[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978723":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},978723,706,1,"单选题","某工厂要扩建三栋厂房.，于是委托某勘察单位进行勘察。三栋厂房预算额分别为1号: 200万元；2号：50万元；3号：100万元。由于某种原因，工程停建，发包人要求解除合同，但当时1号厂房勘察人还未进行勘察工作；2号厂房完成了勘察工作量的30%；3号厂房完成了勘察工作量的70%以上。已付定金为合同价的20%。 (3)3号厂房发包人应再支付勘察人工程费（ ）万元。",[11,15,19],{"key":12,"text":13,"correct":14},"A","80",true,{"key":16,"text":17,"correct":18},"B","70",false,{"key":20,"text":21,"correct":18},"C","50","在合同履行期间，发包人要求终止或解除合同，已开始工作，完成工作量在50%之上的，发包人应支付承包人全部工程费，前面巳付定金为合同价的20%,也就是20 万元，现在只需再支付100-20=80(万元）。",{"id":6,"name":24,"category":25,"favorite":26},"岩土专业案例","建筑工程",0]