[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-965770":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},965770,701,2,"多选题","灭火剂输送管道安装完毕后，应进行哪些试验，并合格？（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","水压强度试验",true,{"key":16,"text":17,"correct":14},"B","气压强度试验",{"key":19,"text":20,"correct":21},"C","空压强度试验",false,{"key":23,"text":24,"correct":14},"D","气压严密性试验","ABD","灭火剂输送管道安装完毕后，应进行强度试验和气压严密性试验，并合格。",{"id":6,"name":28,"category":29,"favorite":30},"高级技能","建筑工程",0]