[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-695-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},695,"专业知识（水利水电）","建筑工程",0,20,50,1656,[13,34,46,61,74,86,98,110,118,130,142,154,166,178,190,202,214,227,239,252,264,276,288,300,310,322,330,343,355,367,379,391,399,408,420,432,444,457,465,473,481,497,509,520,529,537,544,556,568,576],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},959019,1,"单选题","水利工程费用组成内容为( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程费、独立费用、基本预备费、价差预备费、建设期融资利息",false,{"key":24,"text":25,"correct":26},"B","工程费、独立费用、预备费、建设期融资利息",true,{"key":28,"text":29,"correct":22},"C","枢纽建筑物费、建设征地与移民安置费用、独立费用、基本预备费、价差预备费、建设期贷款利息",{"key":31,"text":32,"correct":22},"D","枢纽建筑物费、建设征地与移民安置费用、预备费、建设期融资利息","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},959020,"建设工程投资的静态投资部分不包括( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"基本预备费",{"key":24,"text":41,"correct":26},"建设期融资利息",{"key":28,"text":43,"correct":22},"设备工器具购置费",{"key":31,"text":45,"correct":22},"建筑及安装工程费",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":60,"analysis":33},959021,2,"多选题","施工总布置就是根据工程特点和施工条件，研究解决施工期间所需的施工工厂、交通道路、仓库、房屋、动力、给水排水管线以及其他施工设施的( )问题。",[52,54,56,58],{"key":20,"text":53,"correct":26},"平面布置",{"key":24,"text":55,"correct":26},"立面布置",{"key":28,"text":57,"correct":22},"时间规划",{"key":31,"text":59,"correct":22},"空间规划","AB",{"id":62,"libraryId":5,"type":48,"typeLabel":49,"stem":63,"options":64,"answer":73,"analysis":33},959022,"施工总布置方案比较应定性分析以下方面的问题( )。",[65,67,69,71],{"key":20,"text":66,"correct":26},"布置方案能否充分发挥施工工厂的生产能力，能否满足施工总进度和施工强度的要求",{"key":24,"text":68,"correct":26},"施工设施、站场、临时建筑物的协调和干扰情况",{"key":28,"text":70,"correct":26},"施工分区的合理性",{"key":31,"text":72,"correct":26},"当地现有企业为工程施工服务的可能性和合理性","ABCD",{"id":75,"libraryId":5,"type":48,"typeLabel":49,"stem":76,"options":77,"answer":73,"analysis":33},959023,"施工导流设计的主要任务是( )。",[78,80,82,84],{"key":20,"text":79,"correct":26},"分析研究水文、地形、地质、水文地质、枢纽布置及施工条件等基本资料",{"key":24,"text":81,"correct":26},"选定导流方式、导流标准，确定导流设计流量，划分导流时段",{"key":28,"text":83,"correct":26},"选择导流方案及导流建筑物的型式，确定导流建筑物的布置、构造及尺寸",{"key":31,"text":85,"correct":26},"确定导流建筑物的修建、拆除、封堵的施工方法以及截断河床水流、拦洪度汛和基坑排水等措施",{"id":87,"libraryId":5,"type":48,"typeLabel":49,"stem":88,"options":89,"answer":73,"analysis":33},959024,"进行施工方案选择应遵循的原则有( )。",[90,92,94,96],{"key":20,"text":91,"correct":26},"能保证工程质量和施工安全，辅助工程量及施工附加量小，施工成本低，施工工期短",{"key":24,"text":93,"correct":26},"先后作业之间、土建工程与机电安装之间、各道工序之间协调均衡，干扰较小",{"key":28,"text":95,"correct":26},"施工强度和施工设备、材料、劳动力等资源需求较均衡",{"key":31,"text":97,"correct":26},"技术先进、可靠",{"id":99,"libraryId":5,"type":48,"typeLabel":49,"stem":100,"options":101,"answer":73,"analysis":33},959025,"从施工组织设计角度来看，混凝土工程施工的重要设计问题包括( )。",[102,104,106,108],{"key":20,"text":103,"correct":26},"混凝土施工方案的选择",{"key":24,"text":105,"correct":26},"混凝土浇筑设备的选择与布置",{"key":28,"text":107,"correct":26},"混凝土温度控制措施的确定与参数设计",{"key":31,"text":109,"correct":26},"混凝土运输方式的选择与线路布置",{"id":111,"libraryId":5,"type":48,"typeLabel":49,"stem":112,"options":113,"answer":73,"analysis":33},959026,"混凝土施工包括混凝土运输、混凝土仓面浇筑、混凝土的养护与温控等重要环节。从施工组织设计角度来看，重要的设计问题包括( )。",[114,115,116,117],{"key":20,"text":103,"correct":26},{"key":24,"text":105,"correct":26},{"key":28,"text":107,"correct":26},{"key":31,"text":109,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},959027,"河道截流的原则之一，河道截流前，泄水道内围堰或其他障碍物应予( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"保护",{"key":24,"text":125,"correct":26},"清除",{"key":28,"text":127,"correct":22},"加固",{"key":31,"text":129,"correct":22},"拆除",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},959028,"我国现行施工组织设计规范把岩土分为( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"土、松土、普通土、硬土",{"key":24,"text":137,"correct":26},"土与岩石两大类",{"key":28,"text":139,"correct":22},"松土、普通土、硬土三类四个级别",{"key":31,"text":141,"correct":22},"软石、坚石、特坚石三类十二个级别",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},959029,"施工总布置应充分掌握和综合( )等因素。",[146,148,150,152],{"key":20,"text":147,"correct":22},"分析枢纽布置，主体建筑物规模、型式、特点，各种临时设施",{"key":24,"text":149,"correct":22},"分析枢纽布置，主体建筑物规模、型式、特点、施工条件，施工场地内外关系",{"key":28,"text":151,"correct":26},"分析枢纽布置，主体建筑物规模、型式、特点、施工条件和工程所在地区社会、经济、自然条件",{"key":31,"text":153,"correct":22},"分析枢纽布置，施工条件和工程所在地区社会、经济、自然条件，各种临时设施",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},959030,"防渗墙施工平台高程应高于施工时段设计最高水位2m以上，并埋设主孔口导向槽板，以便槽孔内废浆、岩屑等杂物顺利排除。平台的平面尺寸应满足( )要求。",[158,160,162,164],{"key":20,"text":159,"correct":26},"造孔、清渣、混凝土浇筑和交通",{"key":24,"text":161,"correct":22},"造孔、混凝土浇筑、混凝土运输",{"key":28,"text":163,"correct":22},"造孔、清渣、混凝土运输",{"key":31,"text":165,"correct":22},"造孔、清渣、混凝土浇筑、使用施工机械",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},959031,"防渗墙槽孔长度应综合分析地层特性、槽孔深浅、造孔机具性能、工期要求和混凝土生产能力等因素确定，一般可为( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"5m以下",{"key":24,"text":173,"correct":22},"5m",{"key":28,"text":175,"correct":26},"5～9m",{"key":31,"text":177,"correct":22},"9m以上",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},959032,"坝基土石方开挖应( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"自下而上一次开挖",{"key":24,"text":185,"correct":22},"自下而上分层开挖",{"key":28,"text":187,"correct":26},"自上而下分层开挖",{"key":31,"text":189,"correct":22},"自上而下一次开挖",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},959033,"坝基开挖应在截流前完成或基本完成两岸水上部分。水上、水下的分界高程可根据( )等因素分析确定。",[194,196,198,200],{"key":20,"text":195,"correct":22},"地形、地貌、施工机械",{"key":24,"text":197,"correct":22},"地质、施工机械",{"key":28,"text":199,"correct":22},"施工机械、开挖时段和水文条件",{"key":31,"text":201,"correct":26},"地形、地质、开挖时段和水文条件",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},959034,"地基保护层以上土石方开挖，一般( )。",[206,208,210,212],{"key":20,"text":207,"correct":22},"采取浅孔小炮或人工撬挖",{"key":24,"text":209,"correct":26},"采取延长药包、梯段爆破",{"key":28,"text":211,"correct":22},"采取预裂防震措施",{"key":31,"text":213,"correct":22},"采用辐射孔爆破",{"id":215,"libraryId":5,"type":48,"typeLabel":49,"stem":216,"options":217,"answer":226,"analysis":33},959035,"分期围堰导流适用于( )的坝址。",[218,220,222,224],{"key":20,"text":219,"correct":26},"河流流量小",{"key":24,"text":221,"correct":22},"河流流量大",{"key":28,"text":223,"correct":26},"河槽宽",{"key":31,"text":225,"correct":26},"覆盖层薄","ACD",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":20,"analysis":33},959036,"适用于河流流量大、河槽宽、覆盖层薄的坝址的导流方式是( )。",[231,233,235,237],{"key":20,"text":232,"correct":26},"分期围堰",{"key":24,"text":234,"correct":22},"全段围堰",{"key":28,"text":236,"correct":22},"断流围堰隧洞",{"key":31,"text":238,"correct":22},"断流围堰明渠",{"id":240,"libraryId":5,"type":48,"typeLabel":49,"stem":241,"options":242,"answer":251,"analysis":33},959037,"地下工程的( )是选择地下工程施工方法及参数的主要依据。",[243,245,247,249],{"key":20,"text":244,"correct":22},"型式",{"key":24,"text":246,"correct":22},"断面尺寸",{"key":28,"text":248,"correct":26},"围岩类别",{"key":31,"text":250,"correct":26},"产状构造特征","CD",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},959038,"导流标准是选择( )进行施工导流设计的标准。",[256,258,260,262],{"key":20,"text":257,"correct":22},"导流建筑物级别",{"key":24,"text":259,"correct":26},"导流设计流量",{"key":28,"text":261,"correct":22},"围堰",{"key":31,"text":263,"correct":22},"泄水建筑物",{"id":265,"libraryId":5,"type":48,"typeLabel":49,"stem":266,"options":267,"answer":73,"analysis":33},959039,"初期导流建筑物设计洪水标准应根据建筑物的类型和级别在规范规定幅度内选择。在( )情况下，导流建筑物洪水标准可用规范中的上限值。",[268,270,272,274],{"key":20,"text":269,"correct":26},"河流水文实测资料系列较短(小于20年)，或工程处于暴雨中心区",{"key":24,"text":271,"correct":26},"采用新型围堰结构型式",{"key":28,"text":273,"correct":26},"处于关键施工阶段，失事后可能导致严重后果",{"key":31,"text":275,"correct":26},"工程规模、投资和技术难度用上限值与下限值相差不大",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},959040,"一个工程从开工到完工，其导流标准( )。",[280,282,284,286],{"key":20,"text":281,"correct":22},"是初期导流标准",{"key":24,"text":283,"correct":22},"是中期导流标准",{"key":28,"text":285,"correct":22},"是初期、中期、后期导流标准中的最大值",{"key":31,"text":287,"correct":26},"是随着不同导流分期变化的",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":31,"analysis":33},959041,"下列选项中均为导流泄水建筑物的是( )。",[292,294,296,298],{"key":20,"text":293,"correct":22},"导流隧洞、导流涵洞、围堰、坝体梳齿",{"key":24,"text":295,"correct":22},"导流明渠、围堰、导流涵洞、坝体缺口、坝体梳齿",{"key":28,"text":297,"correct":22},"导流明渠、导流涵洞、围堰、坝体缺口、坝体梳齿",{"key":31,"text":299,"correct":26},"导流涵洞、坝体临时底孔、坝体缺口、坝体梳齿",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":28,"analysis":33},959042,"日平均气温低于( )℃时，应按低温季节进行混凝土施工。",[304,306,308],{"key":20,"text":305,"correct":22},"-20",{"key":24,"text":307,"correct":22},"-10",{"key":28,"text":309,"correct":26},"5",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},959043,"双戗和多戗立堵截流，可分担总落差，改善截流难度，适用于截流落差( )的情况。",[314,316,318,320],{"key":20,"text":315,"correct":22},"小于3.5m",{"key":24,"text":317,"correct":22},"等于3.5m",{"key":28,"text":319,"correct":26},"大于3.5m",{"key":31,"text":321,"correct":22},"不超过3.5m",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},959044,"单戗立堵截流简单易行，辅助设备少，较经济，适用于截流落差( )的情况。",[326,327,328,329],{"key":20,"text":315,"correct":22},{"key":24,"text":317,"correct":22},{"key":28,"text":319,"correct":22},{"key":31,"text":321,"correct":26},{"id":331,"libraryId":5,"type":48,"typeLabel":49,"stem":332,"options":333,"answer":342,"analysis":33},959045,"出渣道路布置原则包括( )。",[334,336,338,340],{"key":20,"text":335,"correct":26},"主体工程土石方明挖出渣道路的布置应根据开挖方式、施工进度、运输强度、渣场位置、车型和地形条件等统一规划",{"key":24,"text":337,"correct":26},"进入基坑的出渣道路有困难时，最大纵坡可视运输设备性能、纵坡长度等具体情况酌情加大，但不宜大于15％",{"key":28,"text":339,"correct":26},"能满足工程后期需要，不占压建筑物部位，不占压或少占压深挖部位",{"key":31,"text":341,"correct":22},"短、平、直，尽量平面交叉","ABC",{"id":344,"libraryId":5,"type":48,"typeLabel":49,"stem":345,"options":346,"answer":73,"analysis":33},959046,"编制施工总进度的原则为( )。",[347,349,351,353],{"key":20,"text":348,"correct":26},"严格执行基本建设程序，遵照国家政策、法令和有关规程规范",{"key":24,"text":350,"correct":26},"力求缩短工程建设周期，对控制工程总工期或受洪水威胁的工程和关键项目应重点研究，采取有效的技术和安全措施",{"key":28,"text":352,"correct":26},"各项目施工程序前后兼顾、衔接合理、干扰少，施工均衡；采用平均先进指标，对复杂地基或受洪水制约的工程，宜适当留有余地",{"key":31,"text":354,"correct":26},"在保证工程质量与施工总工期的前提下，充分发挥投资效益",{"id":356,"libraryId":5,"type":48,"typeLabel":49,"stem":357,"options":358,"answer":73,"analysis":33},959047,"坝料上坝方式主要有自卸汽车直接上坝、皮带运送上坝、窄轨机车运送上坝或其组合方式。坝料上坝运输方式应根据( )等资料，通过技术经济比较后选定。",[359,361,363,365],{"key":20,"text":360,"correct":26},"运输量",{"key":24,"text":362,"correct":26},"开采、运输设备型号",{"key":28,"text":364,"correct":26},"运距和运费",{"key":31,"text":366,"correct":26},"地形条件以及临建工程量",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},959048,"坝上坝料运输方式应根据( )等资料，通过技术经济比较后选定。",[371,373,375,377],{"key":20,"text":372,"correct":22},"运输量，运距和运费，地形条件以及临建工程量，坝料类型",{"key":24,"text":374,"correct":22},"运输量，开采、运输设备型号，地形条件以及临建工程量，坝料类型",{"key":28,"text":376,"correct":22},"开采、运输设备型号，运距和运费，坝料类型",{"key":31,"text":378,"correct":26},"运输量，开采、运输设备型号，运距和运费，地形条件以及临建工程量",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},959049,"坝体挡水期导流底孔或导流隧洞等临时泄水建筑物没有封堵或没有下闸情况下的导流称为( )。",[383,385,387,389],{"key":20,"text":384,"correct":22},"前期导流",{"key":24,"text":386,"correct":22},"后期导流",{"key":28,"text":388,"correct":22},"初期导流",{"key":31,"text":390,"correct":26},"中期导流",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},959050,"坝体挡水期导流底孔或导流隧洞等临时泄水建筑物部分或全部封堵或下闸情况下的导流称为( )。",[395,396,397,398],{"key":20,"text":384,"correct":22},{"key":24,"text":386,"correct":26},{"key":28,"text":388,"correct":22},{"key":31,"text":390,"correct":22},{"id":400,"libraryId":5,"type":48,"typeLabel":49,"stem":401,"options":402,"answer":342,"analysis":33},959051,"按照工程建设期间挡水建筑物随时间变化，通常把导流分为( )。",[403,404,405,406],{"key":20,"text":384,"correct":26},{"key":24,"text":390,"correct":26},{"key":28,"text":386,"correct":26},{"key":31,"text":407,"correct":22},"分期导流",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},959052,"水利工程按工程性质分为( )。",[412,414,416,418],{"key":20,"text":413,"correct":26},"枢纽工程、引水工程及河道工程",{"key":24,"text":415,"correct":22},"水库、水电站和其他大型独立建筑物",{"key":28,"text":417,"correct":22},"供水工程、灌溉工程、河湖整治工程和堤防工程",{"key":31,"text":419,"correct":22},"建筑工程、机电设备及安装工程、金属结构设备及安装工程、施工临时工程",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},959053,"工程建设期一般划分为4个施工阶段，工程正式开工前由业主单位负责筹建对外交通、施工用电、通信、征地、移民以及招标、评标、签约等工作，为承包单位进场开工创造条件所需的时间，称为( )。",[424,426,428,430],{"key":20,"text":425,"correct":26},"工程筹建期",{"key":24,"text":427,"correct":22},"工程准备期",{"key":28,"text":429,"correct":22},"主体工程施工期",{"key":31,"text":431,"correct":22},"工程完建期",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},959054,"混凝土施工包括( )等重要环节。",[436,438,440,442],{"key":20,"text":437,"correct":22},"混凝土运输、混凝土仓面浇筑",{"key":24,"text":439,"correct":26},"混凝土运输、混凝土仓面浇筑、混凝土的养护与温控",{"key":28,"text":441,"correct":22},"混凝土生产、混凝土运输、混凝土仓面浇筑、混凝土的养护与温控",{"key":31,"text":443,"correct":22},"混凝土生产、混凝土运输、混凝土仓面浇筑",{"id":445,"libraryId":5,"type":48,"typeLabel":49,"stem":446,"options":447,"answer":456,"analysis":33},959055,"水利工程移民和环境部分划分的各级项目执行( )。",[448,450,452,454],{"key":20,"text":449,"correct":22},"水利工程设计概(估)算编制规定",{"key":24,"text":451,"correct":26},"水利工程建设征地移民补偿投资概(估)算编制规定",{"key":28,"text":453,"correct":26},"水利工程环境保护设计概(估)算编制规定",{"key":31,"text":455,"correct":26},"水土保持工程概(估)算编制规定","BCD",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},959056,"工程建设期一般划分为4个施工阶段，准备工程开工起至河床基坑开挖(河床式)或主体工程开工(引水式)前的工期。所做的必要准备工程一般包括场地平整、场内交通、导流工程、临时建房和施工工厂等，称为( )。",[461,462,463,464],{"key":20,"text":425,"correct":22},{"key":24,"text":427,"correct":26},{"key":28,"text":429,"correct":22},{"key":31,"text":431,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},959057,"适用于河谷狭窄、地质条件允许的坝址的导流方式是( )。",[469,470,471,472],{"key":20,"text":232,"correct":22},{"key":24,"text":234,"correct":22},{"key":28,"text":236,"correct":26},{"key":31,"text":238,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},959058,"适用于河流流量较大，河床一侧有较宽台地、垭口或古河道的坝址的导流方式是( )。",[477,478,479,480],{"key":20,"text":232,"correct":22},{"key":24,"text":234,"correct":22},{"key":28,"text":236,"correct":22},{"key":31,"text":238,"correct":26},{"id":482,"libraryId":5,"type":48,"typeLabel":49,"stem":483,"options":484,"answer":496,"analysis":33},959059,"《水利工程设计概(估)算编制规定》(水总[2002]116)规定，在编制设计概算时，水利工程的独立费由( )和其他项组成。",[485,487,489,491,493],{"key":20,"text":486,"correct":26},"建设管理费",{"key":24,"text":488,"correct":26},"生产准备费",{"key":28,"text":490,"correct":26},"科研勘测设计费",{"key":31,"text":492,"correct":22},"不可预见费",{"key":494,"text":495,"correct":26},"E","建设及施工场地征用费","ABCE",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},959060,"临时度汛洪水标准应根据坝型及坝前拦洪库容确定，混凝土坝拦洪库容在1.0亿～0.1亿m3时，洪水标准为( )。",[501,503,505,507],{"key":20,"text":502,"correct":22},"20～10年",{"key":24,"text":504,"correct":26},"50～20年",{"key":28,"text":506,"correct":22},"不小于50年",{"key":31,"text":508,"correct":22},"100～50年",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},959061,"导流建筑物级别划分时，当其他三项指标中至少有1项满足3级指标，临时性水工建筑物的高度大于50m，库容大于1.0亿m3时，导流建筑物的级别为( )级。",[513,515,517,519],{"key":20,"text":514,"correct":22},"2",{"key":24,"text":516,"correct":26},"3",{"key":28,"text":518,"correct":22},"4",{"key":31,"text":309,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},959062,"临时度汛洪水标准应根据坝型及坝前拦洪库容确定，土石坝拦洪库容大于1.0亿m3时，洪水标准为( )。",[524,525,526,527],{"key":20,"text":502,"correct":22},{"key":24,"text":504,"correct":22},{"key":28,"text":508,"correct":22},{"key":31,"text":528,"correct":26},"不小于100年",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},959063,"导流建筑物级别划分时，当临时性水工建筑物的高度小于15m，库容小于0.1亿m3时，导流建筑物的级别为( )。",[533,534,535,536],{"key":20,"text":514,"correct":22},{"key":24,"text":516,"correct":22},{"key":28,"text":518,"correct":22},{"key":31,"text":309,"correct":26},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":539,"answer":24,"analysis":33},959064,[540,541,542,543],{"key":20,"text":502,"correct":22},{"key":24,"text":504,"correct":26},{"key":28,"text":506,"correct":22},{"key":31,"text":508,"correct":22},{"id":545,"libraryId":5,"type":48,"typeLabel":49,"stem":546,"options":547,"answer":73,"analysis":33},959065,"分期导流时，一般情况下，在第一期中安排( )施工。",[548,550,552,554],{"key":20,"text":549,"correct":26},"后期导流用的永久性建筑物",{"key":24,"text":551,"correct":26},"发电用的永久性建筑物",{"key":28,"text":553,"correct":26},"通航用的永久性建筑物",{"key":31,"text":555,"correct":26},"排冰、排沙用的永久性建筑物",{"id":557,"libraryId":5,"type":48,"typeLabel":49,"stem":558,"options":559,"answer":342,"analysis":33},959066,"工程进度计划一般分( )。",[560,562,564,566],{"key":20,"text":561,"correct":26},"总进度计划",{"key":24,"text":563,"correct":26},"单项工程进度计划",{"key":28,"text":565,"correct":26},"作业计划",{"key":31,"text":567,"correct":22},"施工措施计划",{"id":569,"libraryId":5,"type":48,"typeLabel":49,"stem":570,"options":571,"answer":456,"analysis":33},959067,"分期导流适用于( )的坝址。",[572,573,574,575],{"key":20,"text":219,"correct":22},{"key":24,"text":221,"correct":26},{"key":28,"text":223,"correct":26},{"key":31,"text":225,"correct":26},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":578,"answer":24,"analysis":33},959068,[579,580,581,582],{"key":20,"text":514,"correct":22},{"key":24,"text":516,"correct":26},{"key":28,"text":518,"correct":22},{"key":31,"text":309,"correct":22},[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]