[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-976278":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},976278,705,1,"单选题","工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的应当：",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","报告建设单位要求设计单位改正",true,{"key":16,"text":17,"correct":18},"B","书面要求设计单位改正",false,{"key":20,"text":21,"correct":18},"C","报告上级主管部门",{"key":23,"text":24,"correct":18},"D","要求施工单位改正","提示:见《中华人民共和国建筑法》第三十二条。",{"id":6,"name":27,"category":28,"favorite":29},"岩土基础知识","建筑工程",0]