[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-976312":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},976312,705,1,"单选题","建设项目的防治污染设施没有建成或者没有达到国家规定的要求就投入生产或者使用的，应如何处理？",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应责令停止生产或者使用，可以并处罚款",true,{"key":16,"text":17,"correct":18},"B","交够罚款后才能使用",false,{"key":20,"text":21,"correct":18},"C","经有关部门批准交付一定的排污费才可使用",{"key":23,"text":24,"correct":18},"D","上级批准后才能使用","提示:《中华人民共和国环境保护法》第三十六条规定，建设项目的防治污染设施没有建成或者没有达到国家规定的要求，投入生产或者使用的，由批准该建设项目的环境影响报告书的环境保护行政主管部门责令停止生产或者使用，可以并处罚款。",{"id":6,"name":27,"category":28,"favorite":29},"岩土基础知识","建筑工程",0]