[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-965796":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},965796,701,2,"多选题","气动驱动装置的管道安装应符合管道布置设计要求：（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","竖直管道应在其始端和终端设防晃支架或采用管卡固定",true,{"key":16,"text":17,"correct":14},"B","水平管道应采用管卡固定",{"key":19,"text":20,"correct":14},"C","管卡的间距不宜大于0.5m",{"key":22,"text":23,"correct":24},"D","转弯处应增设1个管卡",false,"ABC","气动驱动装置的管道安装应符合管道布置设计要求：竖直管道应在其始端和终端设防晃支架或采用管卡固定；水平管道应采用管卡固定。管卡的间距不宜大于0.6m。转弯处应增设1个管卡。",{"id":6,"name":28,"category":29,"favorite":30},"高级技能","建筑工程",0]