[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-705-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},705,"岩土基础知识","建筑工程",0,27,50,2945,[13,34,46,58,70,82,94,106,118,126,138,150,162,174,185,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,436,448,460,472,484,495,505,517,526,538,550,562,571,583,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},976776,1,"单选题","某项目的净年值小于零，则：",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","该项目是可行的",false,{"key":24,"text":25,"correct":26},"B","该项目的内部收益率小于基准折现率",true,{"key":28,"text":29,"correct":22},"C","该项目的动态投资回收期小于寿命期",{"key":31,"text":32,"correct":22},"D","该项目的内部收益率大于基准折现率","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},976777,"在投资项目盈利能力分析中，若选取的基准年发生变动，则该项目的净现值(NPV)的内部收益率(IRR)的数值将是：",[38,40,42,44],{"key":20,"text":39,"correct":26},"NPV变IRR不变",{"key":24,"text":41,"correct":22},"NPV和IRR均变",{"key":28,"text":43,"correct":22},"NPV不变IRR变",{"key":31,"text":45,"correct":22},"NPV和IRR均不变",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},976778,"投资项目W的净现金流量如下表： 则项目W的静态投资回收期为：",[50,52,54,56],{"key":20,"text":51,"correct":22},"3. 65 年",{"key":24,"text":53,"correct":22},"3. 87 年",{"key":28,"text":55,"correct":26},"3 年",{"key":31,"text":57,"correct":22},"3. 55 年",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},976779,"某投资项目，当基准折现率取15%时，项目的净现值等于零，则该项目的内部收益率：",[62,64,66,68],{"key":20,"text":63,"correct":26},"等于15%",{"key":24,"text":65,"correct":22},"大于15%",{"key":28,"text":67,"correct":22},"等于0",{"key":31,"text":69,"correct":22},"小于15%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},976780,"采用净现值指标对某项目进行财务盈利能力分析，设定的折现率为i，该项目财务上可行的条件是：",[74,76,78,80],{"key":20,"text":75,"correct":22},"NPV≤企业可接受的水平",{"key":24,"text":77,"correct":22},"NPV",{"key":28,"text":79,"correct":26},"NPV≥0",{"key":31,"text":81,"correct":22},"NPV>i",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},976781,"某项目第一年年初投资100万元，当年年末开始收益，每年年末净收益25万元，项目计算期5年，设定的折现率为10%，该项目的净现值为：",[86,88,90,92],{"key":20,"text":87,"correct":22},"0",{"key":24,"text":89,"correct":26},"-5. 23",{"key":28,"text":91,"correct":22},"5. 23",{"key":31,"text":93,"correct":22},"25",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},976782,"对建设项目进行财务现金流量分析时，若采用的折现率提高，则该项目：",[98,100,102,104],{"key":20,"text":99,"correct":22},"净现金流量减少，财务净现值减小",{"key":24,"text":101,"correct":22},"净现金流量增加，财务净现值增加",{"key":28,"text":103,"correct":26},"净现金流量减少，财务净现值增加",{"key":31,"text":105,"correct":22},"净现金流量不变，财务净现值减小",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},976783,"某项目第1、2年年初分别投资800万元、400万元，第3年开始每年年末净收益300万元，项目运营期8年，残值30万元。设折现率为10%，已知(P\u002FF,10%,1)=0.9091、 (P\u002FF, 10%,2) = 0. 8264、(P\u002FF,10%,10)=0. 3855、(P\u002FA,10%,8) = 5. 3349。则该项目的财务净现值为：",[110,112,114,116],{"key":20,"text":111,"correct":22},"158. 99 万元",{"key":24,"text":113,"correct":26},"170. 55 万元",{"key":28,"text":115,"correct":22},"448. 40 万元",{"key":31,"text":117,"correct":22},"1230 万元",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},976784,"已知某项目投资方案一次投资12000元，预计每年净现金流量为4300元，项目寿命5年，(P\u002FA,18%,5) = 3. 127、(P\u002FA,20%,5) = 2. 991、(P\u002FA,25%,5) = 2. 689，则该方案的内部收益率为： A.25%",[122,123,124,125],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},976785,"某投资项目一次性投资200万元，当年投产并收益，评价该项目的财务盈利能力时，计算财务净现值选取的基准收益率为ic，若财务内部收益率小于ic，则有：",[130,132,134,136],{"key":20,"text":131,"correct":22},"ic低于贷款利率",{"key":24,"text":133,"correct":22},"内部收益率低于贷款利率",{"key":28,"text":135,"correct":22},"净现值大于零",{"key":31,"text":137,"correct":26},"净现值小于零",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":28,"analysis":33},976786,"设选取的基准收益率为ic，如果某投资方案在财务上可行，则有：",[142,144,146,148],{"key":20,"text":143,"correct":22},"财务净现值小于零，财务内部收益率大于ic",{"key":24,"text":145,"correct":22},"财务净现值小于零，财务内部收益率小于ic",{"key":28,"text":147,"correct":26},"财务净现值不小于零，财务内部收益率不小于ic",{"key":31,"text":149,"correct":22},"财务净现值不小于零，财务内部收益率小于ic",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},976787,"某小区建设一块绿地，需一次性投资20万元，每年维护费用5万元，设基准折现率10%，绿地使用10年，则费用年值为：",[154,156,158,160],{"key":20,"text":155,"correct":22},"4. 750万元",{"key":24,"text":157,"correct":22},"5万元",{"key":28,"text":159,"correct":22},"7. 250万元",{"key":31,"text":161,"correct":26},"8. 255万元",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},976788,"某项目的净现金流量如表所示，则该项目的静态投资回收期为：",[166,168,170,172],{"key":20,"text":167,"correct":22},"4.5年",{"key":24,"text":169,"correct":26},"5年",{"key":28,"text":171,"correct":22},"5.5年",{"key":31,"text":173,"correct":22},"6年",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},976789,"某项目一次性投资130万元，当年投资当年受益，项目寿命期8年，每年净收益40万元。该项目的静态投资回收期为：",[178,179,181,183],{"key":20,"text":55,"correct":22},{"key":24,"text":180,"correct":26},"3. 25 年",{"key":28,"text":182,"correct":22},"4 年",{"key":31,"text":184,"correct":22},"4. 75 年",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},976790,"某项目总投资为2000万元，投产后正常年份运营期每年利息支出为150万元，若使总投资收益率不低于20%，则年利润总额至少为：",[189,191,193,195],{"key":20,"text":190,"correct":26},"250万元",{"key":24,"text":192,"correct":22},"370万元",{"key":28,"text":194,"correct":22},"400万元",{"key":31,"text":196,"correct":22},"550万元",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},976791,"交通运输部门拟修建一条公路，预计建设期为一年，建设期初投资为100 万元，建设后即投入使用，预计使用寿命为10年，每年将产生的效益为20万元，每年需投入保养费8000元。若社会折现率为10%，则该项目的效益费用比为：",[201,203,205,207],{"key":20,"text":202,"correct":26},"1. 07",{"key":24,"text":204,"correct":22},"1. 17",{"key":28,"text":206,"correct":22},"1. 85",{"key":31,"text":208,"correct":22},"1. 92",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},976792,"经济效益计算的原则是：",[213,215,217,219],{"key":20,"text":214,"correct":22},"增量分析的原则.",{"key":24,"text":216,"correct":22},"考虑关联效果的原则",{"key":28,"text":218,"correct":22},"以全国居民作为分析对象的原则",{"key":31,"text":220,"correct":26},"支付意愿原则",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},976793,"某项目财务现金流量见下表，则该项目的静态投资回收期为多少年？",[225,227,229,231],{"key":20,"text":226,"correct":22},"5.4",{"key":24,"text":228,"correct":22},"5. 6",{"key":28,"text":230,"correct":26},"7.4",{"key":31,"text":232,"correct":22},"7. 6",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},976794,"下列关于经济效益和经济费用的表述中，正确的是：",[237,239,241,243],{"key":20,"text":238,"correct":22},"经济效益只考虑项目的直接效益",{"key":24,"text":240,"correct":26},"项目对提高社会福利和社会经济所作的贡献都记为经济效益",{"key":28,"text":242,"correct":22},"计算经济费用效益指标采用企业设定的折现率",{"key":31,"text":244,"correct":22},"影子价格是项目投入物和产出物的市场平均价格",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},976795,"对建设项目进行经济费用效益分析所使用的影子价格的正确含义是：",[249,251,253,255],{"key":20,"text":250,"correct":22},"政府为保证国计民生为项目核定的指导价格",{"key":24,"text":252,"correct":22},"使项目产出品具有竞争力的价格",{"key":28,"text":254,"correct":22},"项目投入物和产出物的市场最低价格",{"key":31,"text":256,"correct":26},"反映项目投入物和产出物真实经济价值的价格",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},976796,"对建设项目进行经济费用效益分析所使用的影子汇率的正确含义是：",[261,263,265,267],{"key":20,"text":262,"correct":26},"能正确反映国家外汇经济价值的汇率",{"key":24,"text":264,"correct":22},"—年中外汇牌价的平均汇率",{"key":28,"text":266,"correct":22},"能正确反映国际外汇市场价格的汇率",{"key":31,"text":268,"correct":22},"使项目投入物、产出物的国内市场和国际市场价格等值的汇率",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},976797,"计算经济效益净现值采用的折现率应是：",[273,275,277,279],{"key":20,"text":274,"correct":22},"企业设定的折现率",{"key":24,"text":276,"correct":22},"国债平均利率",{"key":28,"text":278,"correct":26},"社会折现率",{"key":31,"text":280,"correct":22},"银行贷款利率",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},976798,"从经济资源配置的角度判断建设项目可以被接受的条件是：",[285,287,289,291],{"key":20,"text":286,"correct":22},"财务净现值等于或大于零",{"key":24,"text":288,"correct":22},"经济内部收益率等于或小于社会折现率",{"key":28,"text":290,"correct":22},"财务内部收益率等于或大于基准收益率",{"key":31,"text":292,"correct":26},"经济净现值等于或大于零",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},976799,"进行经济费用效益分析时，评价指标效益费用比是指在项目计算期内：",[297,299,301,303],{"key":20,"text":298,"correct":22},"经济净现值与财务净现值之比",{"key":24,"text":300,"correct":22},"经济内部收益率与社会折现率之比",{"key":28,"text":302,"correct":26},"效益流量的现值与费用流量的现值之比",{"key":31,"text":304,"correct":22},"效益流量的累计值与费用流量的累计值之比",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},976800,"某地区为减少水灾损失，拟建水利工程。项目投资预计500万元，计算期按无限年考虑，年维护费20万元。项目建设前每年平均损失300万元。若利率5%，则该项目的费用效益比为：",[309,311,313,315],{"key":20,"text":310,"correct":22},"6.11",{"key":24,"text":312,"correct":26},"6. 67",{"key":28,"text":314,"correct":22},"7. 11",{"key":31,"text":316,"correct":22},"7. 22",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},976801,"建设项目经济评价有一整套指标体系，敏感性分析可选定其中一个或几个主要指标进行分析，最基本的分析指标是：",[321,323,325,327],{"key":20,"text":322,"correct":22},"财务净现值",{"key":24,"text":324,"correct":26},"内部收益率",{"key":28,"text":326,"correct":22},"投资回收期",{"key":31,"text":328,"correct":22},"偿债备付率",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},976802,"某建设项目年设计生产能力为8万台，年固定成本为1200万元，产品单台售价为1000元，单台产品可变成本为600元，单台产品销售税金及附加为150元，则该项目的盈亏平衡点的产销量为：",[333,335,337,339],{"key":20,"text":334,"correct":26},"48000 台",{"key":24,"text":336,"correct":22},"12000 台",{"key":28,"text":338,"correct":22},"30000 台",{"key":31,"text":340,"correct":22},"21819 台",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},976803,"在单因素敏感分析图中，下列哪一项影响因素说明该因素越敏感？",[345,347,349,351],{"key":20,"text":346,"correct":22},"直线的斜率为负",{"key":24,"text":348,"correct":22},"直线的斜率为正",{"key":28,"text":350,"correct":26},"直线的斜率绝对值越大",{"key":31,"text":352,"correct":22},"直线的绝对值越小",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},976804,"盈亏平衡分析是一种特殊形式的临界点分析，它适用于财务评价，其计算应按项目投产后以下哪项计算？",[357,359,361,363],{"key":20,"text":358,"correct":26},"正常年份的销售收入和成本费用数据利润总额",{"key":24,"text":360,"correct":22},"计算期内的平均值",{"key":28,"text":362,"correct":22},"年产量",{"key":31,"text":364,"correct":22},"单位产品销售价格",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},976805,"成本可分为固定成本和可变成本，假设生产规模一定，以下说法中正确的是",[369,371,373,375],{"key":20,"text":370,"correct":22},"产量增加，但固定成本在单位产品中的成本不变",{"key":24,"text":372,"correct":26},"单位产品中固定成本部分随产量增加而减少",{"key":28,"text":374,"correct":22},"固定成本低于可变成本时才能盈利",{"key":31,"text":376,"correct":22},"固定成本与可变成本相等时利润为零",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},976806,"某吊车生产企业，以产量表示的盈亏平衡点为600台。预计今年的固定成本将增加20%，若其他条件不变，则盈亏平衡点将变为：",[381,383,385,387],{"key":20,"text":382,"correct":26},"720 台",{"key":24,"text":384,"correct":22},"600 台",{"key":28,"text":386,"correct":22},"500 台",{"key":31,"text":388,"correct":22},"480 台",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},976807,"某项目设计生产能力为年产5000台，每台销售价格500元，单位产品可变成本350元，每台产品税金50元，年固定成本265000元，则该项目的盈亏平衡产量为：",[393,395,397,399],{"key":20,"text":394,"correct":26},"2650 台",{"key":24,"text":396,"correct":22},"3500 台",{"key":28,"text":398,"correct":22},"4500 台",{"key":31,"text":400,"correct":22},"5000 台",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},976808,"某企业拟投资生产一种产品，设计生产能力为15万件\u002F年，单位产品可变成本120元，总固定成本1500万元，达到设计生产能力时，保证企业不亏损的单位产品售价最低为：",[405,407,409,411],{"key":20,"text":406,"correct":22},"150 元",{"key":24,"text":408,"correct":22},"200 元",{"key":28,"text":410,"correct":26},"220 元",{"key":31,"text":412,"correct":22},"250 元",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},976809,"某项目设计生产能力100万t，年固定成本2500万元，单位产品可变成本360元\u002Ft， 单位产品售价(不含税)400元\u002Ft。若要保证项目生产期间不亏损，该项目的生产能力利用率至少达到：",[417,419,421,423],{"key":20,"text":418,"correct":22},"60%",{"key":24,"text":420,"correct":26},"62.5%",{"key":28,"text":422,"correct":22},"75%",{"key":31,"text":424,"correct":22},"80. 5%",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},976810,"对项目进行单因素敏感性分析时，以下各项中，可作为敏感性分析因素的是：",[429,431,433,434],{"key":20,"text":430,"correct":22},"净现值",{"key":24,"text":432,"correct":22},"年值",{"key":28,"text":324,"correct":22},{"key":31,"text":435,"correct":26},"折现率",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},976811,"为了判断某种因素对财务或经济评价指标的影响，敏感性分析采取的分析方法是：",[440,442,444,446],{"key":20,"text":441,"correct":22},"对不同评价指标进行比较",{"key":24,"text":443,"correct":26},"考察不确定性因素的变化导致评价指标的变化幅度",{"key":28,"text":445,"correct":22},"考察盈亏平衡点的变化对评价指标的影响",{"key":31,"text":447,"correct":22},"计算不确定因素变动的概率分布并分析对方案的影响",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},976812,"对某项目进行敏感性分析，采用的评价指标为内部收益，基本方案的内部收益率为15%，当不确定性因素原材料价格增加10%时，内部收益率为13%，则原材料的敏感度系数为：",[452,454,456,458],{"key":20,"text":453,"correct":22},"-1. 54",{"key":24,"text":455,"correct":26},"-1. 33",{"key":28,"text":457,"correct":22},"1. 33",{"key":31,"text":459,"correct":22},"1. 54",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},976813,"对某项目投资方案进行单因素敏感性分析，基准收益率15%，采用内部收益率作为评价指标，投资额、经营成本、销售收入为不确定性因素，计算其变化对IRR的影响如表所示。则敏感性因素按对评价指标影响的程度从大到小排列依次为：",[464,466,468,470],{"key":20,"text":465,"correct":22},"投资额、经营成本、销售收入",{"key":24,"text":467,"correct":26},"销售收入、经营成本、投资额",{"key":28,"text":469,"correct":22},"经营成本、投资额、销售收入",{"key":31,"text":471,"correct":22},"销售收入、投资额、经营成本",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},976814,"对某投资方案进行单因素敏感性分析，选取的分析指标为净现值NPV，考虑投资额、产品价格、经营成本为不确定性因素，计算结果如图所示，则敏感性大小依次为：",[476,478,480,482],{"key":20,"text":477,"correct":22},"经营成本、投资额、产品价格",{"key":24,"text":479,"correct":22},"投资额、经营成本、产品价格",{"key":28,"text":481,"correct":22},"产品价格、投资额、经营成本",{"key":31,"text":483,"correct":26},"产品价格、经营成本、投资额",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},976815,"对某投资方案进行单因素敏感性分析，选取的分析指标为净现值NPV，考虑投资额、产品价格、经营成本为不确定性因素，计算结果如图所示，不确定性因素产品价格变化的临界点约为：",[488,490,491,493],{"key":20,"text":489,"correct":26},"-10%",{"key":24,"text":87,"correct":22},{"key":28,"text":492,"correct":22},"10%",{"key":31,"text":494,"correct":22},"20%",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},976816,"对某投资项目进行敏感性分析，采用的评价指标为内部收益率，基准收益率为15%，基本方案的内部收益率为18%，对于不确定性因素销售收入，当销售收入降低10%，内部收益率为15%时，销售收入变化的临界点为：",[499,500,502,503],{"key":20,"text":489,"correct":26},{"key":24,"text":501,"correct":22},"3%",{"key":28,"text":492,"correct":22},{"key":31,"text":504,"correct":22},"15%",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},976817,"在项目无资金约束、寿命不同、产出不同的条件下，方案经济比选只能采用:",[509,511,513,515],{"key":20,"text":510,"correct":22},"净现值比较法",{"key":24,"text":512,"correct":22},"差额投资内部收益率法",{"key":28,"text":514,"correct":26},"净年值法",{"key":31,"text":516,"correct":22},"费用年值法",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},976818,"在进行互斥方案选优时，若备选方案的收益率基本相同，且难于估计时，比选计算应考虑采用：",[521,522,523,524],{"key":20,"text":324,"correct":22},{"key":24,"text":430,"correct":22},{"key":28,"text":326,"correct":22},{"key":31,"text":525,"correct":26},"费用现值",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},976819,"采用净现值(NPV)、内部收益率(IRR)和差额内部收益率(ΔIRR)进行互斥方案比选，它们的评价结论是：",[530,532,534,536],{"key":20,"text":531,"correct":22},"NPV和ΔIRR总是不一致的",{"key":24,"text":533,"correct":22},"IRR和ΔIRR总是一致的",{"key":28,"text":535,"correct":26},"NPV和ΔIRR总是一致的",{"key":31,"text":537,"correct":22},"NPV、IRR和ΔIRR总是不一致的",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},976820,"两个初始投资相同、寿命期相同的投资方案，下列说法中正确的是：",[542,544,546,548],{"key":20,"text":543,"correct":22},"NPV1=NPV2，则IRR1= IRR2",{"key":24,"text":545,"correct":22},"NPV1>NPV2，则IRR1>IRR2",{"key":28,"text":547,"correct":22},"NPV1>NPV2，则IRR12",{"key":31,"text":549,"correct":26},"NPV1>NPV2≥0，则方案 1 较优",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},976821,"某项目有甲乙丙丁4个投资方案，寿命期都是8年，设定的折现率8%，(A\u002FP, 8%,8)=0. 1740，各方案各年的净现金流量如表所示，采用年值法应选用：",[554,556,558,560],{"key":20,"text":555,"correct":22},"甲方案",{"key":24,"text":557,"correct":22},"乙方案",{"key":28,"text":559,"correct":22},"丙方案",{"key":31,"text":561,"correct":26},"丁方案",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},976822,"若两个互斥方案的计算期相同，每年的收益基本相同但无法准确估计，应采用的财务评价指标是：",[566,567,568,569],{"key":20,"text":324,"correct":22},{"key":24,"text":430,"correct":22},{"key":28,"text":326,"correct":22},{"key":31,"text":570,"correct":26},"费用年值",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":28,"analysis":33},976823,"某项目有三个产出相同的方案，方案寿命期均为10年，期初投资和各年运营费用如表所示，设基准折现率为7%，已知(P\u002F A，7%，10) = 7.204。则方案优劣的排序为：",[575,577,579,581],{"key":20,"text":576,"correct":22},"甲乙丙",{"key":24,"text":578,"correct":22},"甲丙乙",{"key":28,"text":580,"correct":26},"乙甲丙",{"key":31,"text":582,"correct":22},"丙乙甲",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},976824,"有甲乙丙丁四个互斥方案，投资额分别为1000万元、800万元、700万元、600万 元，方案计算期均为10年，基准收益率为15%，计算差额内部收益率结果ΔIRR甲-乙、 ΔIRR乙-丙、ΔIRR丙-丁分别为14. 2%、16%、15.1%，应选择：",[587,588,589,590],{"key":20,"text":555,"correct":22},{"key":24,"text":557,"correct":26},{"key":28,"text":559,"correct":22},{"key":31,"text":561,"correct":22},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":28,"analysis":33},976825,"有甲乙丙3个相互独立的投资方案，寿命期均为10年，无残值，基准收益率12% ，(F\u002FA, 12%, 10) = 5. 650，可利用的资金100万元，项目数据如表所示，则最优方案组合为：",[595,596,598,600],{"key":20,"text":576,"correct":22},{"key":24,"text":597,"correct":22},"甲乙",{"key":28,"text":599,"correct":26},"甲丙",{"key":31,"text":601,"correct":22},"乙丙",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]