[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,22,50,1656,[13,34,46,61,73,85,97,109,121,133,145,157,169,176,184,196,204,216,224,236,248,261,273,285,297,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},959119,1,"单选题","封堵下闸的设计流量可用封堵时段( )，或按实测水文统计资料分析确定。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","5～10年重现期的月或旬平均流量",true,{"key":24,"text":25,"correct":26},"B","5～10年重现期的瞬时流量",false,{"key":28,"text":29,"correct":26},"C","5～20年重现期的月或旬平均流量",{"key":31,"text":32,"correct":26},"D","5～20年重现期的瞬时流量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},959120,"常与分期围堰配合的导流泄水建筑物有( )。",[38,40,42,44],{"key":20,"text":39,"correct":26},"明渠、坝体底孔",{"key":24,"text":41,"correct":26},"明渠、隧洞",{"key":28,"text":43,"correct":22},"坝体底孔、缺口",{"key":31,"text":45,"correct":26},"明渠、隧洞、涵管",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":60,"analysis":33},959121,2,"多选题","水利工程概算由( )构成。",[52,54,56,58],{"key":20,"text":53,"correct":22},"工程部分",{"key":24,"text":55,"correct":22},"移民和环境",{"key":28,"text":57,"correct":26},"独立费用",{"key":31,"text":59,"correct":26},"建设期贷款利息","AB",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":31,"analysis":33},959122,"施工导流是水利水电枢纽总体设计的重要组成部分，是选定( )的重要因素。",[65,67,69,71],{"key":20,"text":66,"correct":26},"枢纽布置方案、枢纽建筑物型式、施工方案",{"key":24,"text":68,"correct":26},"枢纽建筑物型式、施工程序和施工总进度",{"key":28,"text":70,"correct":26},"枢纽坝址、枢纽布置方案、施工方案",{"key":31,"text":72,"correct":22},"枢纽坝址、枢纽布置方案、枢纽建筑物型式、施工程序和施工总进度",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":28,"analysis":33},959123,"根据水利水电工程施工组织设计规范，导流标准的选取需根据导流建筑物的保护对象、失事后果、使用年限和临时性水工建筑物规模的指标，将导流建筑物划分为( )级。",[77,79,81,83],{"key":20,"text":78,"correct":26},"1～5",{"key":24,"text":80,"correct":26},"2～5",{"key":28,"text":82,"correct":22},"3～5",{"key":31,"text":84,"correct":26},"4～5",{"id":86,"libraryId":5,"type":15,"typeLabel":16,"stem":87,"options":88,"answer":24,"analysis":33},959124,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，3级混凝土坝校核标准为( )年一遇。",[89,91,93,95],{"key":20,"text":90,"correct":26},"50～20",{"key":24,"text":92,"correct":22},"100～50",{"key":28,"text":94,"correct":26},"200～100",{"key":31,"text":96,"correct":26},"500～200",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":20,"analysis":33},959125,"施工导流的目的是( )。",[101,103,105,107],{"key":20,"text":102,"correct":22},"形成基坑干地施工条件",{"key":24,"text":104,"correct":26},"采取措施把河水导向下游",{"key":28,"text":106,"correct":26},"截断河流",{"key":31,"text":108,"correct":26},"导流",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":24,"analysis":33},959126,"导流建筑物级别划分时，当其他三项指标中至少有1项满足3级指标，失事后果为淹没重要城镇、工矿企业、交通干线或推迟总工期及第一台(批)机组发电而造成重大灾害和损失时，导流建筑物的级别为( )级。",[113,115,117,119],{"key":20,"text":114,"correct":26},"2",{"key":24,"text":116,"correct":22},"3",{"key":28,"text":118,"correct":26},"4",{"key":31,"text":120,"correct":26},"5",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":20,"analysis":33},959127,"施工导流方式一般分为( )。",[125,127,129,131],{"key":20,"text":126,"correct":22},"全段围堰导流和分段围堰导流",{"key":24,"text":128,"correct":26},"分段围堰导流和分期围堰导流",{"key":28,"text":130,"correct":26},"明渠导流和隧洞导流",{"key":31,"text":132,"correct":26},"底孔导流和缺口导流",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":31,"analysis":33},959128,"跨度大于12m的洞室宜先挖导洞，分部分层扩挖。导洞设置部位及分部分层尺寸应结合( )等分析后确定。",[137,139,141,143],{"key":20,"text":138,"correct":26},"洞室断面、围岩类别、开挖设备、开挖周期",{"key":24,"text":140,"correct":26},"围岩类别、施工方法和程序、开挖周期",{"key":28,"text":142,"correct":26},"施工方法和程序、施工设备和出渣道路、开挖周期",{"key":31,"text":144,"correct":22},"洞室断面、围岩类别、施工方法和程序、施工设备和出渣道路",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":20,"analysis":33},959129,"防渗墙施工平台的平面尺寸应满足( )要求。",[149,151,153,155],{"key":20,"text":150,"correct":22},"造孔、清渣、混凝土浇筑和交通",{"key":24,"text":152,"correct":26},"造孔、混凝土浇筑、混凝土运输",{"key":28,"text":154,"correct":26},"造孔、清渣、混凝土运输",{"key":31,"text":156,"correct":26},"造孔、清渣、混凝土浇筑、使用施工机械",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},959130,"当日平均气温连续( )稳定在( )℃以下应按低温季节进行混凝土施工。",[161,163,165,167],{"key":20,"text":162,"correct":26},"5、0",{"key":24,"text":164,"correct":26},"3、-4",{"key":28,"text":166,"correct":26},"4、-5",{"key":31,"text":168,"correct":22},"5、-3",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":171,"answer":28,"analysis":33},959131,[172,173,174,175],{"key":20,"text":114,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":118,"correct":22},{"key":31,"text":120,"correct":26},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},959132,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，1级混凝土坝校核标准为( )年一遇。",[180,181,182,183],{"key":20,"text":90,"correct":26},{"key":24,"text":92,"correct":26},{"key":28,"text":94,"correct":26},{"key":31,"text":96,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":28,"analysis":33},959133,"防渗墙孔长度一般可为( )。",[188,190,192,194],{"key":20,"text":189,"correct":26},"5m以下",{"key":24,"text":191,"correct":26},"5m",{"key":28,"text":193,"correct":22},"5～9m",{"key":31,"text":195,"correct":26},"9m以上",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},959134,"导流建筑物级别划分时，当失事后果为淹没基坑，但对总工期及第一台(批)机组发电影响不大，经济损失较小时，导流建筑物的级别为( )级。",[200,201,202,203],{"key":20,"text":114,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":118,"correct":26},{"key":31,"text":120,"correct":22},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":28,"analysis":33},959135,"临时度汛洪水标准应根据坝型及坝前拦洪库容确定，混凝土坝拦洪库容大于1.0亿m3时，洪水标准为( )。",[208,210,212,214],{"key":20,"text":209,"correct":26},"20～10年",{"key":24,"text":211,"correct":26},"50～20年",{"key":28,"text":213,"correct":22},"不小于50年",{"key":31,"text":215,"correct":26},"100～50年",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},959136,"导流建筑物级别划分时，当使用年限小于1.5年时，导流建筑物的级别为( )级。",[220,221,222,223],{"key":20,"text":114,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":118,"correct":26},{"key":31,"text":120,"correct":22},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},959137,"施工总布置应充分掌握和综合( )等因素；合理确定并统筹规划布置为工程施工服务的各种临时设施；妥善处理施工场地内外关系；为保证工程施工质量、加快施工进度、提高经济效益创造条件。",[228,230,232,234],{"key":20,"text":229,"correct":26},"分析枢纽布置，主体建筑物规模、型式、特点，各种临时设施",{"key":24,"text":231,"correct":26},"分析枢纽布置，主体建筑物规模、型式、特点、施工条件，施工场地内外关系",{"key":28,"text":233,"correct":22},"分析枢纽布置，主体建筑物规模、型式、特点、施工条件和工程所在地区社会、经济、自然条件",{"key":31,"text":235,"correct":26},"分析枢纽布置，施工条件和工程所在地区社会、经济、自然条件，各种临时设施",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},959138,"截流标准可采用截流时段重现期( )流量。",[240,242,244,246],{"key":20,"text":241,"correct":22},"5～10年的月或旬平均",{"key":24,"text":243,"correct":26},"5～10年的月或旬最大",{"key":28,"text":245,"correct":26},"5～20年的月或旬平均",{"key":31,"text":247,"correct":26},"5～20年的月或旬最大",{"id":249,"libraryId":5,"type":48,"typeLabel":49,"stem":250,"options":251,"answer":260,"analysis":33},959139,"调压室水力计算的内容包括( )。",[252,254,256,258],{"key":20,"text":253,"correct":22},"最高涌浪",{"key":24,"text":255,"correct":22},"最低涌浪",{"key":28,"text":257,"correct":22},"稳定断面",{"key":31,"text":259,"correct":26},"确定流量","ABC",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},959140,"下列关于筑堤石料要求说法不正确的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":26},"抗风化性能好，冻融损失率小于1％",{"key":24,"text":268,"correct":22},"砌石块质量可采用0～150kg",{"key":28,"text":270,"correct":26},"石料外形宜为有砌面的长方体，边长比宜小于4",{"key":31,"text":272,"correct":26},"筑堤砂砾料应耐风化、水稳定性好，含泥量宜小于5％",{"id":274,"libraryId":5,"type":48,"typeLabel":49,"stem":275,"options":276,"answer":260,"analysis":33},959141,"对筑坝土石料提出的一般要求有( )。",[277,279,281,283],{"key":20,"text":278,"correct":22},"具有与使用目的适应的工程性质",{"key":24,"text":280,"correct":22},"土石料的工程性质在长时间内保持稳定",{"key":28,"text":282,"correct":22},"具有良好的压实性能",{"key":31,"text":284,"correct":26},"土石料中有机盐含量较高",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},959142,"重力坝在水压力及其他荷载作用下，主要依靠坝体自重产生的( )来满足稳定要求。",[289,291,293,295],{"key":20,"text":290,"correct":22},"抗滑力",{"key":24,"text":292,"correct":26},"压应力",{"key":28,"text":294,"correct":26},"摩擦力",{"key":31,"text":296,"correct":26},"扬压力",{"id":298,"libraryId":5,"type":48,"typeLabel":49,"stem":299,"options":300,"answer":309,"analysis":33},959143,"重力坝应力分析的方法有( )。",[301,303,305,307],{"key":20,"text":302,"correct":22},"模型试验法",{"key":24,"text":304,"correct":22},"材料力学法",{"key":28,"text":306,"correct":22},"弹性理论的解析法",{"key":31,"text":308,"correct":22},"弹性理论的差分法","ABCD",{"id":311,"libraryId":5,"type":48,"typeLabel":49,"stem":312,"options":313,"answer":309,"analysis":33},959144,"重力坝设计包括以下内容( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"检测设计",{"key":24,"text":317,"correct":22},"地基处理",{"key":28,"text":319,"correct":22},"应力分析",{"key":31,"text":321,"correct":22},"构造设计",{"id":323,"libraryId":5,"type":48,"typeLabel":49,"stem":324,"options":325,"answer":309,"analysis":33},959145,"重力坝承受的荷载主要有( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"静水压力",{"key":24,"text":329,"correct":22},"波浪压力",{"key":28,"text":331,"correct":22},"泥沙压力",{"key":31,"text":333,"correct":22},"自重",{"id":335,"libraryId":5,"type":48,"typeLabel":49,"stem":336,"options":337,"answer":309,"analysis":33},959146,"常用的消能工型式有( )。",[338,340,342,344],{"key":20,"text":339,"correct":22},"底流消能",{"key":24,"text":341,"correct":22},"挑流消能",{"key":28,"text":343,"correct":22},"面流消能",{"key":31,"text":345,"correct":22},"消力戽消能",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},959147,"扬压力对重力坝的稳定( )。",[350,352,354,356],{"key":20,"text":351,"correct":26},"有利",{"key":24,"text":353,"correct":22},"不利",{"key":28,"text":355,"correct":26},"或不利或有利",{"key":31,"text":357,"correct":26},"无影响",{"id":359,"libraryId":5,"type":48,"typeLabel":49,"stem":360,"options":361,"answer":60,"analysis":33},959148,"重力坝按泄水条件可分为( )。",[362,364,366,368],{"key":20,"text":363,"correct":22},"溢流坝",{"key":24,"text":365,"correct":22},"非溢流坝",{"key":28,"text":367,"correct":26},"宽缝重力坝",{"key":31,"text":369,"correct":26},"预应力重力坝",{"id":371,"libraryId":5,"type":48,"typeLabel":49,"stem":372,"options":373,"answer":309,"analysis":33},959149,"粘性土料的稳定坝坡为( )。",[374,376,378,380],{"key":20,"text":375,"correct":22},"曲面",{"key":24,"text":377,"correct":22},"上部坡陡",{"key":28,"text":379,"correct":22},"下部坡缓",{"key":31,"text":381,"correct":22},"沿高程分成数段",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},959150,"闸室顶部的胸墙结构一般都布置在( )。",[386,388,390,392],{"key":20,"text":387,"correct":26},"闸门的下游侧",{"key":24,"text":389,"correct":22},"闸门的上游侧",{"key":28,"text":391,"correct":26},"闸门的上侧",{"key":31,"text":393,"correct":26},"闸门的左侧",{"id":395,"libraryId":5,"type":48,"typeLabel":49,"stem":396,"options":397,"answer":309,"analysis":33},959151,"闸门应布置在( )。",[398,400,402,404],{"key":20,"text":399,"correct":22},"水流较平顺的部位",{"key":24,"text":401,"correct":22},"尽量避免门前横向流和旋涡",{"key":28,"text":403,"correct":22},"尽量避免门后淹没出流",{"key":31,"text":405,"correct":22},"尽量避免门后回流",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},959152,"当闸孔孔数超过8孔时，采用( )。",[410,412,414,416],{"key":20,"text":411,"correct":26},"单数孔",{"key":24,"text":413,"correct":26},"双数孔",{"key":28,"text":415,"correct":22},"A或B",{"key":31,"text":417,"correct":26},"8孔",{"id":419,"libraryId":5,"type":48,"typeLabel":49,"stem":420,"options":421,"answer":309,"analysis":33},959153,"闸顶高程不应低于( )。",[422,424,426,428],{"key":20,"text":423,"correct":22},"水闸正常蓄水位加波浪计算高度与相应安全超高值之和",{"key":24,"text":425,"correct":22},"设计洪水位与相应安全超高值之和",{"key":28,"text":427,"correct":22},"最高挡水位加波浪计算高度与相应安全超高值之和",{"key":31,"text":429,"correct":22},"校核洪水位与相应安全超高值之和",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},959154,"上下游翼墙的墙顶高程应分别( )。",[434,436,438,440],{"key":20,"text":435,"correct":22},"高于上下游最不利的运用水位",{"key":24,"text":437,"correct":26},"低于上下游最不利的运用水位",{"key":28,"text":439,"correct":26},"等于上下游最不利的运用水位",{"key":31,"text":441,"correct":26},"高于上下游正常运用水位",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},959155,"分区坝坝壳内各土层之间，坝壳与透水坝基的接触部位均应尽量满足( )。",[446,448,450,452],{"key":20,"text":447,"correct":26},"排水原则",{"key":24,"text":449,"correct":22},"反滤原则",{"key":28,"text":451,"correct":26},"防渗原则",{"key":31,"text":453,"correct":26},"抗侵蚀原则",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},959156,"松软地基上的岸墙和翼墙宜采用( )结构。",[458,460,462,464],{"key":20,"text":459,"correct":22},"空箱式",{"key":24,"text":461,"correct":26},"重力式",{"key":28,"text":463,"correct":26},"扶壁式",{"key":31,"text":465,"correct":26},"直墙式",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},959157,"夹有较大砾石的多泥沙河流上的水闸不宜设( )。",[470,472,474,476],{"key":20,"text":471,"correct":26},"防冲墙",{"key":24,"text":473,"correct":26},"护坦",{"key":28,"text":475,"correct":22},"消力池",{"key":31,"text":477,"correct":26},"海漫",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},959158,"导流堤在河道中顺河道方向布置，与水流成( )夹角。",[482,484,486,488],{"key":20,"text":483,"correct":26},"8°～10°",{"key":24,"text":485,"correct":26},"8°～20°",{"key":28,"text":487,"correct":22},"10°～20°",{"key":31,"text":489,"correct":26},"10°～30°",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},959159,"有压隧洞的横断面形状通常是( )。",[494,496,498,500],{"key":20,"text":495,"correct":22},"圆形",{"key":24,"text":497,"correct":26},"矩形",{"key":28,"text":499,"correct":26},"城门洞形",{"key":31,"text":501,"correct":26},"马蹄形",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},959160,"有压孔的工作闸门设在( )。",[506,508,510,512],{"key":20,"text":507,"correct":26},"中间段",{"key":24,"text":509,"correct":26},"进口端",{"key":28,"text":511,"correct":22},"出口端",{"key":31,"text":513,"correct":26},"靠近进口端",{"id":515,"libraryId":5,"type":48,"typeLabel":49,"stem":516,"options":517,"answer":60,"analysis":33},959161,"按引水要求不同，有坝引水分为( )。",[518,520,522,524],{"key":20,"text":519,"correct":22},"一岸引水",{"key":24,"text":521,"correct":22},"两岸引水",{"key":28,"text":523,"correct":26},"顺直段引水",{"key":31,"text":525,"correct":26},"弯道引水",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},959162,"由闸门控制泄水的水闸宜采用( )。",[530,532,534,536],{"key":20,"text":531,"correct":26},"下沉式闸门",{"key":24,"text":533,"correct":26},"平板闸门",{"key":28,"text":535,"correct":22},"弧形闸门",{"key":31,"text":537,"correct":26},"舌瓣闸门",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":28,"analysis":33},959163,"溢流坝段的堰面曲线，当采用开敞式溢流孔时可采用( )。",[542,544,546,548],{"key":20,"text":543,"correct":26},"折线",{"key":24,"text":545,"correct":26},"孔口泄流的抛物线",{"key":28,"text":547,"correct":22},"幂曲线",{"key":31,"text":549,"correct":26},"反弧半径",{"id":551,"libraryId":5,"type":48,"typeLabel":49,"stem":552,"options":553,"answer":60,"analysis":33},959164,"溢洪道的位置应选择有利的地形和地质条件，布置在( )位置。",[554,556,558,560],{"key":20,"text":555,"correct":22},"岸边",{"key":24,"text":557,"correct":22},"垭口",{"key":28,"text":559,"correct":26},"坝中央",{"key":31,"text":561,"correct":26},"电站旁",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},959165,"一般要求节制闸或泄洪闸上、下游河道的直线段长度不宜( )水闸进口处水面宽度。",[566,568,570,572],{"key":20,"text":567,"correct":22},"小于5倍",{"key":24,"text":569,"correct":26},"大于5倍",{"key":28,"text":571,"correct":26},"小于5.5倍",{"key":31,"text":573,"correct":26},"大于5.5倍.",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},959166,"一般情况下，进出口顶部岩体厚度不宜( )。",[578,580,582,584],{"key":20,"text":579,"correct":22},"小于1倍洞径或洞宽",{"key":24,"text":581,"correct":26},"大于1倍洞径或洞宽",{"key":28,"text":583,"correct":26},"小于5倍洞径或洞宽",{"key":31,"text":585,"correct":26},"大于5倍洞径或洞宽",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},959167,"对于重力坝沿坝基面的稳定性分析，当坝基内不存在可能导致深层滑动的软弱面时，应按( )公式计算。",[590,592,594,596],{"key":20,"text":591,"correct":22},"抗剪断强度",{"key":24,"text":593,"correct":26},"抗剪强度",{"key":28,"text":595,"correct":26},"A和B",{"key":31,"text":597,"correct":26},"摩擦",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},959168,"混凝土重力坝当坝基内不存在可能导致深层滑动的软弱面时，应按( )计算。",[602,604,606,608],{"key":20,"text":603,"correct":22},"抗剪断公式",{"key":24,"text":605,"correct":26},"摩擦公式",{"key":28,"text":607,"correct":26},"抗剪强度公式",{"key":31,"text":609,"correct":26},"摩尔-库仑理论",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]