[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980209":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},980209,709,1,"单选题","根据《岩土工程勘察规范》（GB 50021—2001) (2009年版），对于废渣材料加高坝的勘察工作布置，叙述错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可按堆积规模垂直坝轴线布设不少于三条勘探线",false,{"key":16,"text":17,"correct":18},"B","勘探点间距按100m布置",true,{"key":20,"text":21,"correct":14},"C","一般勘探孔应进入自然地面以下一定深度",{"key":23,"text":24,"correct":14},"D","控制性勘探孔深度应能查明可能存在的软弱层","根据《岩土工程勘察规范》(GB 50021-2001) （2009年版）第4. 5. 12条规定，废渣材料加高坝的勘察，应采用勘探、原位测试和室内试验的方法；可按堆积规模垂直坝轴线布设不少于三条勘探线，勘探点间距在堆场内可适当增大；一般勘探孔深度应进入自然地面以下一定深度，控制性勘探孔深度应能查明可能存在的软弱层。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]