[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-973022":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},973022,704,1,"单选题","干式系统准工作状态时系统侧管道内充装的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","空气",false,{"key":16,"text":17,"correct":18},"B","有压气体",true,{"key":20,"text":21,"correct":14},"C","有压水",{"key":23,"text":24,"correct":14},"D","无压气体","如表格内容：",{"id":6,"name":27,"category":28,"favorite":29},"中级技能","建筑工程",0]