[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978291":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},978291,706,1,"单选题","某黄土场地自重湿陷性黄土层厚度为10m,其下为非湿陷性黄土，拟建建筑物采用筏形基础，基础底面尺寸为20m×50m，基础埋深5.0m，采用土挤密桩消除全部湿陷性，土桩直径为400mm，间距为1.0m，正三角形布桩。则处理该场地需要的桩孔数量为( )个。（注：根据《建筑地基处理技术规范》（JGJ 79—2002）计算）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1155",false,{"key":16,"text":17,"correct":14},"B","1498",{"key":19,"text":20,"correct":14},"C","1876",{"key":22,"text":23,"correct":24},"D","2080",true,"根据《建筑地基处理技术规范》（JGJ 79—2002）第14.2.1条、第14.2.5条： 正三角形布桩时等效圆直径为：de=1.05s=1.05×1.0=1.05m； 1根土桩承担的处理地基面积为： h\u002F2=10\u002F2=5m,则拟处理地基面积为：A=(20+2×5)×(50 +2×5)=1800m2； 故桩孔的数量为：n=A\u002FAe=1800\u002F0.8655 =2080(个）。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业案例","建筑工程",0]