[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-978144":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},978144,706,1,"单选题","某风化破碎严重的岩质边坡高H= 12m，采用土钉加固，水平与竖直方向均为每间隔1m打一排土钉，共12排，如图6-23所示，按《铁路路基支挡结构设计规范》提出的潜在破裂面估算方法，请问下列土钉非锚固段长度L，何项计算有误？ ( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","第 2 排：L2= 1.4m",false,{"key":16,"text":17,"correct":18},"B","第 4 排：L4=3. 5m",true,{"key":20,"text":21,"correct":14},"C","第 6 排：L6=4. 2m",{"key":23,"text":24,"correct":14},"D","第 8 排：L8 =4. 2m","根据《铁路路基支挡结构设计规范》(TB 10025-2006)第9. 2. 4条，边坡岩体风化破碎严重，L取大值，则： ②第4 排：h4 =8m＞6m； L4=0.7（H-hi）=0.7×(12-8) =2. 8m； ③第6 排：h6=6m≤6m； L6=0. 357H=0. 35×12 =4. 2m； ④第8 排：h8 =4m≤6m；L8=0. 35H=0. 35×12 =4. 2m。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业案例","建筑工程",0]