[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-965465":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},965465,701,2,"多选题","末端试水装置的作用是（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","测试相关系统最不利点处喷头的工作压力",true,{"key":16,"text":17,"correct":14},"B","测试相关系统配水管道是否畅通",{"key":19,"text":20,"correct":14},"C","测试相关系统的工况是否正常",{"key":22,"text":23,"correct":24},"D","直接启动相关系统的消防水泵",false,{"key":26,"text":27,"correct":14},"E","测试相关系统的管道充水时间","ABCE","末端试水装置的作用是测试相关系统最不利点处喷头的工作压力、测试相关系统配水管道是否畅通、测试相关系统的工况是否正常、测试相关系统的管道充水时间",{"id":6,"name":31,"category":32,"favorite":33},"高级技能","建筑工程",0]