[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-707-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},707,"岩土专业基础知识","建筑工程",0,8,50,1211,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,211,221,233,245,255,267,279,290,302,314,326,338,347,359,371,383,391,403,415,427,439,451,463,475,487,499,511,520,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},979298,1,"单选题","关于砌砖工程使用的材料，下列哪条是不正确的？",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","使用砖的品种、强度等级、外观符合设计要求，并有出厂合格证",false,{"key":24,"text":25,"correct":26},"B","对强度等级小于M5的水泥混合砂浆，含泥量在15 %以内",true,{"key":28,"text":29,"correct":22},"C","石灰膏熟化时间已经超过了15d",{"key":31,"text":32,"correct":22},"D","水泥的品种与标号符合砌筑砂浆试配单的要求","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},979299,"砖砌体的灰缝应砂浆饱满，普通粘土砖砌体水平灰缝的砂浆饱满度，按质量标准规定应不小于：",[38,40,42,44],{"key":20,"text":39,"correct":26},"80%",{"key":24,"text":41,"correct":22},"85%",{"key":28,"text":43,"correct":22},"90%",{"key":31,"text":45,"correct":22},"95%",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},979300,"同一验收批砂浆试块抗压强度平均值，按质量标准规定不得低于下述哪个强度？",[50,52,54,56],{"key":20,"text":51,"correct":22},"0. 75倍设计强度",{"key":24,"text":53,"correct":22},"设计强度",{"key":28,"text":55,"correct":26},"1. 10倍设计强度",{"key":31,"text":57,"correct":22},"1.15倍设计强度",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},979301,"砖墙砌体如需留槎时，应留斜槎，如墙高为 H，斜槎长度应为：",[62,64,66,68],{"key":20,"text":63,"correct":22},"1H",{"key":24,"text":65,"correct":26},"2H\u002F3",{"key":28,"text":67,"correct":22},"H\u002F2",{"key":31,"text":69,"correct":22},"H\u002F3",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},979302,"砖墙砌体可留直槎时，应放拉结钢筋，下列哪一条不正确？",[74,76,78,80],{"key":20,"text":75,"correct":22},"每1\u002F2砖厚放一根钢筋",{"key":24,"text":77,"correct":26},"拉结钢筋沿墙高间距大于500mm",{"key":28,"text":79,"correct":22},"留槎处算起钢筋每边长大于500mm",{"key":31,"text":81,"correct":22},"端部弯成90°弯钩",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},979303,"砌体施工质量控制等级可分为下述哪几个等级？",[86,88,90,92],{"key":20,"text":87,"correct":22},"1、2、3",{"key":24,"text":89,"correct":26},"A、B、C",{"key":28,"text":91,"correct":22},"甲、乙、丙、丁",{"key":31,"text":93,"correct":22},"优、良、及格",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},979304,"混合结构每层承重墙、砖砌台阶水平面及砖砌体挑出层的最上一皮砖应如何砌筑？",[98,100,102,104],{"key":20,"text":99,"correct":26},"丁砖",{"key":24,"text":101,"correct":22},"顺砖",{"key":28,"text":103,"correct":22},"侧砖",{"key":31,"text":105,"correct":22},"立砖斜砌",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},979305,"砖砌体工程在施工时，相邻施工段的砌筑高度差不宜超过一个楼层，也不宜大于多少？",[110,112,114,116],{"key":20,"text":111,"correct":22},"3m",{"key":24,"text":113,"correct":22},"5m",{"key":28,"text":115,"correct":26},"4m",{"key":31,"text":117,"correct":22},"4. 5m",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},979306,"构造柱与砖墙接槎处，砖墙应砌成马牙槎，每一个马牙槎沿高度方向尺寸，不应超过：",[122,124,126,128],{"key":20,"text":123,"correct":22},"100mm",{"key":24,"text":125,"correct":22},"150mm",{"key":28,"text":127,"correct":22},"200mm",{"key":31,"text":129,"correct":26},"300mm",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},979307,"关于砖墙施工工艺顺序，下面所述哪个正确？",[134,136,138,140],{"key":20,"text":135,"correct":22},"放线-抄平-立皮数杆-砌砖-清理",{"key":24,"text":137,"correct":22},"抄平-放线-立皮数杆-砌砖-清理",{"key":28,"text":139,"correct":26},"抄平-放线-摆砖样-立皮数杆-砌砖-清理",{"key":31,"text":141,"correct":22},"抄平-放线-立皮数摆砖样-砌砖-清理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},979308,"关于皮数杆的作用，下述哪条是正确的？",[146,148,150,152],{"key":20,"text":147,"correct":22},"保证砌体在施工中的稳定性",{"key":24,"text":149,"correct":26},"控制砌体的竖向尺寸",{"key":28,"text":151,"correct":22},"保证墙面平整",{"key":31,"text":153,"correct":22},"检查游丁走缝",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},979309,"在砖砌体施工的质量检验中，对墙面垂直度偏差要求的允许值，每层是：",[158,160,162,164],{"key":20,"text":159,"correct":22},"3 mm",{"key":24,"text":161,"correct":26},"5mm",{"key":28,"text":163,"correct":22},"8mm",{"key":31,"text":165,"correct":22},"10mm",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},979310,"砌块砌筑中，砌块竖缝宽超过多少时，就应该用细石混凝土填筑？",[170,171,173,175],{"key":20,"text":165,"correct":22},{"key":24,"text":172,"correct":22},"15mm",{"key":28,"text":174,"correct":26},"30mm",{"key":31,"text":176,"correct":22},"20mm",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},979311,"按规范规定，首层室内地面以下或防潮层以下的混凝土小型空心砲块，应用混凝土填实，其强度最低不能小于：",[181,183,185,187],{"key":20,"text":182,"correct":22},"C15",{"key":24,"text":184,"correct":26},"C20",{"key":28,"text":186,"correct":22},"C30",{"key":31,"text":188,"correct":22},"C25",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},979312,"在混凝土及钢筋混凝土芯柱施工中，待砌筑砂浆强度大于多少时，方可灌注芯柱混凝土？",[193,195,197,199],{"key":20,"text":194,"correct":22},"0. 5MPa",{"key":24,"text":196,"correct":26},"1MPa",{"key":28,"text":198,"correct":22},"1. 2MPa",{"key":31,"text":200,"correct":22},"1. 5MPa",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},979313,"小砌块墙体的搭砌长度不得少于块高的1\u002F3，且不应少于多少？",[205,207,209,210],{"key":20,"text":206,"correct":22},"80mm",{"key":24,"text":208,"correct":26},"90mm",{"key":28,"text":123,"correct":22},{"key":31,"text":127,"correct":22},{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},979314,"石墙砌筑中，墙外露面灰缝厚度不得大于多少？",[215,216,218,220],{"key":20,"text":176,"correct":22},{"key":24,"text":217,"correct":26},"40mm",{"key":28,"text":219,"correct":22},"60mm",{"key":31,"text":206,"correct":22},{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},979315,"砌砖通常采用“三一砲筑法”，其具体指的是：",[225,227,229,231],{"key":20,"text":226,"correct":22},"—皮砖，一层灰，一勾缝",{"key":24,"text":228,"correct":22},"—挂线，一皮砖，一勾缝",{"key":28,"text":230,"correct":26},"一块砖，一铲灰，一挤揉",{"key":31,"text":232,"correct":22},"—块砖，一铲灰，一刮缝",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},979316,"水泥砂浆的配合比是指下列中的哪一种？",[237,239,241,243],{"key":20,"text":238,"correct":22},"干松状态下的质量比",{"key":24,"text":240,"correct":26},"干松状态下的体积比",{"key":28,"text":242,"correct":22},"天然状态下的质量比",{"key":31,"text":244,"correct":22},"天然状态下的体积比",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},979317,"清水墙面表面平整度偏差的允许值是：",[249,251,252,253],{"key":20,"text":250,"correct":26},"5 mm",{"key":24,"text":163,"correct":22},{"key":28,"text":165,"correct":22},{"key":31,"text":254,"correct":22},"12mm",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},979318,"砌筑地面以下砌体时，应使用的砂浆是：",[259,261,263,265],{"key":20,"text":260,"correct":22},"混合砂浆",{"key":24,"text":262,"correct":22},"石灰砂浆",{"key":28,"text":264,"correct":26},"水泥砂浆",{"key":31,"text":266,"correct":22},"纯水泥浆",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},979319,"砖砲体的水平防潮层应设在何处？",[271,273,275,277],{"key":20,"text":272,"correct":26},"室内混凝土地面厚度范围内",{"key":24,"text":274,"correct":22},"室内地坪下三皮砖处",{"key":28,"text":276,"correct":22},"室内地坪上一皮砖处",{"key":31,"text":278,"correct":22},"室外地坪下一皮砖处",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},979320,"砌砖工程，设计要求的洞口宽度超过多少时，应设置过梁或砌筑平拱？",[283,284,286,288],{"key":20,"text":129,"correct":26},{"key":24,"text":285,"correct":22},"500mm",{"key":28,"text":287,"correct":22},"600mm",{"key":31,"text":289,"correct":22},"800mm",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":31,"analysis":33},979321,"在抗震烈度6度、7度设防地区，砖砌体留直槎时，必须设置拉结筋。下列中哪条叙述不正确？",[294,296,298,300],{"key":20,"text":295,"correct":22},"拉结筋的直径不小于6mm",{"key":24,"text":297,"correct":22},"每120mm墙厚设置一根拉结筋",{"key":28,"text":299,"correct":22},"应沿墙高不超过500mm设置一道拉结筋",{"key":31,"text":301,"correct":26},"拉结筋每边长不小于500mm，末端有90°弯钩",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},979322,"在检验砖砌体工程质量中，下列哪一条是符合标准要求的？",[306,308,310,312],{"key":20,"text":307,"correct":22},"窗间墙的通缝皮数不超过4皮",{"key":24,"text":309,"correct":22},"每层砖砌体垂直度偏差小于30mm",{"key":28,"text":311,"correct":26},"水平灰缝砂衆饱满度不小于80%",{"key":31,"text":313,"correct":22},"拉结筋的直径不小于10mm",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},979323,"砌砖工程采用铺装法砌筑和施工期间气温超过30°C时，铺浆长度分别不得超过多少？",[318,320,322,324],{"key":20,"text":319,"correct":22},"700mm,500mm",{"key":24,"text":321,"correct":26},"750mm, 500mm",{"key":28,"text":323,"correct":22},"500mm,300mm",{"key":31,"text":325,"correct":22},"600mm,400mm",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":33},979324,"施工时所用的小型砲块和产品的龄期不得小于多少天？",[330,332,334,336],{"key":20,"text":331,"correct":22},"7",{"key":24,"text":333,"correct":22},"14",{"key":28,"text":335,"correct":26},"28",{"key":31,"text":337,"correct":22},"30",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},979325,"用加气混凝土砌块砲筑墙体时，墙底部应使用普通砖砌筑，砌筑高度不小于：",[342,343,344,346],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":28,"text":345,"correct":22},"180mm",{"key":31,"text":127,"correct":26},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":28,"analysis":33},979326,"砖砌平拱过梁，拱脚应深入墙内不小于多少，拱底应有多大的起拱？",[351,353,355,357],{"key":20,"text":352,"correct":22},"10mm,0. 5%",{"key":24,"text":354,"correct":22},"15mm,0. 8%",{"key":28,"text":356,"correct":26},"20mm,1%",{"key":31,"text":358,"correct":22},"25mm,2%",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},979327,"砖砌体施工中，在砌体门窗洞口两侧和转角处多大范围内，不得设置脚手眼？",[363,365,367,369],{"key":20,"text":364,"correct":22},"100mm, 300mm",{"key":24,"text":366,"correct":22},"150mm, 350mm",{"key":28,"text":368,"correct":22},"200mm,400mm",{"key":31,"text":370,"correct":26},"200mm,450mm",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},979328,"砌筑砂浆应随拌随用，必须在拌成后多长时间内使用完毕？",[375,377,379,381],{"key":20,"text":376,"correct":26},"3h",{"key":24,"text":378,"correct":22},"4h",{"key":28,"text":380,"correct":22},"5h",{"key":31,"text":382,"correct":22},"6h",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},979329,"单位工程施工组织设计的核心内容是： A.确定施工进度计划 B选择施工方案 C.设计施工现场平面布置图 D.确定施工准备工作计划",[387,388,389,390],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},979330,"下列中哪一项不是评价单位工程施工进度计划质量的指标？",[395,397,399,401],{"key":20,"text":396,"correct":22},"工期",{"key":24,"text":398,"correct":22},"资源消耗的均衡性",{"key":28,"text":400,"correct":22},"主要施工机械的利用率",{"key":31,"text":402,"correct":26},"劳动消耗量",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},979331,"在单位工程施工平面图设计步骤中，首先应考虑下列中的哪一项？",[407,409,411,413],{"key":20,"text":408,"correct":22},"运输道路的布置",{"key":24,"text":410,"correct":22},"材料、构件仓库、堆场布置",{"key":28,"text":412,"correct":26},"起重机械的布置",{"key":31,"text":414,"correct":22},"水电管网的布置",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},979332,"单位工程施工方案选择的内容应为下列中哪一项？",[419,421,423,425],{"key":20,"text":420,"correct":26},"选择施工方法和施工机械，确定工程开展顺序",{"key":24,"text":422,"correct":22},"选择施工方法，确定施工进度计划",{"key":28,"text":424,"correct":22},"选择施工方法和施工机械，确定资源供应计划",{"key":31,"text":426,"correct":22},"选择施工方法，确定进度计划及现场平面布置",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},979333,"在安排各施工过程的施工顺序时，可以不考虑下列中的哪一项？",[431,433,435,437],{"key":20,"text":432,"correct":22},"施工工艺的要求",{"key":24,"text":434,"correct":22},"施工组织的要求",{"key":28,"text":436,"correct":22},"施工质量的要求",{"key":31,"text":438,"correct":26},"施工人员数量的要求.",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},979334,"某施工段的工程量为200单位，可安排的施工队人数为25人，每人每天完成0. 8 个单位，则该队在该段中的流水节拍应是：",[443,445,447,449],{"key":20,"text":444,"correct":22},"12d",{"key":24,"text":446,"correct":22},"8d",{"key":28,"text":448,"correct":26},"10d",{"key":31,"text":450,"correct":22},"6d",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},979335,"对有技术间歇的分层分段流水施工，最少施工段数与施工过程数相比，应：",[455,457,459,461],{"key":20,"text":456,"correct":22},"小于",{"key":24,"text":458,"correct":22},"等于",{"key":28,"text":460,"correct":26},"大于",{"key":31,"text":462,"correct":22},"小于、等于",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},979336,"在加快成倍节拍流水中，任何两个相邻专业施工队间的流水步距应是所有流水节拍的？",[467,469,471,473],{"key":20,"text":468,"correct":22},"最小值",{"key":24,"text":470,"correct":22},"最小公倍数",{"key":28,"text":472,"correct":22},"最大值工",{"key":31,"text":474,"correct":26},"最大公约数",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},979337,"流水施工中，流水节拍是指下列叙述中的哪一种？",[479,481,483,485],{"key":20,"text":480,"correct":22},"—个施工过程在各个施工段上的总持续时间",{"key":24,"text":482,"correct":26},"—个施工过程在一个施工段上的持续工作时间",{"key":28,"text":484,"correct":22},"两个相邻施工过程先后进入流水施工段的时间间隔",{"key":31,"text":486,"correct":22},"流水施工的工期",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},979338,"在施工段的划分中，下列中哪项要求是不正确？",[491,493,495,497],{"key":20,"text":492,"correct":22},"施工段的分界同施工对象的结构界限尽量一致",{"key":24,"text":494,"correct":22},"各施工段上所消耗的劳动量尽量相近",{"key":28,"text":496,"correct":22},"要有足够的工作面",{"key":31,"text":498,"correct":26},"分层又分段时，每层施工段数应少于施工过程数",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},979339,"下列哪项不属于确定流水步距的基本要求？",[503,505,507,509],{"key":20,"text":504,"correct":22},"始终保持两个施工过程的先后工艺顺序",{"key":24,"text":506,"correct":22},"保持各施工过程的连续作业",{"key":28,"text":508,"correct":26},"始终保持各工作面不空闲",{"key":31,"text":510,"correct":22},"使前后两施工过程施工时间有最大搭接",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},979340,"某二层楼进行固定节拍专业流水施工，每层施工段数为3，施工过程有3个，流水节拍为2d，流水工期为：",[515,517,518,519],{"key":20,"text":516,"correct":26},"16d",{"key":24,"text":448,"correct":22},{"key":28,"text":444,"correct":22},{"key":31,"text":446,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},979341,"某流水施工组织成加快成倍节拍流水，施工段数为6，甲、乙、丙三个施工过程的流水节拍分别为1d、2d和3d，其流水工期为：",[524,525,526,528],{"key":20,"text":446,"correct":22},{"key":24,"text":448,"correct":22},{"key":28,"text":527,"correct":26},"11d",{"key":31,"text":516,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},979342,"某工程按下表要求组织流水施工，相应流水步距KⅠ-Ⅱ及KⅡ-Ⅲ分别应为多少天？",[533,535,537,539],{"key":20,"text":534,"correct":22},"2,2",{"key":24,"text":536,"correct":22},"2,3",{"key":28,"text":538,"correct":22},"3,3",{"key":31,"text":540,"correct":26},"5,2",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":28,"analysis":33},979343,"双代号网络图的三要素是：",[545,547,549,551],{"key":20,"text":546,"correct":22},"时差、最早时间和最迟时间",{"key":24,"text":548,"correct":22},"总时差、局部时差和计算工期",{"key":28,"text":550,"correct":26},"工作、事件和线路",{"key":31,"text":552,"correct":22},"工作、事件和关键线路",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},979344,"双代号网络图中，某非关键工作的拖延时间不超过局部时差，则应有下列中哪种结果？",[557,559,561,563],{"key":20,"text":558,"correct":26},"后续工作最早可能开始时间不变",{"key":24,"text":560,"correct":22},"仅改变后续工作最早可能开始时间",{"key":28,"text":562,"correct":22},"后续工作最迟必须开始时间改变",{"key":31,"text":564,"correct":22},"紧后工作最早可能开始时间改变",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},979345,"某工程双代号网络图如图所示，工作①→③的局部时差应为：",[569,571,573,575],{"key":20,"text":570,"correct":22},"1d",{"key":24,"text":572,"correct":26},"2d",{"key":28,"text":574,"correct":22},"3d",{"key":31,"text":576,"correct":22},"4d",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},979346,"在单代号网络图中，用下列中哪项表示工作之间的逻辑关系？",[581,583,585,587],{"key":20,"text":582,"correct":22},"虚箭杆",{"key":24,"text":584,"correct":26},"实箭杆",{"key":28,"text":586,"correct":22},"节点",{"key":31,"text":588,"correct":22},"B与C",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},979347,"某项工作有两项紧后工作D和 E，D的最迟完成时间是20d，持续时间是13d；E的最迟完成时间是15d，持续时间是10d。则本工作的最迟完成时间是：",[593,595,597,599],{"key":20,"text":594,"correct":22},"20d",{"key":24,"text":596,"correct":22},"15d",{"key":28,"text":598,"correct":26},"5d",{"key":31,"text":600,"correct":22},"13d",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]