[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-964856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},964856,701,1,"单选题","应急发电机组的容量应满足整个建筑物内（ ）消防设备同时运行时的容量要求。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1\u002F5",false,{"key":16,"text":17,"correct":14},"B","1\u002F3",{"key":19,"text":20,"correct":14},"C","1\u002F2",{"key":22,"text":23,"correct":24},"D","所有",true,"《建筑设计防火规范》规定，消防用电设备应釆用专用的供电回路，当建筑内的生产、生活用电被切断时，应仍能保证消防用电。备用消防电源的供电时间和容量，应满足该建筑火灾延续时间内各消防用电设备的要求。",{"id":6,"name":27,"category":28,"favorite":29},"高级技能","建筑工程",0]