[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},980257,709,1,"单选题","房屋建筑工程在详细勘察阶段，工程地质测绘的比例尺应为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1：50 ~1：500",false,{"key":16,"text":17,"correct":18},"B","1:500 ?1:2000",true,{"key":20,"text":21,"correct":14},"C","1 ： 2000 ~ 1 ： 10000",{"key":23,"text":24,"correct":14},"D","1 ： 5000 ~ 1 ： 50000","根据《岩土工程勘察规范》（GB 50021- 2001) (2009年版）第8. 0. 3条规定，工程地质测绘的比例尺为：①可行性研究勘察可选用1:5000 ~1：50000；②初步勘察可选用1: 2000 ~ 1 ： 10000；③详细勘察可选用1：500 ~ 1: 2000；④条件复杂时，比例尺可适当放大。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]