[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980204":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},980204,709,1,"单选题","根据《岩土工程勘察规范》（GB50021 —2001） （2009年版），对于高层建筑详细勘察阶段勘探点的布置原则，下列叙述错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","勘探点应按建筑物周边线布置，角点和中心点应有勘探点",false,{"key":16,"text":17,"correct":14},"B","勘探点间距宜取15?35m",{"key":19,"text":20,"correct":14},"C","特殊体形的建筑物，应按其体形变化布置勘探点",{"key":22,"text":23,"correct":24},"D","单幢高层建筑的勘探点不应少于3个",true,"根据《岩土工程勘察规范》(GB 50021 —2001)(2009年版)第4. 1. 17条规定，详细勘察单栋高层建筑勘探点的布置，应满足对地基均匀性评价的要求，且不应少于4个；对密集的高层建筑群，勘探点可适当减少，但每栋建筑物至少应有1个控制性勘探点。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]