[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-979269":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},979269,707,1,"单选题","在混凝土施工过程中，当室外日平均气温连续5d稳定低于多少时，则认为冬期施工开始了？",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","-5°C",false,{"key":16,"text":17,"correct":14},"B","-4.0°",{"key":19,"text":20,"correct":14},"C","0°C",{"key":22,"text":23,"correct":24},"D","5°C",true,"提示:根据《混凝土结构工程施工质量验收规范》(GB 50204-2002)中第7. 1. 5条的规定，当地多年气温资料，室外日平均气温连续5d稳定低于5°C时，混凝土结构工程应采取冬期施工措施并应及时采取气温突然下降的防冻措施。因为日平均气温为5°C，则最低气温已低于0°C，必须采取相应的冬期施工措施。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业基础知识","建筑工程",0]