[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,9,50,1656,[13,35,49,61,73,85,97,106,118,130,143,156,169,181,194,206,218,230,242,254,266,277,290,302,314,327,339,351,363,375,387,399,409,422,434,447,459,471,483,495,503,511,523,535,547,559,570,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},958469,2,"多选题","防洪工程系统有哪些方面组成( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","水电利用",false,{"key":24,"text":25,"correct":26},"B","河道整治",true,{"key":28,"text":29,"correct":26},"C","蓄滞洪区",{"key":31,"text":32,"correct":26},"D","防洪水库","BCD","",{"id":36,"libraryId":5,"type":37,"typeLabel":38,"stem":39,"options":40,"answer":20,"analysis":34},958470,1,"单选题","对于调节性较差的电站，平均水头应取( )。",[41,43,45,47],{"key":20,"text":42,"correct":26},"洪水期的加权平均水头",{"key":24,"text":44,"correct":22},"全年的加权平均水头",{"key":28,"text":46,"correct":22},"一年中的最大水头",{"key":31,"text":48,"correct":22},"一年中的最小水头",{"id":50,"libraryId":5,"type":37,"typeLabel":38,"stem":51,"options":52,"answer":31,"analysis":34},958471,"在我国大多数河流中，当库容系数β为( )时，多为多年调节电站。",[53,55,57,59],{"key":20,"text":54,"correct":22},"小于10%",{"key":24,"text":56,"correct":22},"10%～20%",{"key":28,"text":58,"correct":22},"20%～25%",{"key":31,"text":60,"correct":26},"25%以上",{"id":62,"libraryId":5,"type":37,"typeLabel":38,"stem":63,"options":64,"answer":31,"analysis":34},958472,"调水工程的核心问题是( )。",[65,67,69,71],{"key":20,"text":66,"correct":22},"确定水源",{"key":24,"text":68,"correct":22},"输水距离",{"key":28,"text":70,"correct":22},"确定受水区",{"key":31,"text":72,"correct":26},"确定调水量",{"id":74,"libraryId":5,"type":37,"typeLabel":38,"stem":75,"options":76,"answer":28,"analysis":34},958473,"调峰容量平衡是指( )平衡。",[77,79,81,83],{"key":20,"text":78,"correct":22},"年",{"key":24,"text":80,"correct":22},"月",{"key":28,"text":82,"correct":26},"日",{"key":31,"text":84,"correct":22},"任何时期",{"id":86,"libraryId":5,"type":37,"typeLabel":38,"stem":87,"options":88,"answer":24,"analysis":34},958474,"尖峰负荷常指( )。",[89,91,93,95],{"key":20,"text":90,"correct":22},"日最小负荷以上部分",{"key":24,"text":92,"correct":26},"日平均负荷以上部分",{"key":28,"text":94,"correct":22},"日最小负荷以下部分",{"key":31,"text":96,"correct":22},"日平均负荷以下部分",{"id":98,"libraryId":5,"type":37,"typeLabel":38,"stem":99,"options":100,"answer":28,"analysis":34},958475,"常将( )称为基荷。",[101,103,104,105],{"key":20,"text":102,"correct":22},"日最大负荷以下部分",{"key":24,"text":96,"correct":22},{"key":28,"text":94,"correct":26},{"key":31,"text":92,"correct":22},{"id":107,"libraryId":5,"type":37,"typeLabel":38,"stem":108,"options":109,"answer":20,"analysis":34},958476,"堤防、水库及分蓄洪区配合运用一般先以( )的水位或者流量作为运用水库的判别指标。",[110,112,114,116],{"key":20,"text":111,"correct":26},"防洪控制站",{"key":24,"text":113,"correct":22},"防洪高水位",{"key":28,"text":115,"correct":22},"防洪平均水位",{"key":31,"text":117,"correct":22},"防洪设计水位",{"id":119,"libraryId":5,"type":37,"typeLabel":38,"stem":120,"options":121,"answer":28,"analysis":34},958477,"下列关于防洪系统的运用，说法正确的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"当实际发生的洪水小于防洪标准的洪水时，通过防洪系统的正确运用，能保证防洪保护对象的防洪安全",{"key":24,"text":125,"correct":22},"当实际发生的洪水大于防洪标准的洪水时，通过防洪系统的正确运用，能保证防洪保护对象的防洪安全",{"key":28,"text":127,"correct":26},"当实际发生的洪水不大于防洪标准的洪水时，通过防洪系统的正确运用，能保证防洪保护对象的防洪安全",{"key":31,"text":129,"correct":22},"当实际发生的洪水不小于防洪标准的洪水时，通过防洪系统的正确运用，能保证防洪保护对象的防洪安全",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":142,"analysis":34},958478,"当库水位未超过防洪高水位时，水库防洪调度方式一般为( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"不固定泄量调度方式",{"key":24,"text":137,"correct":26},"固定泄量调度方式",{"key":28,"text":139,"correct":22},"经验调度方式",{"key":31,"text":141,"correct":26},"补偿调度方式","BD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":155,"analysis":34},958479,"当泵站前池通过排水河道与蓄涝容积相连时，根据下列哪些情况确定设计内水位？( )",[147,149,151,153],{"key":20,"text":148,"correct":26},"以蓄涝容积设计低水位为河道设计水位，并计及坡降损失求得设计内水位",{"key":24,"text":150,"correct":22},"以蓄涝容积的设计平均蓄水位作为河道的设计正常蓄水位，并计及坡降损失求得设计内水位",{"key":28,"text":152,"correct":26},"以蓄涝容积的正常蓄水位作为河道的设计低水位，并计及坡降损失求得设计内水位",{"key":31,"text":154,"correct":26},"以蓄涝容积的设计低水位与正常蓄水位的平均值作为河道的设计水位","ACD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":168,"analysis":34},958480,"农业节水的主要措施有( )。",[160,162,164,166],{"key":20,"text":161,"correct":26},"修建节水工程，如渠道防渗、低压管道输水等",{"key":24,"text":163,"correct":26},"采用节水型地面灌溉方法，推广喷灌与微灌技术",{"key":28,"text":165,"correct":26},"采用节水灌溉模式",{"key":31,"text":167,"correct":26},"建立节水管理体制和制度，合理征收水费，科学预报作物灌溉水量，指导农户合理安排灌水时间和灌水量","ABCD",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":155,"analysis":34},958481,"按水流来源，抽水蓄能电站可分为( )。",[173,175,177,179],{"key":20,"text":174,"correct":26},"纯抽水蓄能电站",{"key":24,"text":176,"correct":22},"储水式抽水蓄能水电站",{"key":28,"text":178,"correct":26},"混合式抽水蓄能电站",{"key":31,"text":180,"correct":26},"调水式抽水蓄能电站",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":193,"analysis":34},958482,"城镇公共用水包括( )。",[185,187,189,191],{"key":20,"text":186,"correct":26},"货运邮电业用水",{"key":24,"text":188,"correct":26},"商饮业用水",{"key":28,"text":190,"correct":22},"绿化与河湖补水",{"key":31,"text":192,"correct":26},"建筑业用水","ABD",{"id":195,"libraryId":5,"type":37,"typeLabel":38,"stem":196,"options":197,"answer":24,"analysis":34},958483,"当涝区的降雨、流量资料比较全，计算精度要求较高时，应选用哪种方法计算排水沟道的设计排涝流量？( )",[198,200,202,204],{"key":20,"text":199,"correct":22},"经验公式法",{"key":24,"text":201,"correct":26},"产、汇流方法",{"key":28,"text":203,"correct":22},"排涝模数公式法",{"key":31,"text":205,"correct":22},"平均排除法",{"id":207,"libraryId":5,"type":37,"typeLabel":38,"stem":208,"options":209,"answer":31,"analysis":34},958484,"在初步确定无调节和日调节水电站装机规模时，其经济利用小时数常取( )h。",[210,212,214,216],{"key":20,"text":211,"correct":22},"2000～3000",{"key":24,"text":213,"correct":22},"3000～4000",{"key":28,"text":215,"correct":22},"4000～5000",{"key":31,"text":217,"correct":26},"5000～6000",{"id":219,"libraryId":5,"type":37,"typeLabel":38,"stem":220,"options":221,"answer":28,"analysis":34},958485,"按《水电工程动能设计规范》(DL\u002FT5015-1996)规定，若应留有的备用库容小于水库兴利库容的( )，可不专设事故备用库容。",[222,224,226,228],{"key":20,"text":223,"correct":22},"1%",{"key":24,"text":225,"correct":22},"3%",{"key":28,"text":227,"correct":26},"5%",{"key":31,"text":229,"correct":22},"10%",{"id":231,"libraryId":5,"type":37,"typeLabel":38,"stem":232,"options":233,"answer":24,"analysis":34},958486,"按《水电工程动能设计规范》(DL\u002FT5015—1996)规定，承担事故备用作用的水电站，应在水库内预留所承担事故备用容量，在基荷连续运行( )天的备用库容(水量)。",[234,236,238,240],{"key":20,"text":235,"correct":22},"3～5",{"key":24,"text":237,"correct":26},"3～10",{"key":28,"text":239,"correct":22},"3～15",{"key":31,"text":241,"correct":22},"3～20",{"id":243,"libraryId":5,"type":37,"typeLabel":38,"stem":244,"options":245,"answer":24,"analysis":34},958487,"承泄区与排水系统的连接，可分为畅排和顶托两种情况。在外水位长期高于内水位，蓄涝容积又不能满足调蓄要求的涝区，需修建( )。",[246,248,250,252],{"key":20,"text":247,"correct":22},"闸门",{"key":24,"text":249,"correct":26},"排水站",{"key":28,"text":251,"correct":22},"回水堤",{"key":31,"text":253,"correct":22},"截流沟",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":193,"analysis":34},958488,"下列关于扬程设计说法正确的是( )。",[258,260,262,264],{"key":20,"text":259,"correct":26},"设计扬程应按泵站进、出水池设计水位差，并计入水力损失(进、出水流道或管道沿程和局部水力损失)确定",{"key":24,"text":261,"correct":26},"最高扬程应按泵站出水池最高运行水位与进水池最低运行水位之差，并计入水力损失确定",{"key":28,"text":263,"correct":22},"最低扬程应按泵站出水池最低运行水位与进水池最低运行水位之差，并计入水力损失确定",{"key":31,"text":265,"correct":26},"平均扬程可按泵站进、出水池平均水位差，并计入水力损失确定",{"id":267,"libraryId":5,"type":37,"typeLabel":38,"stem":268,"options":269,"answer":28,"analysis":34},958489,"节水灌溉工程实施后，水分生产率应提高( )以上。",[270,271,273,275],{"key":20,"text":229,"correct":22},{"key":24,"text":272,"correct":22},"15%",{"key":28,"text":274,"correct":26},"20%",{"key":31,"text":276,"correct":22},"25%",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":289,"analysis":34},958490,"下列关于电力系统调峰容量盈亏的判别条件说法正确的是( )。",[281,283,285,287],{"key":20,"text":282,"correct":26},"当各电站总的调峰能力不小于当日日负荷曲线最大负荷-最小负荷+旋转备用容量时，调峰能力达到平衡(或有盈余)",{"key":24,"text":284,"correct":26},"当各电站总的调峰能力小于当日日负荷曲线最大负荷-最小负荷+旋转备用容量时，调峰能力不足",{"key":28,"text":286,"correct":22},"开机容量的允许最小出力不大于当日日负荷曲线最小负荷时，调峰能力不足",{"key":31,"text":288,"correct":22},"开机容量的允许最小出力大于当日日负荷曲线最小负荷时，调峰能力达到了平衡(或有盈余)","AB",{"id":291,"libraryId":5,"type":37,"typeLabel":38,"stem":292,"options":293,"answer":24,"analysis":34},958491,"周调节所需库容为日调节库容的( )倍。",[294,296,298,300],{"key":20,"text":295,"correct":22},"1.15～1.5",{"key":24,"text":297,"correct":26},"1.15～2.0",{"key":28,"text":299,"correct":22},"1.15～2.5",{"key":31,"text":301,"correct":22},"1.15～3.0",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":168,"analysis":34},958492,"多年调节水库可以调节径流的( )。",[306,308,310,312],{"key":20,"text":307,"correct":26},"日内变化",{"key":24,"text":309,"correct":26},"周内变化",{"key":28,"text":311,"correct":26},"年内变化",{"key":31,"text":313,"correct":26},"年际变化",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":326,"analysis":34},958493,"选择承泄区是应考虑的条件有哪些？( )",[318,320,322,324],{"key":20,"text":319,"correct":26},"承泄区与排水系统布置应尽可能协调",{"key":24,"text":321,"correct":26},"承泄区位置应尽可能与涝区中心接近",{"key":28,"text":323,"correct":26},"承泄区尽可能选择在水位较低的地方",{"key":31,"text":325,"correct":22},"有排泄或容纳大部分涝水的能力","ABC",{"id":328,"libraryId":5,"type":37,"typeLabel":38,"stem":329,"options":330,"answer":31,"analysis":34},958494,"无调节水电站对电力系统的贡献主要是( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"发挥调峰作用",{"key":24,"text":334,"correct":22},"发挥调频作用",{"key":28,"text":336,"correct":22},"事故备用作用",{"key":31,"text":338,"correct":26},"电量效益",{"id":340,"libraryId":5,"type":37,"typeLabel":38,"stem":341,"options":342,"answer":24,"analysis":34},958495,"在初步确定年调节和多年调节水电站装机规模时，其经济利用小时数常取( )h。",[343,345,347,349],{"key":20,"text":344,"correct":22},"1500～2500",{"key":24,"text":346,"correct":26},"2500～3500",{"key":28,"text":348,"correct":22},"3500～4500",{"key":31,"text":350,"correct":22},"4500～5500",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":326,"analysis":34},958496,"防御洪水标准的高低与哪些因素有关？( )",[355,357,359,361],{"key":20,"text":356,"correct":26},"防洪保护对象的重要性",{"key":24,"text":358,"correct":26},"洪水灾害的严重性",{"key":28,"text":360,"correct":26},"影响国民经济发展",{"key":31,"text":362,"correct":22},"防洪区域的人口数量",{"id":364,"libraryId":5,"type":37,"typeLabel":38,"stem":365,"options":366,"answer":31,"analysis":34},958497,"( )以下的水库容积为总库容。",[367,369,371,373],{"key":20,"text":368,"correct":22},"死水位",{"key":24,"text":370,"correct":22},"正常蓄水位",{"key":28,"text":372,"correct":22},"设计洪水位",{"key":31,"text":374,"correct":26},"校核洪水位",{"id":376,"libraryId":5,"type":37,"typeLabel":38,"stem":377,"options":378,"answer":24,"analysis":34},958498,"城乡生活采用( )，供水保证率为( )。",[379,381,383,385],{"key":20,"text":380,"correct":22},"年保证率，90％～95％",{"key":24,"text":382,"correct":26},"历时保证率，95％～97％",{"key":28,"text":384,"correct":22},"年保证率，95％～97％",{"key":31,"text":386,"correct":22},"历时保证率，90％～95％",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":155,"analysis":34},958499,"回水计算所用库区横断面，应尽可能为实测大断面，断面的选取应考虑的要求有( )。",[391,393,395,397],{"key":20,"text":392,"correct":26},"沿河城镇、工矿企业、大支流入口及水文站等处，应选为计算断面",{"key":24,"text":394,"correct":22},"每一计算河段内水面线应尽具有不同的坡降",{"key":28,"text":396,"correct":26},"计算河段内断面面积、形状、河床糙率及水力因素等无急剧变化",{"key":31,"text":398,"correct":26},"对库区尾部和有重要淹没对象的河段应适当加密计算断面",{"id":400,"libraryId":5,"type":37,"typeLabel":38,"stem":401,"options":402,"answer":20,"analysis":34},958500,"( )以下的水库容积为死库容。",[403,404,405,407],{"key":20,"text":368,"correct":26},{"key":24,"text":370,"correct":22},{"key":28,"text":406,"correct":22},"汛期排沙水位",{"key":31,"text":408,"correct":22},"防洪限制水位",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":421,"analysis":34},958501,"通常，当实际发生的洪水( )防洪标准的洪水时，通过防洪系统的正确运用，能保证防洪对象的防洪安全。",[413,415,417,419],{"key":20,"text":414,"correct":22},"大于",{"key":24,"text":416,"correct":26},"小于",{"key":28,"text":418,"correct":26},"等于",{"key":31,"text":420,"correct":22},"为2倍","BC",{"id":423,"libraryId":5,"type":37,"typeLabel":38,"stem":424,"options":425,"answer":31,"analysis":34},958502,"( )之间的水库容积为调洪库容。",[426,428,430,432],{"key":20,"text":427,"correct":22},"正常蓄水位至防洪限制水位",{"key":24,"text":429,"correct":22},"死水位至防洪限制水位",{"key":28,"text":431,"correct":22},"防洪高水位至防洪限制水位",{"key":31,"text":433,"correct":26},"校核洪水位至防洪限制水位",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":446,"analysis":34},958503,"水电站机组不同额定水头方案影响以下哪些指标？( )",[438,440,442,444],{"key":20,"text":439,"correct":22},"电力电量效益",{"key":24,"text":441,"correct":22},"电站投资",{"key":28,"text":443,"correct":26},"电站厂房尺寸",{"key":31,"text":445,"correct":26},"机组额定出力","CD",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":168,"analysis":34},958504,"( )的水库工程，往往采用重复容量的经济性确定装机规模。",[451,453,455,457],{"key":20,"text":452,"correct":26},"灌溉、城市供水兼顾发电",{"key":24,"text":454,"correct":26},"非发电用水比重较大",{"key":28,"text":456,"correct":26},"在发电时间上受供水时程的局限",{"key":31,"text":458,"correct":26},"跨流域调水兼顾发电",{"id":460,"libraryId":5,"type":37,"typeLabel":38,"stem":461,"options":462,"answer":24,"analysis":34},958505,"对于低水头、调节性能差的水电站，日调节损失可达日电量的( )。",[463,465,467,469],{"key":20,"text":464,"correct":22},"2%～5%",{"key":24,"text":466,"correct":26},"3%～10%",{"key":28,"text":468,"correct":22},"5%～10%",{"key":31,"text":470,"correct":22},"10%～15%",{"id":472,"libraryId":5,"type":37,"typeLabel":38,"stem":473,"options":474,"answer":28,"analysis":34},958506,"水库遇到( )时，在坝前达到的最高水位为校核洪水位。",[475,477,479,481],{"key":20,"text":476,"correct":22},"下游防护对象的设计标准洪水",{"key":24,"text":478,"correct":22},"大坝的设计洪水",{"key":28,"text":480,"correct":26},"大坝的校核洪水",{"key":31,"text":482,"correct":22},"任何标准洪水",{"id":484,"libraryId":5,"type":37,"typeLabel":38,"stem":485,"options":486,"answer":24,"analysis":34},958507,"我国电力系统的月调节系数一般为( )，季不均衡系数一般为( )。",[487,489,491,493],{"key":20,"text":488,"correct":22},"1.0～1.25，0.90～0.92",{"key":24,"text":490,"correct":26},"1.10～1.15，0.90～0.92",{"key":28,"text":492,"correct":22},"1.0～1.25，0.80～0.92",{"key":31,"text":494,"correct":22},"1.10～1.15，0.80～0.92",{"id":496,"libraryId":5,"type":37,"typeLabel":38,"stem":497,"options":498,"answer":20,"analysis":34},958508,"水库遇到大坝的设计洪水时，在坝前达到的最高水位为( )。",[499,500,501,502],{"key":20,"text":372,"correct":26},{"key":24,"text":374,"correct":22},{"key":28,"text":113,"correct":22},{"key":31,"text":408,"correct":22},{"id":504,"libraryId":5,"type":37,"typeLabel":38,"stem":505,"options":506,"answer":24,"analysis":34},958509,"水库遇到大坝的校核洪水时，在坝前达到的最高水位为( )。",[507,508,509,510],{"key":20,"text":372,"correct":22},{"key":24,"text":374,"correct":26},{"key":28,"text":113,"correct":22},{"key":31,"text":408,"correct":22},{"id":512,"libraryId":5,"type":37,"typeLabel":38,"stem":513,"options":514,"answer":31,"analysis":34},958510,"水轮机的组成部件包括( )。",[515,517,519,521],{"key":20,"text":516,"correct":22},"引水部件、储水部件、耗水部件、泄水部件",{"key":24,"text":518,"correct":22},"引水部件、储水部件、工作部件、排水部件",{"key":28,"text":520,"correct":22},"引水部件、导水部件、耗水部件、排水部件",{"key":31,"text":522,"correct":26},"引水部件、导水部件、工作部件、泄水部件",{"id":524,"libraryId":5,"type":37,"typeLabel":38,"stem":525,"options":526,"answer":20,"analysis":34},958511,"水电站按( )分为无调节、日(周)调节、年(季)调节和多年调节四大类型。",[527,529,531,533],{"key":20,"text":528,"correct":26},"调节性能",{"key":24,"text":530,"correct":22},"过水能力",{"key":28,"text":532,"correct":22},"水头大小",{"key":31,"text":534,"correct":22},"天然流量",{"id":536,"libraryId":5,"type":37,"typeLabel":38,"stem":537,"options":538,"answer":31,"analysis":34},958512,"校核洪水位至防洪限制水位之间的水库容积为( )。",[539,541,543,545],{"key":20,"text":540,"correct":22},"重叠库容",{"key":24,"text":542,"correct":22},"兴利库容",{"key":28,"text":544,"correct":22},"防洪库容",{"key":31,"text":546,"correct":26},"调洪库容",{"id":548,"libraryId":5,"type":37,"typeLabel":38,"stem":549,"options":550,"answer":31,"analysis":34},958513,"按节水标准，中型灌区渠系水利用系数不应低于( )。",[551,553,555,557],{"key":20,"text":552,"correct":22},"0.50",{"key":24,"text":554,"correct":22},"0.55",{"key":28,"text":556,"correct":22},"0.60",{"key":31,"text":558,"correct":26},"0.65",{"id":560,"libraryId":5,"type":37,"typeLabel":38,"stem":34,"options":561,"answer":24,"analysis":34},958514,[562,564,566,568],{"key":20,"text":563,"correct":22},"1.1",{"key":24,"text":565,"correct":26},"1.2",{"key":28,"text":567,"correct":22},"1.3",{"key":31,"text":569,"correct":22},"1.4",{"id":571,"libraryId":5,"type":37,"typeLabel":38,"stem":572,"options":573,"answer":20,"analysis":34},958515,"水库正常蓄水位与( )之间的变幅称水库消落深度。",[574,575,576,577],{"key":20,"text":368,"correct":26},{"key":24,"text":372,"correct":22},{"key":28,"text":113,"correct":22},{"key":31,"text":408,"correct":22},{"id":579,"libraryId":5,"type":37,"typeLabel":38,"stem":580,"options":581,"answer":20,"analysis":34},958516,"水电站装机容量由( )组成。",[582,584,586,588],{"key":20,"text":583,"correct":26},"必需容量和重复容量",{"key":24,"text":585,"correct":22},"必需容量和备用容量",{"key":28,"text":587,"correct":22},"工作容量和重复容量",{"key":31,"text":589,"correct":22},"工作容量和备用容量",{"id":591,"libraryId":5,"type":37,"typeLabel":38,"stem":592,"options":593,"answer":28,"analysis":34},958517,"下列因素中，( )不是水电站装机容量选择的主要影响因素。",[594,596,598,600],{"key":20,"text":595,"correct":22},"水电站水库的调节性能",{"key":24,"text":597,"correct":22},"水电站开发方式",{"key":28,"text":599,"correct":26},"挡水建筑物型式",{"key":31,"text":601,"correct":22},"径流特性",{"id":603,"libraryId":5,"type":37,"typeLabel":38,"stem":604,"options":605,"answer":20,"analysis":34},958518,"解决常遇洪水的防洪问题往往优先采用的防洪工程系统是( )。",[606,608,609,610],{"key":20,"text":607,"correct":26},"堤防",{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},[612,615,618,621,624,627],{"id":37,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":37},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":37},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":37},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]