[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980211":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980211,709,1,"单选题","根据《岩土工程勘察规范》（GB 50021一2001)(2009年版）勘察时，边坡工程不包括的阶段是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可行性研究勘察",true,{"key":16,"text":17,"correct":18},"B","初步勘察",false,{"key":20,"text":21,"correct":18},"C","详细勘察",{"key":23,"text":24,"correct":18},"D","施工勘察","根据《岩土工程勘察规范》(GB 50021 一2001) (2009年版)第4. 7. 2条规定，一般情况下，边坡勘察和建筑物的勘察同步进行；大型边坡的专门性勘察宜分阶段进行，一般分为初步勘察阶段、详细勘察阶段和施工勘察阶段。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]