[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978531":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},978531,706,1,"单选题","某天然地基土体不排水抗剪强度cu为23.35kPa,地基极限承载力等于5.14cu，为120kPa。采用碎石桩复合地基加固，碎石桩极限承载力可采用简化公式估计，ppf = 25.2cu0。碎石桩梅花形布桩，桩径为0.80m，桩中心距为1.40m。设置碎石桩后桩间土不排水抗剪强度为cu0=25.29kPa。破坏时，桩体强度发挥度为1.0，桩间土强度发挥度为0.8。 (1)碎石桩复合地基置换率为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","m=0.30",true,{"key":16,"text":17,"correct":18},"B","m =0. 32",false,{"key":20,"text":21,"correct":18},"C","m =0. 33",{"key":23,"text":24,"correct":18},"D","m =0. 59","梅花形布桩：de=1.05s=1.47m； 复合地基的置换率：m =d2\u002Fd2e=0.82\u002F1.472 =0.30。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业案例","建筑工程",0]