[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-964600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},964600,701,1,"单选题","水流指示器的安装应在（ ）后进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","埋地管道安装完毕",false,{"key":16,"text":17,"correct":14},"B","系统调试",{"key":19,"text":20,"correct":21},"C","管道试压、冲洗合格",true,{"key":23,"text":24,"correct":14},"D","水压强度试验、气压严密性试验完成","水流指示器的安装应在管道试压、冲洗合格后进行。",{"id":6,"name":27,"category":28,"favorite":29},"高级技能","建筑工程",0]