[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978966":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},978966,707,1,"单选题","水泥的初凝时间不宜过早是因为下列中的哪个原因？",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确保水泥施工有足够的施工时间",true,{"key":16,"text":17,"correct":18},"B","不致拖延施工工期",false,{"key":20,"text":21,"correct":18},"C","降低水泥水化放热速度",{"key":23,"text":24,"correct":18},"D","防止水泥制品开裂","提示:水泥的初凝时间不宜过早是为了确保水泥、混凝土施工有足够的施工时间。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业基础知识","建筑工程",0]