[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":631},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,26,50,1656,[13,35,48,60,73,86,99,112,126,138,150,162,174,186,198,210,222,234,243,255,267,279,291,303,315,327,339,351,363,375,387,399,411,423,435,447,459,471,483,495,507,519,531,543,559,571,583,595,607,619],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},959319,2,"多选题","闸底板的作用有( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","将闸室上部结构的重量及荷载传到地基",true,{"key":24,"text":25,"correct":22},"B","防渗",{"key":27,"text":28,"correct":22},"C","防冲",{"key":30,"text":31,"correct":32},"D","排水",false,"ABC","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},959320,"闸孔设计包括( )。",[39,41,43,45],{"key":20,"text":40,"correct":22},"选择堰型",{"key":24,"text":42,"correct":22},"确定堰顶高程或底板高程",{"key":27,"text":44,"correct":22},"确定单孔尺寸",{"key":30,"text":46,"correct":22},"确定闸室总宽度","ABCD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":33,"analysis":34},959321,"尾水管主要有( )。",[52,54,56,58],{"key":20,"text":53,"correct":22},"粤锥型",{"key":24,"text":55,"correct":22},"弯肘型",{"key":27,"text":57,"correct":22},"弯锥型",{"key":30,"text":59,"correct":32},"弯道型",{"id":61,"libraryId":5,"type":15,"typeLabel":16,"stem":62,"options":63,"answer":72,"analysis":34},959322,"水闸的防渗设施是指( )。",[64,66,68,70],{"key":20,"text":65,"correct":22},"铺盖",{"key":24,"text":67,"correct":22},"板桩及齿墙",{"key":27,"text":69,"correct":32},"护坦",{"key":30,"text":71,"correct":32},"海漫","AB",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":85,"analysis":34},959323,"重力坝施工期的温度应力包括( )。",[77,79,81,83],{"key":20,"text":78,"correct":22},"地基约束引起的应力",{"key":24,"text":80,"correct":32},"坝面水压力强度",{"key":27,"text":82,"correct":22},"内外温差引起的应力",{"key":30,"text":84,"correct":32},"扬压力强度","AC",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":98,"analysis":34},959324,"水电站厂房各层高程确定的顺序是( )。",[90,92,94,96],{"key":20,"text":91,"correct":22},"确定水轮机的安装高程",{"key":24,"text":93,"correct":32},"最后确定压力钢管的进口高程",{"key":27,"text":95,"correct":22},"向下依次确定尾水管底板高程、开挖高程",{"key":30,"text":97,"correct":22},"向上依次确定水轮机层地板高程、发电机层地板高程、吊车轨顶高程、厂房天花板及屋顶高程","ACD",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":111,"analysis":34},959325,"为减小机组转速上升率，应( )。",[103,105,107,109],{"key":20,"text":104,"correct":32},"设调压室",{"key":24,"text":106,"correct":22},"设放空阀",{"key":27,"text":108,"correct":22},"减小Ts",{"key":30,"text":110,"correct":32},"增大Ts","BC",{"id":113,"libraryId":5,"type":114,"typeLabel":115,"stem":116,"options":117,"answer":24,"analysis":34},959326,1,"单选题","兼有排涝闸作用的挡潮闸在满足排水、泄水条件下，闸槛高程应( )。",[118,120,122,124],{"key":20,"text":119,"correct":32},"尽量高些",{"key":24,"text":121,"correct":22},"尽量低些",{"key":27,"text":123,"correct":32},"尽量齐平",{"key":30,"text":125,"correct":32},"A或C",{"id":127,"libraryId":5,"type":114,"typeLabel":115,"stem":128,"options":129,"answer":20,"analysis":34},959327,"水闸的地下轮廓线是指( )。",[130,132,134,136],{"key":20,"text":131,"correct":22},"不透水的铺盖、板桩及底板与地基的接触线",{"key":24,"text":133,"correct":32},"板桩、底板及护坦与地基的接触线",{"key":27,"text":135,"correct":32},"底板、护坦与地基的接触线",{"key":30,"text":137,"correct":32},"铺盖、板桩与地基的接触线",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":72,"analysis":34},959328,"闸室基底应力分析可采用( )。",[142,144,146,148],{"key":20,"text":143,"correct":22},"材料力学法",{"key":24,"text":145,"correct":22},"有限元法",{"key":27,"text":147,"correct":32},"流网法",{"key":30,"text":149,"correct":32},"抗滑稳定分析法",{"id":151,"libraryId":5,"type":114,"typeLabel":115,"stem":152,"options":153,"answer":30,"analysis":34},959329,"溢流坝的反弧段应结合( )选择。",[154,156,158,160],{"key":20,"text":155,"correct":32},"直线段",{"key":24,"text":157,"correct":32},"孔口泄流的抛物线",{"key":27,"text":159,"correct":32},"幂曲线",{"key":30,"text":161,"correct":22},"下游消能形式",{"id":163,"libraryId":5,"type":114,"typeLabel":115,"stem":164,"options":165,"answer":30,"analysis":34},959330,"对拱坝坝基进行全面固结灌浆时，固结灌浆孔的孔距、排距一般为，固结灌浆孔的孔深宜采用。( )",[166,168,170,172],{"key":20,"text":167,"correct":32},"2～4m、4～8m",{"key":24,"text":169,"correct":32},"2～5m、5～8m",{"key":27,"text":171,"correct":32},"2～5m、4～6m",{"key":30,"text":173,"correct":22},"2～4m、5～8m",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":47,"analysis":34},959331,"控制堰堰型可选用( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"带胸墙孔口式的实用堰",{"key":24,"text":181,"correct":22},"宽顶堰",{"key":27,"text":183,"correct":22},"开敞式实用堰",{"key":30,"text":185,"correct":22},"驼峰堰",{"id":187,"libraryId":5,"type":114,"typeLabel":115,"stem":188,"options":189,"answer":24,"analysis":34},959332,"水电站进水建筑物的进口流速一般控制在( )左右。",[190,192,194,196],{"key":20,"text":191,"correct":32},"0.5ms",{"key":24,"text":193,"correct":22},"1.5ms",{"key":27,"text":195,"correct":32},"1.2ms",{"key":30,"text":197,"correct":32},"1.0ms",{"id":199,"libraryId":5,"type":114,"typeLabel":115,"stem":200,"options":201,"answer":27,"analysis":34},959333,"多泥沙河流上的进水闸(分洪闸、分水闸)闸槛高程可比( )。",[202,204,206,208],{"key":20,"text":203,"correct":32},"河(渠)底略低",{"key":24,"text":205,"correct":32},"河(渠)底高许多",{"key":27,"text":207,"correct":22},"河(渠)底略高",{"key":30,"text":209,"correct":32},"A或B",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":47,"analysis":34},959334,"渗流变形的形式有( )。",[214,216,218,220],{"key":20,"text":215,"correct":22},"管涌",{"key":24,"text":217,"correct":22},"流土",{"key":27,"text":219,"correct":22},"接触冲刷",{"key":30,"text":221,"correct":22},"接触流土",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":33,"analysis":34},959335,"安装间可布置于主厂房的( )。",[226,228,230,232],{"key":20,"text":227,"correct":22},"一端",{"key":24,"text":229,"correct":22},"两端",{"key":27,"text":231,"correct":22},"中间段",{"key":30,"text":233,"correct":32},"任何位置",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":85,"analysis":34},959336,"为减小水击压力，可采取( )等措施。",[238,239,240,242],{"key":20,"text":104,"correct":22},{"key":24,"text":108,"correct":32},{"key":27,"text":241,"correct":22},"采用合理的启闭规律",{"key":30,"text":110,"correct":32},{"id":244,"libraryId":5,"type":114,"typeLabel":115,"stem":245,"options":246,"answer":24,"analysis":34},959337,"防渗土料浸水与失水时( )。",[247,249,251,253],{"key":20,"text":248,"correct":32},"体积变化大",{"key":24,"text":250,"correct":22},"体积变化小",{"key":27,"text":252,"correct":32},"体积不发生变化",{"key":30,"text":254,"correct":32},"体积随时间发生改变",{"id":256,"libraryId":5,"type":114,"typeLabel":115,"stem":257,"options":258,"answer":30,"analysis":34},959338,"拱坝的坝轴线通常定义为坝顶拱圈的( )。",[259,261,263,265],{"key":20,"text":260,"correct":32},"双曲线",{"key":24,"text":262,"correct":32},"内缘弧线",{"key":27,"text":264,"correct":32},"内、外缘弧线之间的中心线",{"key":30,"text":266,"correct":22},"外缘弧线",{"id":268,"libraryId":5,"type":114,"typeLabel":115,"stem":269,"options":270,"answer":30,"analysis":34},959339,"重力坝依靠自重产生的压应力来满足( )要求。",[271,273,275,277],{"key":20,"text":272,"correct":32},"基岩固结",{"key":24,"text":274,"correct":32},"渗流",{"key":27,"text":276,"correct":32},"沉降",{"key":30,"text":278,"correct":22},"强度",{"id":280,"libraryId":5,"type":114,"typeLabel":115,"stem":281,"options":282,"answer":30,"analysis":34},959340,"重力坝依靠自重产生的( )来抵消由于水压力所引起的拉应力，以满足强度要求。",[283,285,287,289],{"key":20,"text":284,"correct":32},"扬压力",{"key":24,"text":286,"correct":32},"拉应力",{"key":27,"text":288,"correct":32},"抗滑力",{"key":30,"text":290,"correct":22},"压应力",{"id":292,"libraryId":5,"type":114,"typeLabel":115,"stem":293,"options":294,"answer":30,"analysis":34},959341,"联合消能适用的情况为( )。",[295,297,299,301],{"key":20,"text":296,"correct":32},"水头较小的中、低坝",{"key":24,"text":298,"correct":32},"适用于尾水较浅河道",{"key":27,"text":300,"correct":32},"河床和两岸在一定范围内有较高的抗冲能力的顺直河道",{"key":30,"text":302,"correct":22},"泄洪量大的高、中坝",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":33,"analysis":34},959342,"根据堤身断面形式，堤型可选择( )。",[307,309,311,313],{"key":20,"text":308,"correct":22},"斜坡式堤",{"key":24,"text":310,"correct":22},"直墙式堤",{"key":27,"text":312,"correct":22},"直斜复合式堤",{"key":30,"text":314,"correct":32},"心墙式土堤",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":33,"analysis":34},959343,"防止土石坝发生渗透变形的工程措施有( )。",[319,321,323,325],{"key":20,"text":320,"correct":22},"设置防渗设施",{"key":24,"text":322,"correct":22},"设置排水沟或减压井",{"key":27,"text":324,"correct":22},"设置反滤层",{"key":30,"text":326,"correct":32},"草皮护坡",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":47,"analysis":34},959344,"提高闸室抗滑稳定的措施有( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"增加闸室底板的齿墙深度",{"key":24,"text":334,"correct":22},"利用上游钢筋混凝土铺盖作为阻滑板",{"key":27,"text":336,"correct":22},"将闸门位置略向下游一侧移动，或将水闸底板向上游一侧加长，以便多利用一部分水重",{"key":30,"text":338,"correct":22},"增加铺盖长度，或在不影响抗渗稳定的前提下，将排水设施向水闸底板靠近，以减小作用在底板上的渗透压力",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":47,"analysis":34},959345,"闸室底板必须具有足够的( )。",[343,345,347,349],{"key":20,"text":344,"correct":22},"整体性",{"key":24,"text":346,"correct":22},"坚固性",{"key":27,"text":348,"correct":22},"抗渗性",{"key":30,"text":350,"correct":22},"耐久性",{"id":352,"libraryId":5,"type":114,"typeLabel":115,"stem":353,"options":354,"answer":24,"analysis":34},959346,"贴坡排水层的顶部高程应( )坝体浸润线出逸点。",[355,357,359,361],{"key":20,"text":356,"correct":32},"低于",{"key":24,"text":358,"correct":22},"高于",{"key":27,"text":360,"correct":32},"等于",{"key":30,"text":362,"correct":32},"低于或等于",{"id":364,"libraryId":5,"type":114,"typeLabel":115,"stem":365,"options":366,"answer":27,"analysis":34},959347,"1、2级粘性土坝的压实度应为( )。",[367,369,371,373],{"key":20,"text":368,"correct":32},"96%～98%",{"key":24,"text":370,"correct":32},"小于98%",{"key":27,"text":372,"correct":22},"98%～100%",{"key":30,"text":374,"correct":32},"大于100%",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":98,"analysis":34},959348,"水击计算中，串联管道简化应满足( )原则。",[379,381,383,385],{"key":20,"text":380,"correct":22},"管长不变",{"key":24,"text":382,"correct":32},"流速不变",{"key":27,"text":384,"correct":22},"相长不变",{"key":30,"text":386,"correct":22},"动能不变",{"id":388,"libraryId":5,"type":114,"typeLabel":115,"stem":389,"options":390,"answer":24,"analysis":34},959349,"堆石坝的砂砾石料的相对密度为( )。",[391,393,395,397],{"key":20,"text":392,"correct":32},"0.70～0.95",{"key":24,"text":394,"correct":22},"0.75～0.85",{"key":27,"text":396,"correct":32},"0.75～0.95",{"key":30,"text":398,"correct":32},"0.85～0.95",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":47,"analysis":34},959350,"土石坝按施工方法可分为( )。",[403,405,407,409],{"key":20,"text":404,"correct":22},"碾压式土石坝",{"key":24,"text":406,"correct":22},"冲填式土石坝",{"key":27,"text":408,"correct":22},"水中填土土石坝",{"key":30,"text":410,"correct":22},"定向爆破土石坝",{"id":412,"libraryId":5,"type":114,"typeLabel":115,"stem":413,"options":414,"answer":24,"analysis":34},959351,"坝身泄水孔，若采用无压孔，则无压孔( )组成。",[415,417,419,421],{"key":20,"text":416,"correct":32},"由有压段",{"key":24,"text":418,"correct":22},"由有压段和无压段",{"key":27,"text":420,"correct":32},"由无压段",{"key":30,"text":422,"correct":32},"由渐变段",{"id":424,"libraryId":5,"type":114,"typeLabel":115,"stem":425,"options":426,"answer":24,"analysis":34},959352,"坚硬的粘性土和岩石地基上，上下游翼墙可采用( )。",[427,429,431,433],{"key":20,"text":428,"correct":32},"圆弧形",{"key":24,"text":430,"correct":22},"扭曲面与岸坡连接的形式",{"key":27,"text":432,"correct":32},"折线形",{"key":30,"text":434,"correct":32},"椭圆弧形",{"id":436,"libraryId":5,"type":114,"typeLabel":115,"stem":437,"options":438,"answer":27,"analysis":34},959353,"面板堆石坝过渡区细石料要求级配连续，最大粒径不宜( )。",[439,441,443,445],{"key":20,"text":440,"correct":32},"大于320mm",{"key":24,"text":442,"correct":32},"小于300mm",{"key":27,"text":444,"correct":22},"大于300mm",{"key":30,"text":446,"correct":32},"小于320mm",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":72,"analysis":34},959354,"下列关于混凝土重力坝的建基面位置的说法正确的是( )。",[451,453,455,457],{"key":20,"text":452,"correct":22},"当坝高超过100m时，可建在新鲜、微风化或弱风化下部基岩上",{"key":24,"text":454,"correct":22},"坝高100～50m时，可建在微风化至弱风化中部基岩上",{"key":27,"text":456,"correct":32},"坝高小于50～20m时，可建在弱风化中部至上部基岩上",{"key":30,"text":458,"correct":32},"坝高小于20m时，可建在弱风化上部基岩上",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":85,"analysis":34},959355,"水轮机的最优工况是指( )。",[463,465,467,469],{"key":20,"text":464,"correct":22},"效率最高",{"key":24,"text":466,"correct":32},"出力最大",{"key":27,"text":468,"correct":22},"撞击和涡流损失最小",{"key":30,"text":470,"correct":32},"流量最大",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":33,"analysis":34},959356,"灌溉隧洞的横断面尺寸，应根据隧洞的( )确定。",[475,477,479,481],{"key":20,"text":476,"correct":22},"进口高程",{"key":24,"text":478,"correct":22},"出口高程",{"key":27,"text":480,"correct":22},"加大流量",{"key":30,"text":482,"correct":32},"围堰高度",{"id":484,"libraryId":5,"type":114,"typeLabel":115,"stem":485,"options":486,"answer":30,"analysis":34},959357,"软黏土是指天然含水量大于液限，孔隙比大于1的黏性土，其具有的基本特性描述正确的是( )。",[487,489,491,493],{"key":20,"text":488,"correct":32},"抗拉强度低，压缩性低，透水性大，灵敏度低，力学性能差",{"key":24,"text":490,"correct":32},"抗剪强度低，压缩性高，透水性高，灵敏度高，力学性能差",{"key":27,"text":492,"correct":32},"抗拉强度低，压缩性低，透水性高，灵敏度低，力学性能差",{"key":30,"text":494,"correct":22},"抗剪强度低，压缩性高，透水性小，灵敏度高，力学性能差",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":72,"analysis":34},959358,"明管管线应( )。",[499,501,503,505],{"key":20,"text":500,"correct":22},"避开可能产生滑坡的地段",{"key":24,"text":502,"correct":22},"避开可能产生崩塌的地段",{"key":27,"text":504,"correct":32},"避开地下水位高的地段",{"key":30,"text":506,"correct":32},"避开涌水量很大的地段",{"id":508,"libraryId":5,"type":114,"typeLabel":115,"stem":509,"options":510,"answer":24,"analysis":34},959359,"河床式厂房的特点是( )。",[511,513,515,517],{"key":20,"text":512,"correct":32},"厂房不承受水压力",{"key":24,"text":514,"correct":22},"厂房承受水压力",{"key":27,"text":516,"correct":32},"厂顶过水",{"key":30,"text":518,"correct":32},"厂顶不过水",{"id":520,"libraryId":5,"type":114,"typeLabel":115,"stem":521,"options":522,"answer":20,"analysis":34},959360,"底流式消能的适用条件和特点是( )。",[523,525,527,529],{"key":20,"text":524,"correct":22},"适用于下游尾水位低、变幅大，地质条件差、工作可靠，但工程量较大",{"key":24,"text":526,"correct":32},"适用于基岩比较坚固的高坝或中坝",{"key":27,"text":528,"correct":32},"适用于下游尾水位较深，流量变化范围较小，水位变幅不大，或有排冰、浮木要求的情况",{"key":30,"text":530,"correct":32},"适用于尾水位较深、变幅较小，无航运要求，且下游河床和两岸有一定抗冲能力的情况",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":47,"analysis":34},959361,"过闸水流的形态要求做到( )。",[535,537,539,541],{"key":20,"text":536,"correct":22},"流量分布均匀",{"key":24,"text":538,"correct":22},"水流平顺",{"key":27,"text":540,"correct":22},"不出现偏流",{"key":30,"text":542,"correct":22},"不出现危害性冲刷或淤积",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":558,"analysis":34},959362,"河岸式溢洪道布置包括( )。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"进水渠",{"key":24,"text":550,"correct":22},"控制段",{"key":27,"text":552,"correct":22},"泄槽",{"key":30,"text":554,"correct":22},"消能防冲设施",{"key":556,"text":557,"correct":22},"E","出水渠","ABCDE",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":33,"analysis":34},959363,"进水口按照水流条件分为( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"开敞式",{"key":24,"text":566,"correct":22},"浅孔式",{"key":27,"text":568,"correct":22},"深孔式",{"key":30,"text":570,"correct":32},"塔式",{"id":572,"libraryId":5,"type":114,"typeLabel":115,"stem":573,"options":574,"answer":20,"analysis":34},959364,"险工段的坝式护岸顶部应超过( )。",[575,577,579,581],{"key":20,"text":576,"correct":22},"设计洪水位0.5m",{"key":24,"text":578,"correct":32},"校核洪水位0.5m",{"key":27,"text":580,"correct":32},"设计洪水位0.7m",{"key":30,"text":582,"correct":32},"校核洪水位0.7m",{"id":584,"libraryId":5,"type":114,"typeLabel":115,"stem":585,"options":586,"answer":24,"analysis":34},959365,"高度在( )为中坝。",[587,589,591,593],{"key":20,"text":588,"correct":32},"30m",{"key":24,"text":590,"correct":22},"30～70m",{"key":27,"text":592,"correct":32},"50～90m",{"key":30,"text":594,"correct":32},"70m以上",{"id":596,"libraryId":5,"type":114,"typeLabel":115,"stem":597,"options":598,"answer":27,"analysis":34},959366,"土石坝的排水设备能( )。",[599,601,603,605],{"key":20,"text":600,"correct":32},"延长渗径",{"key":24,"text":602,"correct":32},"减小渗透坡降",{"key":27,"text":604,"correct":22},"减小渗流量",{"key":30,"text":606,"correct":32},"增加下游坝坡的稳定性",{"id":608,"libraryId":5,"type":114,"typeLabel":115,"stem":609,"options":610,"answer":20,"analysis":34},959367,"整体式闸室结构在闸墩中间设( )。",[611,613,615,617],{"key":20,"text":612,"correct":22},"顺水流向的永久缝",{"key":24,"text":614,"correct":32},"垂直水流向的永久缝",{"key":27,"text":616,"correct":32},"顺水流向的施工缝",{"key":30,"text":618,"correct":32},"垂直水流向的施工缝",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":72,"analysis":34},959368,"墙式护岸临水侧的结构型式可采用( )。",[623,625,627,629],{"key":20,"text":624,"correct":22},"自立式",{"key":24,"text":626,"correct":22},"陡坡式",{"key":27,"text":628,"correct":32},"直立式",{"key":30,"text":630,"correct":32},"斜坡式",[632,635,638,641,644,647],{"id":114,"name":633,"category":7,"favorite":634},"领导干部任职前廉政法规知识测试题",92,{"id":636,"name":637,"category":7,"favorite":114},595,"建筑结构与设备",{"id":639,"name":640,"category":7,"favorite":114},715,"招标采购专业知识与法律法规",{"id":642,"name":643,"category":7,"favorite":114},848,"市政方向-通用基础",{"id":645,"name":646,"category":7,"favorite":8},534,"BIM工程师",{"id":648,"name":646,"category":7,"favorite":8},535]