[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978459":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},978459,706,1,"单选题","某工程场地为饱和软土地基，并采用堆载预压法处理，以砂井做为竖向排水体，砂井直径dw=0.3m，砂井长h= 15m，井距s=3.0m，按等边三角形布置，该地基土水平向固结系数Ch=2.6×10-2m2\u002Fd，在瞬时加荷下，径向固结度达到85%所需的时间最接近（ ）d。（由题意给出的条件得到有效排水直径为de=3. 15m， n= 10.5， Fn = 1.6248)",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","125",false,{"key":16,"text":17,"correct":14},"B","136",{"key":19,"text":20,"correct":21},"C","147",true,{"key":23,"text":24,"correct":14},"D","158","根据《港口工程地基规范》（JTJ 250—1998）第7. 3. 13条计算，有Ur= 1-exp",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业案例","建筑工程",0]