[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-965199":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},965199,701,1,"单选题","关于灭火剂输送管道强度试验和气密性试验的说法不符合要求的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","灭火剂输送管道经水压强度试验合格后还应进行气密性试验",false,{"key":16,"text":17,"correct":18},"B","灭火剂输送管道经气压强度试照合格且在试验后未拆卸过的管道还应进行气密性试脸",true,{"key":20,"text":21,"correct":14},"C","气压强度试验和气密性试验必须采取有效的安全措施",{"key":23,"text":24,"correct":14},"D","加压介质可采用空气或氮气","灭火剂输送管道经水压强度试验合格后还应进行气密牲试脸，经气压强度试照合格且在试验后未拆卸过的管道可不进行气密性试验气压强度试验和气密性试验必须采取有效的安全措施，加压介质可采用空气或氮气。",{"id":6,"name":27,"category":28,"favorite":29},"高级技能","建筑工程",0]