[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980278":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980278,709,1,"单选题","根据《岩土工程勘察规范》（GB 50021—2001 )(2009年版），下列关于风化岩与残积土的勘探测试原则的描述不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","勘探点间距应取本规范第四章规定值的平均值",true,{"key":16,"text":17,"correct":18},"B","宜在探井中或采用二（三）重回转取土器采取试样",false,{"key":20,"text":21,"correct":18},"C","原位测试可采用圆锥动力触探、标准贯入、波速测试、载荷试验等方法",{"key":23,"text":24,"correct":18},"D","对残积土必要时进行湿陷性和湿化试验","根据《岩土工程勘察规范》（GB 50021—2001) (2009年版）第6. 9. 3条规定，风化岩和残积土的勘探测试应遵守的原则包括：①勘探点间距应取《岩土工程勘察规范》 (GB 50021 —2001) (2009年版）第4章规定的小值；②应有一定数量的探井；③宜在探 井中或用双重管、三重管采取试样，每一风化带不应少于3组；④宜采用原位测试与室内试验相结合，原位测试可采用圆锥动力触探、标准贯入试验、波速测试和载荷试验；⑤对相当于极软岩和极破碎的岩体，可按土工试验要求进行，对残积土，必要时应进行湿陷性和湿化试验。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]