[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978450":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},978450,706,1,"单选题","某黄土场地，地面以下8m为自重湿陷性黄土，其下为非湿陷性黄土层。建筑物采用筏板基础，底面积为18m×45m，基础埋深3. 00m，采用灰土挤密桩法消除自重湿陷性黄土的湿陷性，灰土桩直径Φ400mm，桩间距1.00，等边三角形布置。根据《建筑地基处理技术规范》（JGJ 79—2002）规定，处理该场地的灰土桩数量（根）为下列哪项？（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","936",false,{"key":16,"text":17,"correct":14},"B","1245",{"key":19,"text":20,"correct":14},"C","1328",{"key":22,"text":23,"correct":24},"D","1592",true,"根据《建筑地基处理技术规范》（JGJ 79—2002）第14.2. 1条，采用整片处理时，超出基础底面外缘的宽度，每边不宜小于处理土层厚度的1\u002F2，并不应小于2. 00m，故处理的面积为A= (18 +2×4)×(45 +2×4) = 1378m2。 根据第 14. 2. 5 条，dc=1.05s= 1.05m，桩孔的数量n=A\u002FAc(πd2e\u002F4） =1592（根）。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业案例","建筑工程",0]