[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":543},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,21,50,1656,[13,34,42,54,62,70,82,91,99,107,119,127,139,147,159,171,183,195,207,215,230,238,250,262,274,286,294,302,310,318,326,334,342,354,362,374,387,399,411,424,432,444,457,469,477,490,503,514,522,534],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},959069,1,"单选题","导流建筑物级别划分时，当保护对象为3、4级永久性水工建筑物时，导流建筑物的级别为( )级。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","2",false,{"key":24,"text":25,"correct":22},"B","3",{"key":27,"text":28,"correct":22},"C","4",{"key":30,"text":31,"correct":32},"D","5",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},959070,"导流建筑物级别划分时，当其他三项指标中至少有1项满足3级指标，使用年限大于3年时，导流建筑物的级别为( )级。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":30,"analysis":33},959071,"3级导流建筑物洪水标准，对土石材质导流建筑物洪水重现期为( )年。",[46,48,50,52],{"key":20,"text":47,"correct":22},"5～3",{"key":24,"text":49,"correct":22},"10～5",{"key":27,"text":51,"correct":22},"20～10",{"key":30,"text":53,"correct":32},"50～20",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":20,"analysis":33},959072,"5级导流建筑物洪水标准，对混凝土材质导流建筑物洪水重现期为( )年。",[58,59,60,61],{"key":20,"text":47,"correct":32},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":63,"libraryId":5,"type":15,"typeLabel":16,"stem":64,"options":65,"answer":27,"analysis":33},959073,"导流建筑物级别划分时，当使用年限为3～1.5年时，导流建筑物的级别为( )级。",[66,67,68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},959074,"工程的总工期是指( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"主体工程施工期",{"key":24,"text":77,"correct":22},"主体工程施工期和工程完建期之和",{"key":27,"text":79,"correct":32},"工程准备期、主体工程施工期和工程完建期之和",{"key":30,"text":81,"correct":22},"工程筹建期、工程准备期、主体工程施工期和工程完建期之和",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},959075,"低温季节混凝土施工气温标准为日平均气温低于( )℃。",[86,88,90],{"key":20,"text":87,"correct":22},"-20",{"key":24,"text":89,"correct":22},"-10",{"key":27,"text":31,"correct":32},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},959076,"导流建筑物级别划分时，当失事后果为淹没一般城镇、工矿企业或影响工程总工期及第一台(批)机组发电而造成较大经济损失时，导流建筑物的级别为( )级。",[95,96,97,98],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":27,"analysis":33},959077,"4级导流建筑物洪水标准，对土石材质导流建筑物洪水重现期为( )年。",[103,104,105,106],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":32},{"key":30,"text":53,"correct":22},{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":30,"analysis":33},959078,"应根据( )等条件选择防渗墙造孔机械。",[111,113,115,117],{"key":20,"text":112,"correct":22},"地层特性、机械大小",{"key":24,"text":114,"correct":22},"造孔深度、机械费用",{"key":27,"text":116,"correct":22},"墙厚、施工环境",{"key":30,"text":118,"correct":32},"地层特性、造孔深度和墙厚",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":27,"analysis":33},959079,"3级导流建筑物洪水标准，对混凝土材质导流建筑物洪水重现期为( )年。",[123,124,125,126],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":22},{"key":27,"text":51,"correct":32},{"key":30,"text":53,"correct":22},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},959080,"防渗墙孔长度应综合分析地层特性、槽孔深浅、造孔机具性能、工期要求和混凝土生产能力等因素确定，一般可为( )。",[131,133,135,137],{"key":20,"text":132,"correct":22},"5m以下",{"key":24,"text":134,"correct":22},"5m",{"key":27,"text":136,"correct":32},"5～9m",{"key":30,"text":138,"correct":22},"9m以上",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},959081,"导流建筑物级别划分时，当保护对象为1、2级永久性水工建筑物时，导流建筑物的级别为( )级。",[143,144,145,146],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":27,"analysis":33},959082,"分期导流中，河床束窄系数可用( )。",[151,153,155,157],{"key":20,"text":152,"correct":22},"30%～50%",{"key":24,"text":154,"correct":22},"40%～50%",{"key":27,"text":156,"correct":32},"40%～60%",{"key":30,"text":158,"correct":22},"40%～70%",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},959083,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，3级土石坝校核标准为( )年一遇。",[163,165,167,169],{"key":20,"text":164,"correct":22},"100～50",{"key":24,"text":166,"correct":32},"200～100",{"key":27,"text":168,"correct":22},"500～200",{"key":30,"text":170,"correct":22},"1000～500",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":33},959084,"水流条件复杂或在运用中有通航、过木、冲沙、排冰等综合要求的大型导流工程，在设计中应( )。",[175,177,179,181],{"key":20,"text":176,"correct":22},"不进行导流水工模型试验",{"key":24,"text":178,"correct":32},"进行导流水工模型试验",{"key":27,"text":180,"correct":22},"做动床模型试验",{"key":30,"text":182,"correct":22},"不做动床模型试验",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":30,"analysis":33},959085,"封堵工程施工阶段的导流设计标准，可根据工程重要性、失事后果等因素在该时段( )范围内选定。",[187,189,191,193],{"key":20,"text":188,"correct":22},"5～10年重现期的月或旬平均流量",{"key":24,"text":190,"correct":22},"5～10年重现期的瞬时流量",{"key":27,"text":192,"correct":22},"5～20年重现期的月或旬平均流量",{"key":30,"text":194,"correct":32},"5～20年重现期的瞬时流量",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":30,"analysis":33},959086,"基岩灌浆处理应在分析研究( )等因素后选择确定。",[199,201,203,205],{"key":20,"text":200,"correct":22},"基岩地质条件、建筑物类型和级别、施工机械",{"key":24,"text":202,"correct":22},"承受水头、地基应力和变位、施工技术",{"key":27,"text":204,"correct":22},"基岩地质条件、地基应力和变位、施工周期",{"key":30,"text":206,"correct":32},"基岩地质条件、建筑物类型和级别、承受水头、地基应力和变位",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},959087,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，1级土石坝设计标准为( )年一遇。",[211,212,213,214],{"key":20,"text":164,"correct":22},{"key":24,"text":166,"correct":22},{"key":27,"text":168,"correct":32},{"key":30,"text":170,"correct":22},{"id":216,"libraryId":5,"type":217,"typeLabel":218,"stem":219,"options":220,"answer":229,"analysis":33},959088,2,"多选题","研究主体工程施工目的是( )。",[221,223,225,227],{"key":20,"text":222,"correct":32},"正确选择水工枢纽布置和建筑物型式",{"key":24,"text":224,"correct":32},"保证工程质量与施工安全",{"key":27,"text":226,"correct":32},"论证施工总进度的合理性和可行性",{"key":30,"text":228,"correct":32},"为编制工程概算提供需求的资料","ABCD",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},959089,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，3级混凝土坝设计标准为( )年一遇。",[234,235,236,237],{"key":20,"text":53,"correct":32},{"key":24,"text":164,"correct":22},{"key":27,"text":166,"correct":22},{"key":30,"text":168,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},959090,"概算定额是在( )的基础上编制的。",[242,244,246,248],{"key":20,"text":243,"correct":22},"劳动定额",{"key":24,"text":245,"correct":22},"施工定额",{"key":27,"text":247,"correct":32},"预算定额",{"key":30,"text":249,"correct":22},"企业定额",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},959091,"地基处理属隐蔽性工程，必须根据水工建筑物对地基的要求，认真分析地质条件，进行技术经济比较，选择施工方案。重要工程须通过现场试验验证，确定地基处理( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"各种参数、时间",{"key":24,"text":257,"correct":22},"施工程序、规模",{"key":27,"text":259,"correct":22},"施工程序和工艺、时间",{"key":30,"text":261,"correct":32},"各种参数、施工程序和工艺",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},959092,"进行( )，是主体工程施工组织设计的重要组成部分。",[266,268,270,272],{"key":20,"text":267,"correct":32},"施工方案的论证与技术经济比较",{"key":24,"text":269,"correct":22},"施工方案的论证",{"key":27,"text":271,"correct":22},"技术经济比较",{"key":30,"text":273,"correct":22},"经济评价",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},959093,"为( )，应编制各方案控制性施工总进度表，提出准备工程工期，开工、截流、蓄水、发电(或受益)日期，总工期和施工强度等指标。",[278,280,282,284],{"key":20,"text":279,"correct":22},"单项工程施工进度与施工总进度相互协调、选择枢纽布置、",{"key":24,"text":281,"correct":22},"选择建筑物型式、单项工程施工进度与施工总进度相互协调",{"key":27,"text":283,"correct":22},"单项工程施工进度与施工总进度相互协调",{"key":30,"text":285,"correct":32},"选择枢纽布置、建筑物型式和施工导流方案",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},959094,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，2级混凝土坝设计标准为( )年一遇。",[290,291,292,293],{"key":20,"text":53,"correct":22},{"key":24,"text":164,"correct":32},{"key":27,"text":166,"correct":22},{"key":30,"text":168,"correct":22},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},959095,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，2级土石坝校核标准为( )年一遇。",[298,299,300,301],{"key":20,"text":164,"correct":22},{"key":24,"text":166,"correct":22},{"key":27,"text":168,"correct":32},{"key":30,"text":170,"correct":22},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},959096,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，1级混凝土坝设计标准为( )年一遇。",[306,307,308,309],{"key":20,"text":53,"correct":22},{"key":24,"text":164,"correct":22},{"key":27,"text":166,"correct":32},{"key":30,"text":168,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},959097,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，2级混凝土坝校核标准为( )年一遇。",[314,315,316,317],{"key":20,"text":53,"correct":22},{"key":24,"text":164,"correct":22},{"key":27,"text":166,"correct":32},{"key":30,"text":168,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},959098,"导流建筑物级别划分时，当失事后果为淹没重要城镇、工矿企业、交通干线或推迟总工期及第一台(批)机组发电而造成重大灾害和损失，保护对象为有特殊要求的1级永久性水工建筑物时，导流建筑物的级别为( )。",[322,323,324,325],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},959099,"5级导流建筑物洪水标准，对土石材质导流建筑物洪水重现期为( )年。",[330,331,332,333],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":32},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},959100,"导流建筑物级别划分时，当其他三项指标中至少有1项满足3级指标，保护对象为有特殊要求的1级永久性水工建筑物时，导流建筑物的级别为( )级。",[338,339,340,341],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},959101,"地基灌浆一般按照( )进行。",[346,348,350,352],{"key":20,"text":347,"correct":22},"分序逐渐加密的方法",{"key":24,"text":349,"correct":32},"先固结、后帷幕的顺序",{"key":27,"text":351,"correct":22},"先帷幕、后固结的顺序",{"key":30,"text":353,"correct":22},"软基灌浆的方法",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},959102,"导流建筑物级别划分时，在失事后果为淹没一般城镇、工矿企业或影响工程总工期及第一台(批)机组发电而造成较大经济损失。使用年限和临时性水工建筑物级别不定的情况下，当保护对象为有特殊要求的1级永久性水工建筑物时，导流建筑物的级别为( )。",[358,359,360,361],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":22},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},959103,"施工总进度的表示形式主要有( )。",[366,368,370,372],{"key":20,"text":367,"correct":22},"散点图、横道图、写线图",{"key":24,"text":369,"correct":32},"横道图、网络图、斜线图",{"key":27,"text":371,"correct":22},"网络图、直方图、横道图",{"key":30,"text":373,"correct":22},"散点图、网络图、直方图",{"id":375,"libraryId":5,"type":217,"typeLabel":218,"stem":376,"options":377,"answer":386,"analysis":33},959104,"关于施工支洞布置说法正确的有( )。",[378,380,382,384],{"key":20,"text":379,"correct":32},"采用钻爆法施工时，施工支洞间距不宜超过3km",{"key":24,"text":381,"correct":22},"平硐支洞轴线与主洞轴线交角不宜小于30°，且应在交叉口设置不小于20m的平段",{"key":27,"text":383,"correct":22},"平硐支洞纵坡：有轨运输纵坡不超过2％；无轨运输纵坡不超过9％，相应限制坡长l50m；局部最大纵坡不宜大于12％",{"key":30,"text":385,"correct":32},"斜井支洞的倾角不宜大于25°，井身纵断面不宜变坡与转弯，下水平段长度不宜小于20m","AD",{"id":388,"libraryId":5,"type":217,"typeLabel":218,"stem":389,"options":390,"answer":229,"analysis":33},959105,"坝料上坝运输方式应根据( )等资料，通过技术经济比较后选定。",[391,393,395,397],{"key":20,"text":392,"correct":32},"运输量",{"key":24,"text":394,"correct":32},"开采、运输设备型号",{"key":27,"text":396,"correct":32},"运距和运费",{"key":30,"text":398,"correct":32},"地形条件以及临建工程量",{"id":400,"libraryId":5,"type":217,"typeLabel":218,"stem":401,"options":402,"answer":229,"analysis":33},959106,"碾压式土石坝施工的料场规划原则有( )。",[403,405,407,409],{"key":20,"text":404,"correct":32},"料物物理力学性质符合坝体用料要求，质地较均一；储量相对集中，料层厚，总储量能满足坝体填筑需用量",{"key":24,"text":406,"correct":32},"有一定的备用料区，或保留部分近距离料场作为坝体合龙和抢拦洪高程用；按坝体不同部位合理使用各种不同的料场，减少坝料加工",{"key":27,"text":408,"correct":32},"料场剥离层薄，便于开采，获得率较高；采集工作面开阔，料物运距较短，附近有足够的废料堆场",{"key":30,"text":410,"correct":32},"不占或少占耕地、林场，特别要注意环保要求",{"id":412,"libraryId":5,"type":217,"typeLabel":218,"stem":413,"options":414,"answer":423,"analysis":33},959107,"下列选项属于低温季节混凝土施工保温防冻措施的是( )。",[415,417,419,421],{"key":20,"text":416,"correct":32},"混凝土浇筑温度：大坝不宜低于5℃，厂房不宜低于10℃",{"key":24,"text":418,"correct":32},"在负温的基岩或老混凝土面上筑浇时，应将基岩或老混凝土加热至正温，加热深度应不小于10cm，并要求上下温差不超过15～20℃",{"key":27,"text":420,"correct":32},"采用保温模板，且在整个低温期间不拆除",{"key":30,"text":422,"correct":22},"掺加气剂，掺气量通过经验确定","ABC",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},959108,"4级导流建筑物洪水标准，对混凝土材质导流建筑物洪水重现期为( )年。",[428,429,430,431],{"key":20,"text":47,"correct":22},{"key":24,"text":49,"correct":32},{"key":27,"text":51,"correct":22},{"key":30,"text":53,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":30,"analysis":33},959109,"概(估)算的编制步骤是( )。",[436,438,440,442],{"key":20,"text":437,"correct":22},"直接用已有的类似工程概算乘以一个合适的系数",{"key":24,"text":439,"correct":22},"套定额、算单价、算工程费用、汇总成概算",{"key":27,"text":441,"correct":22},"算基础价格、套定额、算单价、算工程费用、汇总成概算",{"key":30,"text":443,"correct":32},"收集资料，编写概算编制大纲，确定编制原则和依据，确定基础价格的基本条件和计算参数，根据编制大纲、工程设计图纸等合理划分工程项目类别和项目级别，按照工程项目和编制大纲，计算各个项目的基础价格，按照设计图纸确定工程量，编制各分部工程概算；编制分年度投资、资金流量等；编制概算和相应编制说明等。",{"id":445,"libraryId":5,"type":217,"typeLabel":218,"stem":446,"options":447,"answer":456,"analysis":33},959110,"封堵下闸的设计流量可用( )分析确定。",[448,450,452,454],{"key":20,"text":449,"correct":22},"封堵时段5～20年重现期的瞬时流量",{"key":24,"text":451,"correct":22},"封堵时段5～10年重现期的瞬时流量",{"key":27,"text":453,"correct":32},"封堵时段5～10年重现期的月或旬平均流量",{"key":30,"text":455,"correct":32},"实测水文统计资料","CD",{"id":458,"libraryId":5,"type":217,"typeLabel":218,"stem":459,"options":460,"answer":229,"analysis":33},959111,"土石方开挖主要的设计问题包括( )。",[461,463,465,467],{"key":20,"text":462,"correct":32},"岩石或土的等级确定；开挖方法和开挖顺序的确定",{"key":24,"text":464,"correct":32},"岩石开挖爆破参数设计；保护层厚度的确定",{"key":27,"text":466,"correct":32},"道路规划和渣场布置；挖运机械设备的造型与数量的确定",{"key":30,"text":468,"correct":32},"排水设计；石渣的利用规划等",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},959112,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，1级土石坝校核标准为( )年一遇。",[473,474,475,476],{"key":20,"text":164,"correct":22},{"key":24,"text":166,"correct":22},{"key":27,"text":168,"correct":22},{"key":30,"text":170,"correct":32},{"id":478,"libraryId":5,"type":217,"typeLabel":218,"stem":479,"options":480,"answer":489,"analysis":33},959113,"控制性施工过程中安排其他单项工程的施工进度时需要考虑的主要原则包括( )。",[481,483,485,487],{"key":20,"text":482,"correct":32},"施工期洪水的影响",{"key":24,"text":484,"correct":32},"水库蓄水的要求",{"key":27,"text":486,"correct":22},"施工期气温的影响",{"key":30,"text":488,"correct":32},"避免平面上的互相干扰","ABD",{"id":491,"libraryId":5,"type":217,"typeLabel":218,"stem":492,"options":493,"answer":502,"analysis":33},959114,"符合下述( )条件的单项工程施工方案宜作重点研究。",[494,496,498,500],{"key":20,"text":495,"correct":32},"控制进度的工程",{"key":24,"text":497,"correct":22},"所占投资比重较小的工程",{"key":27,"text":499,"correct":32},"影响施工安全或施工质量的工程",{"key":30,"text":501,"correct":32},"施工难度较大或用新技术施工的工程。","ACD",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},959115,"工程建设期一般划分为4个施工阶段，一般从河床基坑开挖或从引水道或厂房开工起，至第一台机组发电或工程开始受益为止的期限，称为( )。",[507,509,511,512],{"key":20,"text":508,"correct":22},"工程筹建期",{"key":24,"text":510,"correct":22},"工程准备期",{"key":27,"text":75,"correct":32},{"key":30,"text":513,"correct":22},"工程完建期",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},959116,"导流泄水建筑物封堵后，如永久性泄洪建筑物尚未具备设计泄洪能力，坝体度汛洪水标准应分析坝体施工和运行要求后按规范规定执行，3级土石坝设计标准为( )年一遇。",[518,519,520,521],{"key":20,"text":164,"correct":32},{"key":24,"text":166,"correct":22},{"key":27,"text":168,"correct":22},{"key":30,"text":170,"correct":22},{"id":523,"libraryId":5,"type":217,"typeLabel":218,"stem":524,"options":525,"answer":229,"analysis":33},959117,"出渣道路布置原则为( )。",[526,528,530,532],{"key":20,"text":527,"correct":32},"主体工程土石方开挖出渣道路的布置应根据开挖方式、施工进度、运输强度、车型和地形条件等统一规划",{"key":24,"text":529,"correct":32},"根据开挖进度、开挖方式、运输强度、车型和地形等条件，参照规范确定出渣道路等级",{"key":27,"text":531,"correct":32},"进入基坑的出渣道路受上、下游围堰高程及位置限制，且使用期较短，按上述技术标准布置有困难时，最大纵坡可视运输设备性能、纵坡长度等具体情况酌情加大至12%～15%",{"key":30,"text":533,"correct":32},"利用工地永久公路及场内道路，使同一道路满足多种需要。能满足工程后期需要，不占压建筑物部位",{"id":535,"libraryId":5,"type":217,"typeLabel":218,"stem":536,"options":537,"answer":229,"analysis":33},959118,"研究主体工程施工的目的是( )。",[538,539,540,541],{"key":20,"text":222,"correct":32},{"key":24,"text":224,"correct":32},{"key":27,"text":226,"correct":32},{"key":30,"text":542,"correct":32},"为编制工程概算提供需求的资料。",[544,547,550,553,556,559],{"id":15,"name":545,"category":7,"favorite":546},"领导干部任职前廉政法规知识测试题",92,{"id":548,"name":549,"category":7,"favorite":15},595,"建筑结构与设备",{"id":551,"name":552,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":554,"name":555,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":557,"name":558,"category":7,"favorite":8},534,"BIM工程师",{"id":560,"name":558,"category":7,"favorite":8},535]