[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-976782":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},976782,705,1,"单选题","对建设项目进行财务现金流量分析时，若采用的折现率提高，则该项目：",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","净现金流量减少，财务净现值减小",false,{"key":16,"text":17,"correct":14},"B","净现金流量增加，财务净现值增加",{"key":19,"text":20,"correct":21},"C","净现金流量减少，财务净现值增加",true,{"key":23,"text":24,"correct":14},"D","净现金流量不变，财务净现值减小","提示:净现金流量与采用的折现率无关，根据净现金流量函数曲线可以判断折现率与净现值的变化规律。",{"id":6,"name":27,"category":28,"favorite":29},"岩土基础知识","建筑工程",0]