[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":625},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,24,50,1656,[13,34,46,61,73,85,97,109,121,133,145,157,169,181,193,205,218,230,242,254,266,278,288,300,312,324,336,348,360,372,384,397,409,419,432,444,456,468,481,493,505,517,529,541,553,565,577,589,601,613],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},959219,1,"单选题","棱体排水设备适宜于( )的情况。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","下游面坡陡",false,{"key":24,"text":25,"correct":22},"B","下游无水",{"key":27,"text":28,"correct":29},"C","下游有水",true,{"key":31,"text":32,"correct":22},"D","下游面坡缓","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},959220,"整体式控制堰适用于( )的情况。",[38,40,42,44],{"key":20,"text":39,"correct":29},"地基均匀性较差",{"key":24,"text":41,"correct":22},"岩性比较均匀",{"key":27,"text":43,"correct":22},"任何岩性条件",{"key":31,"text":45,"correct":22},"或A或B",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":60,"analysis":33},959221,2,"多选题","控制段结构设计荷载组合应分为( )。",[52,54,56,58],{"key":20,"text":53,"correct":29},"基本组合",{"key":24,"text":55,"correct":29},"特殊组合",{"key":27,"text":57,"correct":22},"非常组合",{"key":31,"text":59,"correct":22},"正常组合","AB",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":20,"analysis":33},959222,"抗滑稳定分析的目的是核算坝体沿坝基面或者沿地基深层软弱结构面抗滑稳定的( )。",[65,67,69,71],{"key":20,"text":66,"correct":29},"安全度",{"key":24,"text":68,"correct":22},"可靠度",{"key":27,"text":70,"correct":22},"强度",{"key":31,"text":72,"correct":22},"变形",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":27,"analysis":33},959223,"均质土堤填筑土料含水率与最优含水率的允许偏差为( )。",[77,79,81,83],{"key":20,"text":78,"correct":22},"±2％",{"key":24,"text":80,"correct":22},"±1％",{"key":27,"text":82,"correct":29},"±3％",{"key":31,"text":84,"correct":22},"±4％",{"id":86,"libraryId":5,"type":15,"typeLabel":16,"stem":87,"options":88,"answer":24,"analysis":33},959224,"进水闸或分水闸的中心线与河道或渠道中心线的交角不宜( )。",[89,91,93,95],{"key":20,"text":90,"correct":22},"小于30°",{"key":24,"text":92,"correct":29},"超过30°",{"key":27,"text":94,"correct":22},"小于60°",{"key":31,"text":96,"correct":22},"超过60°",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":31,"analysis":33},959225,"进水渠混凝土衬砌厚度可取为( )。",[101,103,105,107],{"key":20,"text":102,"correct":22},"20mm",{"key":24,"text":104,"correct":22},"30mm",{"key":27,"text":106,"correct":22},"25cm",{"key":31,"text":108,"correct":29},"30cm",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":24,"analysis":33},959226,"导墙墙顶高程应高于( )。",[113,115,117,119],{"key":20,"text":114,"correct":22},"设计库水位",{"key":24,"text":116,"correct":29},"泄洪时最高库水位",{"key":27,"text":118,"correct":22},"校核洪水位",{"key":31,"text":120,"correct":22},"水库正常运用水位",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":27,"analysis":33},959227,"进水渠的直立式导墙的平面弧线曲率半径不宜( )。",[125,127,129,131],{"key":20,"text":126,"correct":22},"小于2.5倍渠道底宽",{"key":24,"text":128,"correct":22},"大于2倍渠道底宽",{"key":27,"text":130,"correct":29},"小于2倍渠道底宽",{"key":31,"text":132,"correct":22},"大于2.5倍渠道底宽",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":20,"analysis":33},959228,"直立式导墙顺水流方向的长度宜( )。",[137,139,141,143],{"key":20,"text":138,"correct":29},"大于堰前水深的2倍",{"key":24,"text":140,"correct":22},"小于堰前水深的2倍",{"key":27,"text":142,"correct":22},"大于堰前水深的3倍",{"key":31,"text":144,"correct":22},"小于堰前水深的3倍",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},959229,"进水渠较长时，在控制段之前设置的渐变段长度不宜( )。",[149,151,153,155],{"key":20,"text":150,"correct":22},"大于2倍堰前水深",{"key":24,"text":152,"correct":29},"小于2倍堰前水深",{"key":27,"text":154,"correct":22},"小于3倍堰前水深",{"key":31,"text":156,"correct":22},"大于3倍堰前水深",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":27,"analysis":33},959230,"进水口中心线与河道水流夹角为( )。",[161,163,165,167],{"key":20,"text":162,"correct":22},"25°～30°",{"key":24,"text":164,"correct":22},"30°～35°",{"key":27,"text":166,"correct":29},"30°～45°",{"key":31,"text":168,"correct":22},"45°～60°",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":24,"analysis":33},959231,"进口底板高程，通常应在水库( )。",[173,175,177,179],{"key":20,"text":174,"correct":22},"设计洪水位以上0.5～1.0m",{"key":24,"text":176,"correct":29},"设计淤沙高程以上0.5～1.0m",{"key":27,"text":178,"correct":22},"河床平均高程以上0.5～1.0m",{"key":31,"text":180,"correct":22},"河床平均高程以下0.5～1.0m",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":20,"analysis":33},959232,"建筑在坚实或中等坚实地基上的翼墙分段长度可用( )m。",[185,187,189,191],{"key":20,"text":186,"correct":29},"15～20",{"key":24,"text":188,"correct":22},"15～25",{"key":27,"text":190,"correct":22},"15～30",{"key":31,"text":192,"correct":22},"20～30",{"id":194,"libraryId":5,"type":48,"typeLabel":49,"stem":195,"options":196,"answer":60,"analysis":33},959233,"确定重力坝坝体断面的依据是( )。",[197,199,201,203],{"key":20,"text":198,"correct":29},"材料力学法",{"key":24,"text":200,"correct":29},"刚体极限平衡法",{"key":27,"text":202,"correct":22},"弹性地基梁法",{"key":31,"text":204,"correct":22},"拱冠梁法",{"id":206,"libraryId":5,"type":48,"typeLabel":49,"stem":207,"options":208,"answer":217,"analysis":33},959234,"重力坝地基处理的主要任务是( )。",[209,211,213,215],{"key":20,"text":210,"correct":29},"防渗",{"key":24,"text":212,"correct":29},"提高基岩的强度",{"key":27,"text":214,"correct":29},"提高基岩的整体性",{"key":31,"text":216,"correct":22},"固结灌浆","ABC",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":20,"analysis":33},959235,"基本组合的坝体混凝土抗压安全系数应符合的条件是( )。",[222,224,226,228],{"key":20,"text":223,"correct":29},"不小于4.0",{"key":24,"text":225,"correct":22},"不小于3.5",{"key":27,"text":227,"correct":22},"不小于3.0",{"key":31,"text":229,"correct":22},"不小于4.5",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},959236,"横缝止水或基础止水应与坝基妥善连接，止水片埋入基岩的深度宜为( )m。",[234,236,238,240],{"key":20,"text":235,"correct":22},"0.2～0.3",{"key":24,"text":237,"correct":22},"0.3～0.4",{"key":27,"text":239,"correct":29},"0.3～0.5",{"key":31,"text":241,"correct":22},"0.4～0.5",{"id":243,"libraryId":5,"type":48,"typeLabel":49,"stem":244,"options":245,"answer":60,"analysis":33},959237,"重力坝的横缝可以是( )。",[246,248,250,252],{"key":20,"text":247,"correct":29},"伸缩缝",{"key":24,"text":249,"correct":29},"沉陷缝",{"key":27,"text":251,"correct":22},"施工缝",{"key":31,"text":253,"correct":22},"临时缝",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},959238,"非圆形断面的高度应( )。",[258,260,262,264],{"key":20,"text":259,"correct":22},"小于1.5m",{"key":24,"text":261,"correct":22},"大于1.5m",{"key":27,"text":263,"correct":22},"小于1.8m",{"key":31,"text":265,"correct":29},"大于1.8m",{"id":267,"libraryId":5,"type":48,"typeLabel":49,"stem":268,"options":269,"answer":60,"analysis":33},959239,"鱼道可以结合( )的布置而设置。",[270,272,274,276],{"key":20,"text":271,"correct":29},"岸墙",{"key":24,"text":273,"correct":29},"翼墙",{"key":27,"text":275,"correct":22},"大坝",{"key":31,"text":277,"correct":22},"溢洪道",{"id":279,"libraryId":5,"type":48,"typeLabel":49,"stem":280,"options":281,"answer":60,"analysis":33},959240,"过木孔或岸边过木道不适合紧靠( )布置。",[282,284,286,287],{"key":20,"text":283,"correct":29},"泵站",{"key":24,"text":285,"correct":29},"水电站",{"key":27,"text":275,"correct":22},{"key":31,"text":277,"correct":22},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},959241,"3级中、低坝及3级以下的中坝压实度为( )。",[292,294,296,298],{"key":20,"text":293,"correct":22},"95%～96%",{"key":24,"text":295,"correct":29},"96%～98%",{"key":27,"text":297,"correct":22},"96%～100%",{"key":31,"text":299,"correct":22},"98%～100%",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},959242,"拱坝所受水平荷载的一部分通过( )的作用压向两岸。",[304,306,308,310],{"key":20,"text":305,"correct":22},"梁",{"key":24,"text":307,"correct":29},"拱",{"key":27,"text":309,"correct":22},"拱和梁共同",{"key":31,"text":311,"correct":22},"基岩",{"id":313,"libraryId":5,"type":48,"typeLabel":49,"stem":314,"options":315,"answer":217,"analysis":33},959243,"拱坝水平拱圈最大中心角应根据( )等因素选择。",[316,318,320,322],{"key":20,"text":317,"correct":29},"稳定",{"key":24,"text":319,"correct":29},"应力",{"key":27,"text":321,"correct":29},"工程量",{"key":31,"text":323,"correct":22},"上游面坡度",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},959244,"薄拱坝是指拱坝最大坝高处的坝底厚度T与坝高H之比不大于( )的拱坝。",[328,330,332,334],{"key":20,"text":329,"correct":22},"0.10",{"key":24,"text":331,"correct":29},"0.2",{"key":27,"text":333,"correct":22},"0.25",{"key":31,"text":335,"correct":22},"0.35",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},959245,"高流速无压隧洞的横断面尺寸宜通过试验确定，并宜考虑( )的影响。",[340,342,344,346],{"key":20,"text":341,"correct":22},"气蚀",{"key":24,"text":343,"correct":22},"冲击波",{"key":27,"text":345,"correct":29},"掺气",{"key":31,"text":347,"correct":22},"过冰",{"id":349,"libraryId":5,"type":48,"typeLabel":49,"stem":350,"options":351,"answer":60,"analysis":33},959246,"干渠穿过地形起伏较大的不平坦地区或丘陵地区时，其线路尽量( )。",[352,354,356,358],{"key":20,"text":353,"correct":29},"避免深挖方",{"key":24,"text":355,"correct":29},"避免高填方",{"key":27,"text":357,"correct":22},"采用渡槽",{"key":31,"text":359,"correct":22},"采用倒虹吸",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},959247,"分离式闸室结构是在( )上设置永久缝。",[364,366,368,370],{"key":20,"text":365,"correct":22},"闸墩中间",{"key":24,"text":367,"correct":29},"闸室底板上",{"key":27,"text":369,"correct":22},"闸墩一侧",{"key":31,"text":371,"correct":22},"两侧边墩",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},959248,"钢管穿过主厂房上游墙处，宜设( )。",[376,378,380,382],{"key":20,"text":377,"correct":29},"软垫层",{"key":24,"text":379,"correct":22},"刚性垫层",{"key":27,"text":381,"correct":22},"反滤层",{"key":31,"text":383,"correct":22},"排水层",{"id":385,"libraryId":5,"type":48,"typeLabel":49,"stem":386,"options":387,"answer":396,"analysis":33},959249,"防渗帷幕应符合的要求有( )。",[388,390,392,394],{"key":20,"text":389,"correct":29},"具有连续性和耐久性",{"key":24,"text":391,"correct":29},"减少坝基和绕坝渗漏，防止其对坝基及两岸边坡稳定产生不利影响",{"key":27,"text":393,"correct":22},"具有足够的整体性和均匀性",{"key":31,"text":395,"correct":29},"防止在坝基软弱结构面、断层破碎带、岩体裂隙充填物以及抗渗性能差的岩层中产生渗透破坏","ABD",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},959250,"下列关于反滤层与过渡层作用的说法正确的是( )。",[401,403,405,407],{"key":20,"text":402,"correct":22},"过渡层能起到反滤层的要求，反滤层却不一定能满足过渡层要求",{"key":24,"text":404,"correct":22},"反滤层可以起过渡层的作用，过渡层也能满足反滤要求",{"key":27,"text":406,"correct":22},"过渡层能起到反滤层的要求，反滤层也能满足过渡层要求",{"key":31,"text":408,"correct":29},"反滤层可以起过渡层的作用，过渡层却不一定能满足反滤要求",{"id":410,"libraryId":5,"type":48,"typeLabel":49,"stem":411,"options":412,"answer":60,"analysis":33},959251,"在分区坝的防渗体与坝壳之间，根据需要与土料情况可以只设反滤层，也可同时设置( )。",[413,414,416,417],{"key":20,"text":381,"correct":29},{"key":24,"text":415,"correct":29},"过渡层",{"key":27,"text":383,"correct":22},{"key":31,"text":418,"correct":22},"防渗层",{"id":420,"libraryId":5,"type":48,"typeLabel":49,"stem":421,"options":422,"answer":431,"analysis":33},959252,"对于流速小于20m\u002Fs的有压隧洞，弯曲半径和转角不应( )。",[423,425,427,429],{"key":20,"text":424,"correct":29},"弯曲半径小于3.0倍洞径(或洞宽)",{"key":24,"text":426,"correct":22},"弯曲半径大于3.0倍的洞径(或洞宽)",{"key":27,"text":428,"correct":22},"转角小于60°",{"key":31,"text":430,"correct":29},"转角大于60°","AD",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":27,"analysis":33},959253,"3级拱坝的安全系数采用( )。",[436,438,440,442],{"key":20,"text":437,"correct":22},"2.5",{"key":24,"text":439,"correct":22},"3.0",{"key":27,"text":441,"correct":29},"3.5",{"key":31,"text":443,"correct":22},"4.0",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},959254,"干渠、支渠布置以( )为目的。",[448,450,452,454],{"key":20,"text":449,"correct":29},"争取最大的自流灌溉面积",{"key":24,"text":451,"correct":22},"争取最大的灌溉面积",{"key":27,"text":453,"correct":22},"争取最好的排水效果",{"key":31,"text":455,"correct":22},"争取最小的工程量",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},959255,"对于浅层易液化土层应采取的防护措施为( )。",[460,462,464,466],{"key":20,"text":461,"correct":22},"挖除",{"key":24,"text":463,"correct":29},"加密",{"key":27,"text":465,"correct":22},"振冲",{"key":31,"text":467,"correct":22},"强夯",{"id":469,"libraryId":5,"type":48,"typeLabel":49,"stem":470,"options":471,"answer":480,"analysis":33},959256,"墙式护岸适应于( )的坍岸段。",[472,474,476,478],{"key":20,"text":473,"correct":29},"河道狭窄",{"key":24,"text":475,"correct":29},"堤外无滩易受水流冲刷",{"key":27,"text":477,"correct":29},"保护对象重要",{"key":31,"text":479,"correct":29},"受地形条件或已建建筑物限制","ABCD",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},959257,"堆石的填筑标准宜用( )作为设计控制指标。",[485,487,489,491],{"key":20,"text":486,"correct":22},"压实度",{"key":24,"text":488,"correct":29},"孔隙率",{"key":27,"text":490,"correct":22},"含水率",{"key":31,"text":492,"correct":22},"相对密度",{"id":494,"libraryId":5,"type":48,"typeLabel":49,"stem":495,"options":496,"answer":480,"analysis":33},959258,"水工隧洞洞身段的纵坡应根据( )等综合分析决定。",[497,499,501,503],{"key":20,"text":498,"correct":29},"运用要求",{"key":24,"text":500,"correct":29},"上下游衔接",{"key":27,"text":502,"correct":29},"沿线建筑物的底部高程",{"key":31,"text":504,"correct":29},"施工和检修条件",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},959259,"地下厂房洞室顶部岩体厚度不宜( )。",[509,511,513,515],{"key":20,"text":510,"correct":29},"小于洞室开挖宽度的2倍",{"key":24,"text":512,"correct":22},"大于洞室开挖宽度的2倍",{"key":27,"text":514,"correct":22},"小于洞室开挖宽度的5倍",{"key":31,"text":516,"correct":22},"大于洞室开挖宽度的5倍",{"id":518,"libraryId":5,"type":48,"typeLabel":49,"stem":519,"options":520,"answer":217,"analysis":33},959260,"地下式厂房，以厂房的埋藏方式划分为( )。",[521,523,525,527],{"key":20,"text":522,"correct":29},"地下式",{"key":24,"text":524,"correct":29},"窑洞式",{"key":27,"text":526,"correct":29},"半地下式",{"key":31,"text":528,"correct":22},"河床式",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},959261,"地下厂房洞室群上下层洞室之间岩石厚度不宜( )。",[533,535,537,539],{"key":20,"text":534,"correct":22},"小于洞室开挖宽度的1倍",{"key":24,"text":536,"correct":22},"大于洞室开挖宽度的1倍",{"key":27,"text":538,"correct":29},"小于洞室开挖宽度的1～2倍",{"key":31,"text":540,"correct":22},"大于洞室开挖宽度的1～2倍",{"id":542,"libraryId":5,"type":48,"typeLabel":49,"stem":543,"options":544,"answer":60,"analysis":33},959262,"底流消能适用于( )。",[545,547,549,551],{"key":20,"text":546,"correct":29},"中、低坝",{"key":24,"text":548,"correct":29},"基岩软弱的河道",{"key":27,"text":550,"correct":22},"中、高坝",{"key":31,"text":552,"correct":22},"基岩坚硬的河道",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},959263,"湖堤、海堤应尽可能( )。",[557,559,561,563],{"key":20,"text":558,"correct":22},"避开强风",{"key":24,"text":560,"correct":29},"避开强风或暴潮正面袭击",{"key":27,"text":562,"correct":22},"避开强风或暴潮侧面袭击",{"key":31,"text":564,"correct":22},"避开暴潮",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},959264,"险工段的坝式护岸顶部应( )。",[569,571,573,575],{"key":20,"text":570,"correct":22},"高于枯水位0.5m以上",{"key":24,"text":572,"correct":22},"超过正常运用水位0.5m以上",{"key":27,"text":574,"correct":29},"超过设计洪水位0.5m以上",{"key":31,"text":576,"correct":22},"高于非常运用水位0.5m以上",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},959265,"当闸下尾水深度小于跃后水深时，可采用( )消力池消能。",[581,583,585,587],{"key":20,"text":582,"correct":22},"二级",{"key":24,"text":584,"correct":22},"突槛式",{"key":27,"text":586,"correct":29},"下挖式",{"key":31,"text":588,"correct":22},"综合式",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},959266,"轻粉质沙壤土闸基上的闸室上游宜采用( )防渗布置形式。",[593,595,597,599],{"key":20,"text":594,"correct":22},"地下连续墙",{"key":24,"text":596,"correct":22},"铺盖",{"key":27,"text":598,"correct":22},"垂直",{"key":31,"text":600,"correct":29},"铺盖和垂直防渗体相结合",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":20,"analysis":33},959267,"当堰(闸)承受双向(顺水流方向和垂直水流方向)荷载时，还应( )。",[605,607,609,611],{"key":20,"text":606,"correct":29},"验算其最不利荷载组合方向的抗滑稳定性",{"key":24,"text":608,"correct":22},"验算其基本荷载组合方向的抗滑稳定性",{"key":27,"text":610,"correct":22},"验算其特殊荷载组合方向的抗滑稳定性",{"key":31,"text":612,"correct":22},"验算其正常荷载组合方向的抗滑稳定性",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":31,"analysis":33},959268,"当水闸承受水头较高，且闸下河床及岸坡为坚硬岩体时，可采用( )消能。",[617,619,621,623],{"key":20,"text":618,"correct":22},"多级消力池",{"key":24,"text":620,"correct":22},"面流式",{"key":27,"text":622,"correct":22},"综合式消力池",{"key":31,"text":624,"correct":29},"挑流式",[626,629,632,635,638,641],{"id":15,"name":627,"category":7,"favorite":628},"领导干部任职前廉政法规知识测试题",92,{"id":630,"name":631,"category":7,"favorite":15},595,"建筑结构与设备",{"id":633,"name":634,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":636,"name":637,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":639,"name":640,"category":7,"favorite":8},534,"BIM工程师",{"id":642,"name":640,"category":7,"favorite":8},535]