载荷试验",true,"工程计算中，直接剪切试验确定土的剪切模量；三轴压缩试验确定土的三轴抗压强度；固结试验确定土的固结度；平板载荷试验确定土的变形模量。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]