[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-979128":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},979128,707,1,"单选题","水准测量时，计算校核Σh=Σa+Σb和Σh=H终-H始可分别校核下列中哪两项是否具有误差？",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","水准点高程、水准尺读数",false,{"key":16,"text":17,"correct":14},"B","水准点位置、记录",{"key":19,"text":20,"correct":14},"C","高程计算、高差计算",{"key":22,"text":23,"correct":24},"D","高差计算、高程计算",true,"提示:参见高差计算和高程计算的原理。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业基础知识","建筑工程",0]