[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980203":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980203,709,1,"单选题","场地较小且无特殊要求的工程可合并勘察阶段。当建筑物平面布置已经确定，且场地或其附近巳有岩土工程资料时，可根据实际情况，直接进行（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","可行性研究勘察",false,{"key":16,"text":17,"correct":14},"B","初步勘察",{"key":19,"text":20,"correct":21},"C","详细勘察",true,{"key":23,"text":24,"correct":14},"D","施工勘察","初步勘察的目的就是为了获得岩土工程的大概资料。场地较小且无特殊要求的工程可合并勘察阶段。当建筑物平面布置已经确定，且场地或其附近已有岩土工程资料时，可以直接进行详细勘察。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]