[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980256":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980256,709,1,"单选题","在铁路工程地质测绘中，在下列（ ）情况下，地层的地质年代单元划分到组。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","全线工程地质图，一般地段",false,{"key":16,"text":17,"correct":14},"B","全线工程地质图，有影响线路方案的地层",{"key":19,"text":20,"correct":21},"C","详细工程地质图，地质条件复杂的地段",true,{"key":23,"text":24,"correct":14},"D","工点工程地质图，地质构造不复杂，不良地质现象不发育的地段","铁路工程地质测绘中，地层单元的划分应根据工作阶段、成图比例、岩性与工程的关系确定。全线工程地质图地层单元宜划分到系，影响线路方案的地层，应划分到统；详细工程地质图宜划分到统，当构造复杂、不良地质发育受地层控制时，地层单元宜划分到组，必要时可细划至段。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]