[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-966896":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},966896,701,3,"判断题","灭火剂输送管道安装完毕后，应进行气压严密性试验，不用做气压强度实验。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"灭火剂输送管道安装完毕后，应进行强度试验和气压严密性试验，并合格",{"id":6,"name":21,"category":22,"favorite":23},"高级技能","建筑工程",0]