[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980208":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980208,709,1,"单选题","海港码头工程初步设计阶段勘察，码头不在岸坡明显地区，在确定勘探工作量时，其勘探线应首先考虑按（ ）进行布置。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","平行码头长轴方向",true,{"key":16,"text":17,"correct":18},"B","平行码头短轴方向",false,{"key":20,"text":21,"correct":18},"C","垂直岸坡方向",{"key":23,"text":24,"correct":18},"D","平行岸坡方向","根据《港14工程地质勘察规范》（JTJ 240—1997)第5. 2. 5. 3条，海港水工建筑物区域，勘探线应按平行于水工建筑长轴方向布置，似当建筑物位于岸坡明显地区时，勘探点、勘探线宜按垂直岸向布置。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]