[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":626},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,23,50,1656,[13,34,49,61,73,86,99,111,123,135,147,159,171,179,191,203,215,228,240,252,263,275,287,299,311,323,335,347,359,371,383,395,407,419,431,443,455,466,478,490,502,515,527,539,551,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},959169,1,"单选题","坝高为50～100m岩体相对隔水层的透水率为符合条件的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2",false,{"key":24,"text":25,"correct":26},"B","4",true,{"key":28,"text":29,"correct":22},"C","6",{"key":31,"text":32,"correct":22},"D","8","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":48,"analysis":33},959170,2,"多选题","压力管道型式分为( )。",[40,42,44,46],{"key":20,"text":41,"correct":26},"明管",{"key":24,"text":43,"correct":26},"地下埋管",{"key":28,"text":45,"correct":26},"坝内埋管",{"key":31,"text":47,"correct":26},"钢衬钢筋混凝土管","ABCD",{"id":50,"libraryId":5,"type":15,"typeLabel":16,"stem":51,"options":52,"answer":24,"analysis":33},959171,"钢管在任何条件下产生的最大应力( )。",[53,55,57,59],{"key":20,"text":54,"correct":22},"不得超过钢管内水压力",{"key":24,"text":56,"correct":26},"不得超过管材的允许应力",{"key":28,"text":58,"correct":22},"不得超过钢材屈服强度",{"key":31,"text":60,"correct":22},"A或C",{"id":62,"libraryId":5,"type":36,"typeLabel":37,"stem":63,"options":64,"answer":48,"analysis":33},959172,"溢流重力坝常用的消能方式有( )。",[65,67,69,71],{"key":20,"text":66,"correct":26},"底流式消能",{"key":24,"text":68,"correct":26},"挑流式消能",{"key":28,"text":70,"correct":26},"面流式消能",{"key":31,"text":72,"correct":26},"消力戽",{"id":74,"libraryId":5,"type":36,"typeLabel":37,"stem":75,"options":76,"answer":85,"analysis":33},959173,"泄水建筑物的高速水流区易发生空蚀破坏的部位包括( )。",[77,79,81,83],{"key":20,"text":78,"correct":22},"出口、闸门槽",{"key":24,"text":80,"correct":26},"反弧段及其附近",{"key":28,"text":82,"correct":26},"分流墩",{"key":31,"text":84,"correct":22},"溢流坝面上和泄水孔流速大于30ms的区域","BC",{"id":87,"libraryId":5,"type":36,"typeLabel":37,"stem":88,"options":89,"answer":98,"analysis":33},959174,"消力戽消能( )。",[90,92,94,96],{"key":20,"text":91,"correct":26},"适用于尾水较深河道",{"key":24,"text":93,"correct":26},"适用于下游河床和两岸有一定抗冲能力的河道",{"key":28,"text":95,"correct":22},"适用于尾水较浅河道",{"key":31,"text":97,"correct":22},"不考虑尾水影响","AB",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":28,"analysis":33},959175,"消力戽或戽式消能工可用于( )的情况，下游河床及两岸有一定抗冲能力的枢纽。",[103,105,107,109],{"key":20,"text":104,"correct":22},"不考虑下游水深",{"key":24,"text":106,"correct":22},"下游水深小于跃后水深",{"key":28,"text":108,"correct":26},"下游水深大于跃后水深",{"key":31,"text":110,"correct":22},"不考虑跃后水深",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":20,"analysis":33},959176,"下游翼墙的平均扩散角每侧宜采用( )。",[115,117,119,121],{"key":20,"text":116,"correct":26},"7°～12°",{"key":24,"text":118,"correct":22},"7°～15°",{"key":28,"text":120,"correct":22},"8°～12°",{"key":31,"text":122,"correct":22},"9°～12°",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},959177,"分洪闸的中心线宜( )。",[127,129,131,133],{"key":20,"text":128,"correct":22},"交角小于60°",{"key":24,"text":130,"correct":22},"偏离河道主流方向",{"key":28,"text":132,"correct":22},"交角大于60°",{"key":31,"text":134,"correct":26},"正对河道主流方向",{"id":136,"libraryId":5,"type":36,"typeLabel":37,"stem":137,"options":138,"answer":48,"analysis":33},959178,"提高重力坝抗滑稳定性的工程措施有( )。",[139,141,143,145],{"key":20,"text":140,"correct":26},"利用水重",{"key":24,"text":142,"correct":26},"采用有利的开挖轮廓线",{"key":28,"text":144,"correct":26},"设置齿墙",{"key":31,"text":146,"correct":26},"预应力措施",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":28,"analysis":33},959179,"土质防渗体顶部的水平宽度不宜( )m。",[151,153,155,157],{"key":20,"text":152,"correct":22},"小于2",{"key":24,"text":154,"correct":22},"大于2",{"key":28,"text":156,"correct":26},"小于3",{"key":31,"text":158,"correct":22},"大于3",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":28,"analysis":33},959180,"土质防渗体底部厚度，心墙不宜( )。",[163,165,167,169],{"key":20,"text":164,"correct":22},"小于水头的1\u002F5",{"key":24,"text":166,"correct":22},"大于水头的1\u002F5",{"key":28,"text":168,"correct":26},"小于水头的1\u002F4",{"key":31,"text":170,"correct":22},"大于水头的1\u002F4",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},959181,"土质防渗体底部厚度，斜墙不宜( )。",[175,176,177,178],{"key":20,"text":164,"correct":26},{"key":24,"text":166,"correct":22},{"key":28,"text":168,"correct":22},{"key":31,"text":170,"correct":22},{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":24,"analysis":33},959182,"土质防渗体顶部和土质斜墙上游应设( )。",[183,185,187,189],{"key":20,"text":184,"correct":22},"垫层",{"key":24,"text":186,"correct":26},"保护层",{"key":28,"text":188,"correct":22},"防渗层",{"key":31,"text":190,"correct":22},"反滤层",{"id":192,"libraryId":5,"type":36,"typeLabel":37,"stem":193,"options":194,"answer":48,"analysis":33},959183,"碾压土石坝稳定计算的内容有( )。",[195,197,199,201],{"key":20,"text":196,"correct":26},"施工期上、下游坝坡",{"key":24,"text":198,"correct":26},"稳定渗流期的上、下游坝坡",{"key":28,"text":200,"correct":26},"水库水位降落期的上游坝坡",{"key":31,"text":202,"correct":26},"正常运用遇地震的上、下游坝坡",{"id":204,"libraryId":5,"type":36,"typeLabel":37,"stem":205,"options":206,"answer":48,"analysis":33},959184,"碾压土石坝控制稳定的工况有( )。",[207,209,211,213],{"key":20,"text":208,"correct":26},"施工期(包括竣工时)",{"key":24,"text":210,"correct":26},"稳定渗流期",{"key":28,"text":212,"correct":26},"水库水位降落期",{"key":31,"text":214,"correct":26},"正常运用遇地震",{"id":216,"libraryId":5,"type":36,"typeLabel":37,"stem":217,"options":218,"answer":227,"analysis":33},959185,"碾压土石坝的基本形式有( )。",[219,221,223,225],{"key":20,"text":220,"correct":26},"均质坝",{"key":24,"text":222,"correct":26},"土质防渗体分区坝",{"key":28,"text":224,"correct":26},"非土质材料防渗体坝",{"key":31,"text":226,"correct":22},"混凝土心墙坝","ABC",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},959186,"土石坝渗流控制的基本原则是( )。",[232,234,236,238],{"key":20,"text":233,"correct":22},"防",{"key":24,"text":235,"correct":26},"防、排结合",{"key":28,"text":237,"correct":22},"排",{"key":31,"text":239,"correct":22},"堵",{"id":241,"libraryId":5,"type":36,"typeLabel":37,"stem":242,"options":243,"answer":48,"analysis":33},959187,"土石坝设计的基本要求有( )。",[244,246,248,250],{"key":20,"text":245,"correct":26},"具有足够的断面以保持坝的稳定",{"key":24,"text":247,"correct":26},"设置良好的防渗和排水设施以控制渗流",{"key":28,"text":249,"correct":26},"根据现场条件选择筑坝材料的种类、坝的结构型式",{"key":31,"text":251,"correct":26},"坝基足够稳定",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},959188,"水闸闸下宜采用( )消能。",[256,258,260,262],{"key":20,"text":257,"correct":22},"挑流式",{"key":24,"text":259,"correct":26},"底流式",{"key":28,"text":261,"correct":22},"面流式",{"key":31,"text":72,"correct":22},{"id":264,"libraryId":5,"type":36,"typeLabel":37,"stem":265,"options":266,"answer":48,"analysis":33},959189,"水闸闸室结构有( )等。",[267,269,271,273],{"key":20,"text":268,"correct":26},"开敞式",{"key":24,"text":270,"correct":26},"胸墙式",{"key":28,"text":272,"correct":26},"涵洞式",{"key":31,"text":274,"correct":26},"双层式",{"id":276,"libraryId":5,"type":36,"typeLabel":37,"stem":277,"options":278,"answer":227,"analysis":33},959190,"水闸的组成部分有( )。",[279,281,283,285],{"key":20,"text":280,"correct":26},"闸室",{"key":24,"text":282,"correct":26},"上游连接段",{"key":28,"text":284,"correct":26},"下游连接段",{"key":31,"text":286,"correct":22},"护坦",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},959191,"需用闸门控制泄水的水闸宜采用( )。",[291,293,295,297],{"key":20,"text":292,"correct":26},"弧形闸门",{"key":24,"text":294,"correct":22},"下沉式闸门",{"key":28,"text":296,"correct":22},"平板闸门",{"key":31,"text":298,"correct":22},"叠梁闸门、",{"id":300,"libraryId":5,"type":36,"typeLabel":37,"stem":301,"options":302,"answer":227,"analysis":33},959192,"水工隧洞设计应满足( )的要求。",[303,305,307,309],{"key":20,"text":304,"correct":26},"工程总体规划",{"key":24,"text":306,"correct":26},"环境",{"key":28,"text":308,"correct":26},"水土保持",{"key":31,"text":310,"correct":22},"战争",{"id":312,"libraryId":5,"type":36,"typeLabel":37,"stem":313,"options":314,"answer":227,"analysis":33},959193,"坝后式厂房分为( )。",[315,317,319,321],{"key":20,"text":316,"correct":26},"坝后式明厂房",{"key":24,"text":318,"correct":26},"溢流式厂房",{"key":28,"text":320,"correct":26},"挑流式厂房",{"key":31,"text":322,"correct":22},"地下式厂房",{"id":324,"libraryId":5,"type":36,"typeLabel":37,"stem":325,"options":326,"answer":227,"analysis":33},959194,"水锤计算应提供的计算成果应包括( )。",[327,329,331,333],{"key":20,"text":328,"correct":26},"正常工况最高压力线",{"key":24,"text":330,"correct":26},"特殊工况最高压力线",{"key":28,"text":332,"correct":26},"特殊工况最低压力线",{"key":31,"text":334,"correct":22},"正常工况最低压力线",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},959195,"衬砌的大型渠道，为了水流平顺，在弯道处可将( )。",[339,341,343,345],{"key":20,"text":340,"correct":26},"凹岸渠底抬高",{"key":24,"text":342,"correct":22},"凸岸渠底抬高",{"key":28,"text":344,"correct":22},"凹岸渠底降低",{"key":31,"text":346,"correct":22},"凸岸渠底降低",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},959196,"湿陷性黄土采用开挖回填的方式处理坝基时，是将坝基湿陷性黄土全部或部分挖除，回填土料的含水率应接近( )。",[351,353,355,357],{"key":20,"text":352,"correct":22},"天然含水率",{"key":24,"text":354,"correct":26},"饱和含水率",{"key":28,"text":356,"correct":22},"最优含水率",{"key":31,"text":358,"correct":22},"平均含水率",{"id":360,"libraryId":5,"type":36,"typeLabel":37,"stem":361,"options":362,"answer":48,"analysis":33},959197,"土石坝发生渗透变形的形式是( )。",[363,365,367,369],{"key":20,"text":364,"correct":26},"管涌",{"key":24,"text":366,"correct":26},"流土",{"key":28,"text":368,"correct":26},"接触冲刷",{"key":31,"text":370,"correct":26},"剥离和化学管涌",{"id":372,"libraryId":5,"type":36,"typeLabel":37,"stem":373,"options":374,"answer":227,"analysis":33},959198,"渗流分析的方法有( )。",[375,377,379,381],{"key":20,"text":376,"correct":26},"水力学法",{"key":24,"text":378,"correct":26},"流网法",{"key":28,"text":380,"correct":26},"有限元法",{"key":31,"text":382,"correct":22},"毕肖普法",{"id":384,"libraryId":5,"type":36,"typeLabel":37,"stem":385,"options":386,"answer":227,"analysis":33},959199,"土石坝渗流分析的目的是( )。",[387,389,391,393],{"key":20,"text":388,"correct":26},"确定经济可靠的坝型",{"key":24,"text":390,"correct":26},"确定合理的结构尺寸",{"key":28,"text":392,"correct":26},"确定适宜的防渗排水设施",{"key":31,"text":394,"correct":22},"确定土石坝坝基的扬压力",{"id":396,"libraryId":5,"type":36,"typeLabel":37,"stem":397,"options":398,"answer":48,"analysis":33},959200,"土石坝渗流分析的内容包括( )。",[399,401,403,405],{"key":20,"text":400,"correct":26},"确定坝体内浸润线及其下游逸出点的位置",{"key":24,"text":402,"correct":26},"绘制坝体及坝基内的等势线或流网分布图",{"key":28,"text":404,"correct":26},"确定渗流流速与比降",{"key":31,"text":406,"correct":26},"确定渗流量",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},959201,"上游翼墙顺水流向的投影长度应( )铺盖长度。",[411,413,415,417],{"key":20,"text":412,"correct":22},"大于",{"key":24,"text":414,"correct":22},"或等于",{"key":28,"text":416,"correct":22},"小于",{"key":31,"text":418,"correct":26},"A和B",{"id":420,"libraryId":5,"type":36,"typeLabel":37,"stem":421,"options":422,"answer":98,"analysis":33},959202,"上游翼墙的平面布置宜采用( )。",[423,425,427,429],{"key":20,"text":424,"correct":26},"圆弧形",{"key":24,"text":426,"correct":26},"椭圆弧形",{"key":28,"text":428,"correct":22},"圆弧与直线组合的形式",{"key":31,"text":430,"correct":22},"折线形",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},959203,"拱坝新老混凝土温差的容许范围是( )℃。",[435,437,439,441],{"key":20,"text":436,"correct":22},"10～15",{"key":24,"text":438,"correct":26},"15～20",{"key":28,"text":440,"correct":22},"20～25",{"key":31,"text":442,"correct":22},"25～30",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":28,"analysis":33},959204,"地震区、无粘性土压实要求，在浸润线以下的坝壳料的相对密度根据设计烈度大小选用( )。",[447,449,451,453],{"key":20,"text":448,"correct":22},"＞0.70",{"key":24,"text":450,"correct":22},"＜0.75",{"key":28,"text":452,"correct":26},"0.75～0.85",{"key":31,"text":454,"correct":22},"＞0.75",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},959205,"砂砾石和砂的填筑标准应以( )作为设计控制指标。",[459,460,462,464],{"key":20,"text":356,"correct":22},{"key":24,"text":461,"correct":22},"压实度",{"key":28,"text":463,"correct":22},"孔隙率",{"key":31,"text":465,"correct":26},"相对密度",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},959206,"砂砾石地基上建造土石坝的主要问题是( )。",[470,472,474,476],{"key":20,"text":471,"correct":26},"进行渗流控制",{"key":24,"text":473,"correct":22},"进行帷幕灌浆",{"key":28,"text":475,"correct":22},"进行固结灌浆",{"key":31,"text":477,"correct":22},"提高地基承载力",{"id":479,"libraryId":5,"type":36,"typeLabel":37,"stem":480,"options":481,"answer":227,"analysis":33},959207,"下列哪些选项是砂砾石坝基渗流控制的一般原则？( )",[482,484,486,488],{"key":20,"text":483,"correct":26},"应根据坝高、坝型、水库的用途及坝基地质条件，选择几种可能的方案进行比选，择优确定",{"key":24,"text":485,"correct":26},"砂砾石的渗流控制，不外是上铺、中截、下排，以及各项措施的综合应用",{"key":28,"text":487,"correct":26},"砂砾石层做了混凝土防渗墙后，其下部的基岩一般不需再进行灌浆，但对强透水带或岩溶地区仍需灌浆处理",{"key":31,"text":489,"correct":22},"砂砾石层深度在20m以内，宜选用明挖回填黏土截水槽",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},959208,"地震区土石坝的坝壳料不易采用( )。",[494,496,498,500],{"key":20,"text":495,"correct":22},"不均匀中、细砂及粉砂",{"key":24,"text":497,"correct":26},"均匀中、细砂及粉砂",{"key":28,"text":499,"correct":22},"均匀块石",{"key":31,"text":501,"correct":22},"砂砾料",{"id":503,"libraryId":5,"type":36,"typeLabel":37,"stem":504,"options":505,"answer":514,"analysis":33},959209,"墙式护岸的墙体( )。",[506,508,510,512],{"key":20,"text":507,"correct":26},"应设置排水孔，排水孔处应设置反滤层",{"key":24,"text":509,"correct":22},"只设置排水孔",{"key":28,"text":511,"correct":22},"不设排水孔及孔口处的反滤层",{"key":31,"text":513,"correct":26},"与岸坡之间可回填砂砾石","AD",{"id":516,"libraryId":5,"type":36,"typeLabel":37,"stem":517,"options":518,"answer":227,"analysis":33},959210,"下列选项属于启闭机类型的有( )。",[519,521,523,525],{"key":20,"text":520,"correct":26},"门式启闭机",{"key":24,"text":522,"correct":26},"移动式启闭机",{"key":28,"text":524,"correct":26},"螺杆式启闭机",{"key":31,"text":526,"correct":22},"窗式启闭机",{"id":528,"libraryId":5,"type":36,"typeLabel":37,"stem":529,"options":530,"answer":48,"analysis":33},959211,"坡式护岸下部护脚部分的结构型式有( )。",[531,533,535,537],{"key":20,"text":532,"correct":26},"土工织物枕",{"key":24,"text":534,"correct":26},"模袋混凝土块体",{"key":28,"text":536,"correct":26},"混和型式",{"key":31,"text":538,"correct":26},"沉排",{"id":540,"libraryId":5,"type":36,"typeLabel":37,"stem":541,"options":542,"answer":227,"analysis":33},959212,"碾压土石坝坝体排水的形式有( )。",[543,545,547,549],{"key":20,"text":544,"correct":26},"棱体排水",{"key":24,"text":546,"correct":26},"贴坡式排水",{"key":28,"text":548,"correct":26},"坝内排水",{"key":31,"text":550,"correct":22},"管道排水",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},959213,"碾压式土石坝坝坡的选择应最终经过( )确定。",[555,557,559,561],{"key":20,"text":556,"correct":26},"稳定计算",{"key":24,"text":558,"correct":22},"防渗计算",{"key":28,"text":560,"correct":22},"参照已建坝经验",{"key":31,"text":418,"correct":22},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},959214,"黏性土土堤l级堤防压实度值应满足的条件是( )。",[566,568,570,572],{"key":20,"text":567,"correct":26},"大于0.94",{"key":24,"text":569,"correct":22},"大于0.92",{"key":28,"text":571,"correct":22},"大于0.96",{"key":31,"text":573,"correct":22},"大于0.90",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},959215,"粘性土的施工填筑含水率应控制在( )偏差范围以内。",[578,580,582,584],{"key":20,"text":579,"correct":26},"-2%～+3%",{"key":24,"text":581,"correct":22},"-2%～-3%",{"key":28,"text":583,"correct":22},"+2%～-3%",{"key":31,"text":585,"correct":22},"+2%～+3%",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":28,"analysis":33},959216,"面板堆石坝高坝垫层料应具有连续级配，最大粒径为80～100mm，粒径小于的颗粒含量宜为30％～50％，粒径小于的颗粒含量宜少于8％。( )",[590,592,594,596],{"key":20,"text":591,"correct":22},"3mm、0.065mm",{"key":24,"text":593,"correct":22},"5mm、0.055mm",{"key":28,"text":595,"correct":26},"5mm、0.075mm",{"key":31,"text":597,"correct":22},"3mm、0.055mm",{"id":599,"libraryId":5,"type":36,"typeLabel":37,"stem":600,"options":601,"answer":227,"analysis":33},959217,"常用的闸门启闭机主要采用( )。",[602,604,606,608],{"key":20,"text":603,"correct":26},"卷扬式",{"key":24,"text":605,"correct":26},"螺杆式",{"key":28,"text":607,"correct":26},"液压式",{"key":31,"text":609,"correct":22},"轴承式",{"id":611,"libraryId":5,"type":36,"typeLabel":37,"stem":612,"options":613,"answer":625,"analysis":33},959218,"混凝土拱坝对地基的要求是( )。",[614,616,618,620,622],{"key":20,"text":615,"correct":26},"具有足够的整体性和稳定性",{"key":24,"text":617,"correct":26},"具有足够的强度和刚度",{"key":28,"text":619,"correct":26},"具有足够的抗渗性和有利的渗流场",{"key":31,"text":621,"correct":26},"具有足够的耐久性",{"key":623,"text":624,"correct":26},"E","坝体与地基接触面的形状适宜","ABCDE",[627,630,633,636,639,642],{"id":15,"name":628,"category":7,"favorite":629},"领导干部任职前廉政法规知识测试题",92,{"id":631,"name":632,"category":7,"favorite":15},595,"建筑结构与设备",{"id":634,"name":635,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":637,"name":638,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":640,"name":641,"category":7,"favorite":8},534,"BIM工程师",{"id":643,"name":641,"category":7,"favorite":8},535]